Class 172 Production Progress

Status
Not open for further replies.

Techniquest

Veteran Member
Joined
19 Jun 2005
Messages
21,830
Location
Nowhere Heath
I see there's at least 3 172s outside the factory in Derby this morning, viewed via BBC News 24 :lol:

And no, before anyone asks, I don't have the numbers or counting them for sight!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,856
Do recent events mean the last LM 172 to be built at litchurch lane could be the last mainline train built in britain (IEP doesnt count its an airfix kit)

Not really on topic, but an order for Voyager and Meridian pantograph cars or an order of new loco-hauled coaches to be delivered slowly between now and 2050 to replace first the coaches behind the 90s in East Anglia (by the 2020 deadline for power-doors), followed by the IC125s on EMT and on the route to Taunton, Devon and Cornwall and then finally the IC225s along with an order for 180 Electrostar carriges for the ValleyLines (also to be in service by 2020) could save the factory couldn't it? All that rolling stock is needed, so why not order it from the British factory?

172s are airfix kits? Maybe, but I'd be interested to know how many of the components are made in Britain. The 1 o'clock news said somthing about jobs in the supply chain going, so maybe 172s are a bit more British than some seem to be suggesting. Then again, maybe they're not British at all.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,069
Location
Redcar
All that rolling stock is needed, so why not order it from the British factory?

Well apart from the fact that we're unlikely to see another large order for LHCS ;) the main issue there is that you have to put it out to competitive tender. You're not allowed to just ring up Bombardier and say "Hey you know that Derby plant? We want you to start building some LHCS and a few other bits a bobs over the next 50 years!". That just isn't how it's done anymore, other companies have to be allowed to bid on a tender be they Siemens, Alstom, Bombardier, CAF or CSRE any and all have to be able to bid should they wish to.
 

cj_1985

Member
Joined
6 Mar 2010
Messages
845
Location
Lanarkshire
iirc from the news report today...
the UK operation was branded as Bombardier UK... not Bombardier Europe/Canada/Worldwide etc

while they have building facilities and other regional operations in france, germany, italy etc
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,856
Well apart from the fact that we're unlikely to see another large order for LHCS ;) the main issue there is that you have to put it out to competitive tender. You're not allowed to just ring up Bombardier and say "Hey you know that Derby plant? We want you to start building some LHCS and a few other bits a bobs over the next 50 years!". That just isn't how it's done anymore, other companies have to be allowed to bid on a tender be they Siemens, Alstom, Bombardier, CAF or CSRE any and all have to be able to bid should they wish to.

They can tender all they like. If the DfT put out for tender on said stuff, they can look at the bid and decide that company X will be providing jobs in the UK, which will help cut down on the benifits bill, and say "we choose that company". Of course if the Derby bid is much more expensive, or a competing bid much better in some respect, then the DfT will sensibly have to pick the better bid. I can't see why they can't make safeguarding UK jobs an important consideration when deciding who wins the bid for said stock.

As for LHCS, I see two reasons why we will need a new build.
  1. Sleeper services. If they are to continue after life-expiry of the current stock we'll need some more LHCS, and you might as well deploy the same day coaches elsewhere for economy of scale
  2. South of Bristol, West of Newbury. This is just too far out of Paddington to go on a DMU, even a bi-mode one, and wires might not come fast enough. Once the IC125s are gone, we'll need new LHCS on the route.
 

Old Hill Bank

Member
Joined
6 Mar 2010
Messages
971
Location
Kidderminster
Picture of the day on The Railway Centre shows 172 333 at Hagley yesterday, first time one of the LM units has ventured west of Birmingham.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,664
Anyone see ONE Show last night when he tapped the 172 and said derby is still building world class trains....
I was like wow .... well thats not how they seem :)

Joke obviously just reffering to delays and exhaust fiasco etc
 

asylumxl

Established Member
Joined
12 Feb 2009
Messages
4,260
Location
Hiding in your shadow
Seems like they're a bit behind, seeing as I took this...

5912228930_3663a14436_z.jpg


On June 29th :)
 

hougtimo

Member
Joined
28 Feb 2008
Messages
108
is it just me, or does the 172 look a really funny shape? Thin and tall? The bottoms of the doors seem to stand higher than the platform too?

Or are they the same shape as 170s?
 

Techniquest

Veteran Member
Joined
19 Jun 2005
Messages
21,830
Location
Nowhere Heath
Didn't know Chiltern had got their 172s in service now, I had to look a couple of times to check that wasn't a 168!
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,614
Location
Hampshire
is it just me, or does the 172 look a really funny shape? Thin and tall? The bottoms of the doors seem to stand higher than the platform too?

Or are they the same shape as 170s?

I think its down to the use of normal gasket type windows, as opposed to the more expensive ribbon glazing Bombardier have been using for years...

As far as im aware, the body shouldnt be any different to a 170, Bombardier does seem to suffer a lack of imagination to produce a new design of unit - More recyling of the Adtranz design...:lol:
 

Old Hill Bank

Member
Joined
6 Mar 2010
Messages
971
Location
Kidderminster
I think its down to the use of normal gasket type windows, as opposed to the more expensive ribbon glazing Bombardier have been using for years...

As far as im aware, the body shouldnt be any different to a 170, Bombardier does seem to suffer a lack of imagination to produce a new design of unit - More recyling of the Adtranz design...:lol:

If it works dont fix it I say
 

IanPooleTrains

Established Member
Joined
21 Nov 2010
Messages
1,217
Location
Brereton, Rugeley, Staffordshire
I was at Tyseley yesterday with one of me brothers, getting Kinlet Hall when we spoke with a London Midland worker.

He was taking an interest in what we were doing and we had some friendly banter and told him I was hoping for one of the 172s to come into the yard.

He said that one was out and the other three were in the yard and he then said, and these are his words; 'the 172s are worst than the 170s'. he then went on to say that while the 170s were okay, they were plagued with problems with with them, even though the 170s and 172s are almost the same, you know what the problems are with the 170s but with the 172s, they are at least ten times worse.

I get the feeling that some of the people there at LM don't like them!

Also, the date has been pushed back as well for their debut runs, it will now be October. I said that we thought it was August and he said it was but Bombadier were behind on the order but, given current circumstances, understandable.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
What current circumstances could cause 172s to be late? :lol:
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
Don't see why 'current' circumstances would make them delayed though anyway.

That would be true if they were on time up until this point which they certainly were not.

I'd blame it on 'continuing circumstances'.


The circumstances being the fact the Bombardier are crap, and therefore continue to be.
 

tnxrail

Member
Joined
8 May 2011
Messages
224
Location
UK
172338 was out yesterday at same time as the hall video up on YouTube I did over here two drivers talking about the brakes take time to get used as of the power leavels may be one issue.
 
Status
Not open for further replies.