Is there capacity at Crofton? I'm fairly sure there's not.Northern - Too many fleets already, shame as you could give the maintenance problem back to Alstom at Crofton.
Is there capacity at Crofton? I'm fairly sure there's not.Northern - Too many fleets already, shame as you could give the maintenance problem back to Alstom at Crofton.
A few 158's to replace the 155's would remove a sub fleet and the issues that creates and also helps pathing the Hull - York services. Some for the North East to replace their local 156's would improve the passenger service but is it worth the cost/trouble of doing it?I believe Neptune has said that Northern aren’t planning on Northern taking on 158s cascaded from other TOCs, which is a shame as I’d rather see a bunch of those in the North East rather in the interim than the 175s or running the 156s into the ground for another 7 years
Not at present, would need a big investment so another reason it will not happen.Is there capacity at Crofton? I'm fairly sure there's not.
A few 158's to replace the 155's would remove a sub fleet and the issues that creates and also helps pathing the Hull - York services. Some for the North East to replace their local 156's would improve the passenger service but is it worth the cost/trouble of doing it?
Do you allow 27 newer trains go to scrap or cascade to start second generation replacement to buy sometime for when the next generation units are delivered late / don't work or the orders get cut when the money runs out?
== Doublepost prevention - post automatically merged: ==
Not at present, would need a big investment so another reason it will not happen.
Has the lease (due to end Feb 2024?) been extended?TPE aren’t replacing the LHCS.
I can’t remember which magazine, but an interview with TPE’s MD (yes this is post takeover) said they aren’t being replaced.Has the lease (due to end Feb 2024?) been extended?
You can't see platform monitors from the drivers seat on a 175, the seat is too far forward from the window.Why not? There is method of working in place for DOO at Chiltern which works just fine. There would be no requirement to fit external cameras and in-cab monitors to the 175s.
As I said on the 175 shortages thread:I assume we're no closer to knowing the fate of the 175 fleet after TfW?
At the moment nobody who knows for certain is in a position to say so publicly on social media, so until there's an official announcement I'd take anything with a pinch of salt.
If you exclude Scotrail who say they don't want anymore secondhand trains
The best guess right now is Chiltern to replace the 68s I'd say.I assume we're no closer to knowing the fate of the 175 fleet after TfW?
You certainly have - I’d better start counting my pound coins!An aternative which I've mentioned before, to avoid splitting the fleet, would be to send all 175s to Northern and for Northern's 170s to go to Chiltern for conversion to 168s and LHCS replacement. Perhaps the 170 depot at Hull could still be used to maintain some of EMR's 170s?
If the rumours are true.Too bad, they'll be getting 'secondhand trains' to replace the HSTs but that's off topic for this thread
TPE will probably get more Azumas to replace the LHCS.
Surely TPE operate neither IETs nor Azumas, the 802s with TPE are 'Nova 1s'.Point of note, they're WoE IETs that are used by TPE. "Azuma" is a dumb brand produced by Virgin / EC Trains.
Given that Northern have been ruled out, GWR does seem like a sensible alternative home for the 175s with GWR losing the Castle HSTs. Yes, they are not running the planned extras to Bristol (via Bristol Parkway) which were envisaged when the IEP and IET fleets were ordered, so there were some spare 800s, but GWR have also extended more services to Carmarthen which I understood was using those spare Bristol units.GWR - Cardiff to Portsmouth and associated services, far more suitable than 16x on that route and again an internal cascade see's 150 replacement / extra capacity.
Indeed it is; the 175s also are hamstrung by not being able to make use of Sprinter differentials, but the big question is the financial one. There have been reports that TfW are unable to extend the lease on the 175s, which on the one hand suggests that the owners already have a new home lined up for them, but that could equally mean that TfW simply do not have any spare cash to extend the lease.Problem is the cost of training / route clearance / leasing charges and operating costs. The big question is do the DfT want cascades like these with the costs involved
I'm sure GWR management would love the 175s, just as they did with the 180s!Given that Northern have been ruled out, GWR does seem like a sensible alternative home for the 175s with GWR losing the Castle HSTs. Yes, they are not running the planned extras to Bristol (via Bristol Parkway) which were envisaged when the IEP and IET fleets were ordered, so there were some spare 800s, but GWR have also extended more services to Carmarthen which I understood was using those spare Bristol units.
To be fair if maintained properly the 175s are great trains, they just haven't been recently.I'm sure GWR management would love the 175s, just as they did with the 180s!
And First Group are going to do a much better job aren't they!To be fair if maintained properly the 175s are great trains, they just haven't been recently.
Well I never said they would necessarily maintane them brilliantly, my point was that if taken care of there's nothing inherently wrong with them.And First Group are going to do a much better job aren't they!![]()
They are Intercity Express Trains. The same as every other IET delivered in the UK.Surely TPE operate neither IETs nor Azumas, the 802s with TPE are 'Nova 1s'.
They are not Intercity Express Trains (capitalised) or IET, those are specifically GWRs.They are Intercity Express Trains. The same as every other IET delivered in the UK.
The 802s were not IEPs delivered under the Intercity Express Programme, but are still Intercity Express Trains.
Because not everyone is train nerds. I use words interchangeably when talking to non train people. They know what you mean, even if it isn't accurate.They are all Hitachi AT300 trains adorned with brand names depending on the company that operates them.
I’m not sure why some people find that difficult to understand.
Only pointing out what has been pointed out on many threads in the past. It’s not exactly difficult for said enthusiasts on here to google it either as they generally have more clues on individual train types than the lay public.Because not everyone is train nerds. I use words interchangeably when talking to non train people. They know what you mean, even if it isn't accurate.
And yes, I know it's the rail forum, but a name doesn't mean everyone here will be an expert on railways.
But I wouldn't call everyone here enthusiasts. People are here simply to discuss rail matters, even if that involves things like removing railways. And why would such people then care about the nuances of rolling stock?Only pointing out what has been pointed out on many threads in the past. It’s not exactly difficult for said enthusiasts on here to google it either as they generally have more clues on individual train types than the lay public.
Seriously? Which EMR 170’s go near Hull and why are you loading capacity issues back onto Neville Hill as a result.
You really need to digest what is explained to you about how Northern’s fleet operations run before making ridiculous repeated arguments and now ridiculous ideas about maintaining someone else’s units that go nowhere near our depot whilst loading issues onto another of our depots, just to get your beloved 175’s to Northern.
EMR don’t serve anywhere near Hull so how would you expect them to get to/from there!?The idea about EMR 170s being maintained at the Hull depot would be so that the staff at the depot wouldn't need training on a different unit type and could continue maintaining 170s.
Nothing appears to be signed and sealed yet, so until we hear an official announcement, it’s probably best to calm down with the crazy ideas that are obviously not going to happen, such as 175s going to Northern, or EMR maintaining their trains way off the network.Nothing appears to be signed and sealed yet, so until we hear an official announcement for the future use of 175s, I think Northern remain a possible option - even if the company big wigs are currently saying there are no plans to take them on. The DfT might have other ideas.
EMR serve Cleethorpes which isn't that far from Hull.EMR don’t serve anywhere near Hull so how would you expect them to get to/from there!?
Nothing appears to be signed and sealed yet, so until we hear an official announcement, it’s probably best to calm down with the crazy ideas that are obviously not going to happen, such as 175s going to Northern, or EMR maintaining their trains way off the network.
EMR serve Cleethorpes which isn't that far from Hull.
Barton on Humber is even closer. I think you'll find that big blue line on the map does complicate things however.EMR serve Cleethorpes which isn't that far from Hull.
Keep telling yourself that.....Nothing appears to be signed and sealed yet, so until we hear an official announcement for the future use of 175s, I think Northern remain a possible option - even if the company bigwigs are currently saying there are no plans to take them on. The DfT might have other ideas.
The DfT aim to run train services as well as possible within the budget set by the treasury, not to keep the 175s in work.Nothing appears to be signed and sealed yet, so until we hear an official announcement for the future use of 175s, I think Northern remain a possible option - even if the company bigwigs are currently saying there are no plans to take them on. The DfT might have other ideas.