"Arriva Trains Wales proposed restoring the line and others as part of their bid for the all-Wales franchise awarded to them in 2003".
That's interesting. Why did they have to turn the franchise to no-growth? Were any other lines planned for reopenning?
If you wanted to really make the national network connection useful, you'd extend on the formation (yes, I know you'd have to move the cycle path) back to Pwllheli via the Carnarvonshire Railway, with a Pwllheli facing junction.
Is there not enough room to have a narrower path running alongside a single track railway? I do think that it could be better to leave the original formation at Bryncir to cut the corner off and head straight for Porthmadog rather than going via Afon Wen though.
Oh yes the original Wales and Borders bids were in a different league, I was working for Rail Passengers Council Wales at the time and went to presentations. Then the SRA in their infinite wisdom cooked up no growth. Needless to say stuff like Cambrian hourly were all in there.
What would our rail network be like now if the orriginal Wales & Borders bids had gone ahead then? How many reopennings?
Of course talking of bus services thoughts of Carmarthen- Aberystwyth reopening is starting to rear its head again. I believe there is a public meeting due to be held in Lampeter. But is either reopning ever likely to be a reality without a massive shift in government policy and attitudes? Could the WAG's future ability to raise money change this??
Public meeting has already happened I think. There's an hourly bus service between Carmarthen and Aberystwyth, plus early morning coaches 701 and 20 from Aberystwyth to Cardiff, yet talk of a rail link refuses to go away.
Carmarthen to Aberystwyth seems more sensible (and likely!) than Bangor - Carnarvon, I would've thought.
I disagree. Carmarthen - Aberystwyth would have it's merits, but would be a rather stand alone scheme and the intermediate places aren't that big. Bangor - Caernarfon though, connects a large town to the network for much less track. Extending it through to Porthmadog though would really be transformational, assuming the Cambrian coast line has enough loops (or you build some more) you could run through trains from Newtown to Bangor (maybe eventually even Brecon to Bangor). That would boost frequency at the major stations between Machynlleth and Porthmadog (I wouldn't have the new service serve all the little request stops) to hourly as a bonus.
What would the timetable look like?
[Reopening/rebuilding proposals are fine, but without a timetable it's hard top assess the purpose]
Personally, I'd propose an hourly service from Caernarfon to either Amlwch or Llandudno. In addition to this would be a train every two hours from Newtown/Brecon to Bangor. Perhaps you could split a portion off Crewe/Manchester-Holyhead trains too (these would replace the current Cardiff/Birmingham-Wrexham-Holyhead trains). In short, 1.5tph or 2.5tph.
I would imagine that there are quite alot of car journeys (tourism) to Llanberis. If you could build a branch to Llanberis, you could extend either the trains from Llandudno/Amlwch or the ones from Crewe/Manchester from Caernarfon out to Llanberis.