8H
Member
- Joined
- 6 Jul 2013
- Messages
- 259
Proposals for reinstating routes are always interesting
http://www.dailypost.co.uk/news/north-wales-news/caernarfon-bangor-rail-link-talk-6214421
http://www.dailypost.co.uk/news/north-wales-news/caernarfon-bangor-rail-link-talk-6214421
What do you lot think of this one ??The reopening of a 7-mile stretch of disused railway line linking Caernarfon to the rest of the network is back on the cards.
Railway enthusiasts believe it “makes no sense” for seven-mile gap in a 90-mile circular route around and through Snowdonia and want the line from Caernarfon to Bangor re-opened.
Draft plans have been drawn up and discussed by volunteers at the Ffestiniog and Welsh Highland Railway (F&WHR) who are keen to start on another project.
The railway closed in 1970 and track and some bridges removed but the trackbed still exists.
To allow its reopening a bridge would have to be rebuilt at Felinheli, a filled in embankment at Balaclava Square, Caernarfon dug out and a tunnel at Faenol cleared. The section from Felinheli to Caernarfon has been converted into a cycleway.
Volunteers managed to reopen the 26-mile long Welsh Highland Railway from Dinas to Porthmadog in stages at a cost of about £28m.
F&WHR spokesman Andrew Thomas said: “My favoured plan would be standard gauge from Menai Bridge (where it branches off the main North Wales line) to Caernarfon where the car park near Morrisons could be a station.
Last edited by a moderator: