Im very glad to see that an LM 172 is finally out and about for testing. Im looking forward to London Midland getting them into service on the Snow Hill lines, and at long last long-suffering Northern can have their share of the spoils from the 150 cascade.
Its very pleasing to see, for the first time in their twelve year production run, despite the fact that theyve been a set feature on most of the Electrostars for years, a Turbostar with corridor connections!

Perhaps there is hope for common sense in the rail industry after all!
Would it be reasonable to presume that at least some LM 172 diagrams will be in place from the May timetable change, or would that be asking too much from the spawn of Bombardier?