This video, shot yesterday, shows how things look in Gala as it gets ever closer to seeing its first train in forty five years. The new Netherdale footbridge looks inviting.
http://youtu.be/fLVFMOef8zc
http://youtu.be/fLVFMOef8zc
This video, shot yesterday, shows how things look in Gala as it gets ever closer to seeing its first train in forty five years. The new Netherdale footbridge looks inviting.
http://youtu.be/fLVFMOef8zc
I know, just being pointing out that (to date) the priority spend in England has been new lines to alleviate capacity rather than re-opening rural branch lines.
A number of lines in England have been reopened within the last ten years or so-
Eastleigh-Romsey
A number of lines in England have been reopened within the last ten years or so-
Kettering-Corby-Manton Jn
Walsall- Rugeley
Nottingham-Mansfield-Worksop
Eastleigh-Romsey
A number of lines in England have been reopened within the last ten years or so-
Kettering-Corby-Manton Jn
Walsall- Rugeley
Nottingham-Mansfield-Worksop
East London Line Dalston Jn-Whitechapel plus Surrey Quays-Queens Road
Eastleigh-Romsey
also under construction is
Milton Keynes- Oxford/Aylesbury with new spur at Bicester
Watford High Street- Croxley (Croxley link line)
Bristol -Portishead (waiting final approval)

T'was indeed (Walsall-Rugeley/Stafford) opened again well before 2005. I had a 170/5 from Stafford to Birmingham via Rugeley in 2005 (or was it 2006, I can't quite remember), not long before they cut services back to Rugeley IIRC.
England is apparently due another (only partial sadly) re-opening in the next couple of years. Haven't heard much on it lately but we should finally see the return of trains to Rotherwas by 2017. It's only going to be a short branch off the Marches (North and West to the older of us) from Hereford, but it's a re-opening and in my neck of the woods much to my surprise! Shame we can't continue it towards Ross-on-Wye and beyond, but every small step gets us closer!![]()
Unlike the Borders, the track and infrastructure was in place on those lines.
I believe that the intention is to use 158's.What rolling stock is in mind when they are constructing the route e.g. max running speeds. Since the timetable change the Newcraighall shuttle seems to entirely run with 158s, is this an indication of things to come?
What rolling stock is in mind when they are constructing the route e.g. max running speeds. Since the timetable change the Newcraighall shuttle seems to entirely run with 158s, is this an indication of things to come?
On a side note, I saw the 09:12 leaving Newcraighall for Edinburgh earlier today. I was gobsmacked that it was running with 2 x 2 car 158s for approximately five to ten passengers http://www.realtimetrains.co.uk/train/G99767/2015/01/26/advanced. Why is there such much over capacity on the open bit of a route when a single 156 could handle even the peak time services.
More importantly...
How many were on it when it arrived in Edinburgh on the previous diagram?
Perhaps it is better to deal with the splitting of units outside the 8am-9am peak peak...
Meanwhile back in the Borders, the latest episode of the documentary series on the Borders Railway is online now.
Anybody else get fed up with "Head and Shoulders" screenfulls, movies of the person being interviewed? ........And as for TV "Presenters" - don't get me started!!!
Rails have reached Galal]
Today has been a momentous one for Galashiels and the Borders Railway.
For the first time in over 40 years a train came into the Borders town, the first to appear since the Waverley Line closed to passenger trains in the late 1960s and freight trains a few years later.
The track laying team began their day on the outskirts of Galashiels, and by 2pm had reached the centre of Galashiels.
Hundreds of spectators looked on in wonder as they saw the incredible sight of the track laying machine as the team made its way towards Tweedbank, its final destination.
Enjoy the occasion in a special short video here ...
https://www.youtube.com/watch?v=Tl9Z0D7yqr8
More importantly...
How many were on it when it arrived in Edinburgh on the previous diagram?
Perhaps it is better to deal with the splitting of units outside the 8am-9am peak peak...
Intreasting pic in the Gala set showing the new footbribge, do the Scots have a differant set of rules as its new and there is no disabled acess ramps. Was just wondering. Its 3rd 0r 4th pic in series