Either way, it sounds pretty disorganised for what this layman thought was a highly organised industry. It's interesting to learn that there are shortages of controllers and traincrew supervisors as well as drivers.
The TOC is currently all over the place, it’s an incompetent nightmare of a company that would likely have been given all sorts of OLR warnings had it not been taken in-Senedd. I’m not denying that their staff work incredibly hard, and I have so much respect for really lovely members like
@sd0733 (a forum favourite of mine) and the others, but something has to be going wrong with the way TfW and its services are being managed. It’s possibly a senior issue caused by the upper powers that be.
If anything, at the very least I wish they’d be honest. The fact they can’t even cancel a train they aren’t able to run, and instead P-CODE and pretend it never existed is what seems so underhand to me. I know TPE and LNER are as bad, mind.
For lovers of 197s, and this
is the right thread for this news, we have single two-carriage 197001 standing in for a 67+MK4 set on the daily (should be thrice-daily but that’s another failure for another time) Holyhead Cardiff service today.
197001 will then continue the diagram and thus be the first 197 to work a Cardiff Manchester service in lieu of the booked MK4, on the 1052 to Piccadilly. Ironically, I’m not sure if the booked 197s to Cardiff (1550) will now materialise as 197s, as they form from a P-CODED Holyhead service which will terminate short at Chester today, but the MK4 unavailability does mean that one will definitely go to Manchester anyway.
EDIT: Swapsies! 197001 will now do 1855 CDF - MAN, and 197021 is now covering the 67 on 1555 CDF - MAN.