• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Class 172 Production Progress

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
I would hope that the next holders go straight to tendering/bidding, as at least then we have something to look forward to (and not pacers all the time)!

Agreed, but I'm not sure whether *any* company has started tendering for new trains *before* it took over.

We don't have time to waste though, and I hope the new company "hits the ground running" and sorts out some stock quickly.
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,890
Location
South Wales
In the latest issue of the Railway herald magazine it reports that at least 2 chiltern railways class 172's have been completed and are undergoing testing
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,233
Agreed, but I'm not sure whether *any* company has started tendering for new trains *before* it took over.

They can do, assuming OJEU tender notifications are the first stage.

Stagecoach had contract notifications out for new trains shortly after the Anglia and Thameside renewal processes started, eg: http://www.publictenders.net/tender/55993

The franchise bidding procedure was then cancelled after the change of government, so presumably all their rolling stock and finance OJEU notice lapsed.
 
Joined
1 May 2010
Messages
13
Three Chiltern units are complete with the fourth in traction stage. I also believe the 1st one is due for delivery week commencing Monday 14th Feb.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,051
Location
Reston City Centre
They can do, assuming OJEU tender notifications are the first stage.

Stagecoach had contract notifications out for new trains shortly after the Anglia and Thameside renewal processes started, eg: http://www.publictenders.net/tender/55993

The franchise bidding procedure was then cancelled after the change of government, so presumably all their rolling stock and finance OJEU notice lapsed.

That's really interesting, cheers.

Credit to Stagecoach for not wasting time :)
 

trains2064

Member
Joined
23 Jul 2010
Messages
188
No!

Should be mid feb for first 2 then 1 a week from early march. 15 3 car sets first the the 12 2 car sets.

None will enter service till may timetable change. Mileage work ie 1000 fault free miles will be done on the line from tyseley to stratford upon avon as well as at least 1 trip per day to leamington for 100mph running.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,640
Take they will get HST status along with 170/171s ?? Rule book hasnt been updated yet.
 

Voyager 2093

Member
Joined
20 Aug 2007
Messages
494
Location
London
The delivery of the first unit for Chiltern. If I'm correct the first unit is to be delivered next week....

I find it strange there are no pictures....
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,612
Location
Hampshire
The delivery of the first unit for Chiltern. If I'm correct the first unit is to be delivered next week....

I find it strange there are no pictures....

Perhaps because it's a 172? :lol:

Another product of Bombarby & only Bombarby :lol:

Rather doubtfull that the next 172 delivery will be next week - so far, nearly Everything Bombardier has produced has been tested on the Old Dalby test track - so wouldnt it make more sense for Bombardier to keep testing the 172s out on Old Dalby before making the first of Chiltern deliverys?
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,844
Location
UK
Why do they need to test every train when they have such a good record of making well put together trains that should have near 100% reliability?

Oh.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Bombardier really need a factory site like Siemens, with a big test loop- though even that's not infallible, as the 280s have been showing.
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
They do have a test track at Litchurch Lane.

Only the pioneer subclass members are sent to Old Dalby, the Chiltern ones won't be going at all as they're an LO version effectively. All units spewed out will be thrown round Litchurch track a few times, before being delivered. The reasoning being that debugging one member of the class at Old Dalby before the rest are finished will *solve/prevent* all reliability problems.

Hmm...
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,844
Location
UK
Do these have toilets? I hope they can get these right, as a FCC 377/5 in public service had a door that was unable to open properly, and then sticking in a half open position, after it was little over a week old!

God knows what any of these trains will look like after they've been in operation for just a couple of years.

Out of interest, what sort of warranty/maintenance agreement do these trains have? If doors and interior trim start to break and fall off within a matter of weeks/months, I presume Bombardier and the like are liable to make good? I hope the TOC isn't required to waste time and money fixing them, or the cost gets lumped on to higher leasing charges? If it did, I hope that's considered when the train makers bid for contracts.
 

Old Hill Bank

Member
Joined
6 Mar 2010
Messages
971
Location
Kidderminster
They do have a test track at Litchurch Lane.

Only the pioneer subclass members are sent to Old Dalby, the Chiltern ones won't be going at all as they're an LO version effectively. All units spewed out will be thrown round Litchurch track a few times, before being delivered. The reasoning being that debugging one member of the class at Old Dalby before the rest are finished will *solve/prevent* all reliability problems.

Hmm...

LOL the Hmm, let's see what happens in the next week or two!!!

Then there is still the fate of 26 class 150 cattle trucks to be decided!!

Hmm again
 

Kris

Member
Joined
14 Feb 2007
Messages
565
Another thought i've had regarding my earlier point about the length of time power is applied to get to, and maintain speed, is that on a Sprinter with hydraulic transmission, you generally always have to keep some power on to maintain speed, even when going downhill. I believe this may be due to the transmission itself having a "braking" or "lagging" effect (Someone with the relevant technological nous feel free to correct me!) Whereas on an HST for example, with electric transmission, you can coast with the power off for considerable distances without any significant reduction in speed.

Hi! Newbie here (Oldie on the railway). When we leave Honiton in the 'Up' direction most drivers get up to 55mph and shut off at the summit - just inside honiton tunnel. The line speed is 85mph from there and it soon picks up speed. At Snobs corner there is a short '80' for which we need to add a bit of step one on the brake.

We don't need to touch the throttle all the way to Axminster. The speed drops off a bit through seaton Junction but picks up again to about 80 before Axminster.

Nowhere (on a SWT 159 anyway) do we have to apply power downhill. There is a strange quirk though which somebody may be able to explain? When I accelerate up to 15mph or any low speed and shut off (the throttle) - the speedo climbs to 16mph. It's as if something is eased inside the transmission.

I know what you mean by a braking/lagging effect though - the drag of the hydraulic transmission means they don't freewheel like an electric - they'll bugger off quickly down the merest incline as that Pig did at Bomo depot years ago, escaping on to a road :lol:
--- old post above --- --- new post below ---
I think it looks surprisingly 159 like. Is this the future? Our engines will not be Euro5 2012 compliant so I don't know what is going to happen. I don't like the idea of not being able to look out of the side though like the Disastros.

172-31.jpg
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,069
Location
Redcar
Our engines will not be Euro5 2012 compliant so I don't know what is going to happen.

I would expect that grandfather rights will apply so even though current engines don't meet the emissions standards it doesn't matter because they met the standards of the day when they were built.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,290
Euro emmisions standards are for engines being built, not older engines, although I suspect there was/will be big ones where a certain standard must be met by all engines. (Similar to that like DDA 2020)
 

ChrisCooper

Established Member
Joined
7 Sep 2005
Messages
1,787
Location
Loughborough
As yet the only place where emissions standards are applied universally, not just for new build, is for Diesel powered road vehicles in the London Low Emission Zone, currently at Euro 3 and moving to Euro 4 from January 2012. None road engines are exempt though.
 
Status
Not open for further replies.

Top