Southern
Member
Wonder how likely it is that these units will have a 378 style interior.
377/6 I've read somwhere on here. 377 works in a 379 body?
Quoting myself here. I've just remembered Network Rail is upgrading a path across country to international gauge. This presumably means Syston Junction and Stenson Junction, which is within spitting distance of Derby.
Wonder how likely it is that these units will have a 378 style interior.
i admit to taking my finger off the button but whats happened with the S stock? I know deliveries are currently caped.
Quoting myself here. I've just remembered Network Rail is upgrading a path across country to international gauge. This presumably means Syston Junction and Stenson Junction, which is within spitting distance of Derby.
Coupled to... yes
Work with... NO!
They can only attach mechanically!
Around when will we find out what class the new units for Southern are?
Regarding the merge of FCC and Southern, I really do hope it is Govia who takes up the franchise. I despise First.
To the guy who said that 171's and 185's aren't compatible with each other because they do not have the same couplers - they do. 171's and 185's have Dellner couplers. Southern modified the ones with BSI couplers to have Dellner in order to be coupled to the Electrostars.
But Operation Princess ruined VXC financially, they had to give up and get bailed out onto a management contract, so what money would a truly private XC have had to invest in more coaches, or to pay for anything in the first place?
And that's a very good point as well. Siemens' factories in Germany & Austria don't just bid for German and Austrian business (though there's plenty of it); is Derby restricted by Bombardier management to bidding for UK business, or is it that they only consider themselves capable of supplying for the Uk market? And why is that, if they do?The rail industry is a global one, and Derby has been in multi-national ownership for more than 20 years.
Where are the orders for export to fill the gap left by domestic work?
Bombardier makes trains and aircraft parts all over the world (including Belfast).
An integrated business would be seeking to load its factories efficiently dependent on the flow of orders worldwide.
It may need to cut capacity, but that's its decision if the orders are inufficient.
How is it that Derby is still stuck in the last century waiting for limited UK orders?
Is it a failure of the local management or of corporate vision over the ABB/Adranz/Bombardier years?
Didn't they build trams for Strasbourg, and Gautrain for South Africa?
It is not entirely the UK government's fault that Derby is in the position it is.
Just my 5p.
My father called this at privatisation (he worked for the railways 68/9-01) and it would appear he is finally been proved correct, the same thing that happened to the other old BREL works is finally happening at derby.
Especially for the loading guage reasons, the only sustainable solution is the DfT bring rolling stock construction "in house" as it is the one that effectively orders all the stock these days.
But that would be socialist.
Yes its been said about three times already, they are to be named 377/6 and will use 379 bodyshells with 377 equipment. Southern wanted pure 377's but Bombardier said they wouldnt manufacture them anymore so its a kind of compromise.
As stated before, they're 377/6
http://www.railnews.co.uk/news/general/2011/12/28-boost-for-derby-as-bombardier.html
Having the same couplers does not make trains compatable. These days it's about a lot more. The 377 and 377/5 fleets could couple mechinally but couldn't work together electronically until a few weeks ago is the best example of this. In the worse case they could dead haul units but if you let them talk electronically they'd shut the trains down. That just one example of cross class issues, cross builder and between different builders means its a lot more complex then adding the trains together.
. . . . Southern wanted pure 377's but Bombardier said they wouldnt manufacture them anymore so its a kind of compromise.
None of which need mean that rolling stock production would have to be from a monolthic state provider; every US diesel locomotive, whatever the builder and whatever the operator, can work in multiple with anything else; and even on BR, as I remarked before, locos and DMUs from different builders could work in multiple with each other. If the DfT can't ensure that this happens, then this is yet another reason for the DfT to go away and take its hands off everything and let businesses co-operate when it's in their mutual interests to do so.
There. That's an awful lot of multi-quotes, but I think that's covered everything now.
Would be nice to see some London Midland-style class 172s built to replace the 171s, which could be cascaded up to CrossCountry perhaps to boost capacity. They would fit in rather well, seeing as they're suitable for outer-suburban (if you whack some tables in), and externally very similar to the 377s. Closer to the 379s in fact, as the 379s have very different window designs to the rest of the 37x classes.
Go to Siemens and they'll ask you what you'd like to build. Go to Bombardier and they'll only ask "Electrostar or Turbostar"...
Nice idea but its unlikely we'll see more DMU's built for some considerable time - with a rolling programme of electrification on the agenda, and (with some work) potentially plenty of life left in the sprinter fleet, its just not worth the risk to the ROSCO's.
Go to Siemens and they'll say "Which type of Desiro do you want?"
Go to Siemens and they'll ask you what you'd like to build. Go to Bombardier and they'll only ask "Electrostar or Turbostar"...
Would be nice to see some London Midland-style class 172s built to replace the 171s, which could be cascaded up to CrossCountry perhaps to boost capacity. They would fit in rather well, seeing as they're suitable for outer-suburban (if you whack some tables in), and externally very similar to the 377s. Closer to the 379s in fact, as the 379s have very different window designs to the rest of the 37x classes.
Whether you're Siemens or Hitachi or Alsthom or anyone else you are going to quote for a variant of an existing model for which you have the production line set up. To provide an entirely new design you would have quote so high a price you wouldn't stand a chance.
You also seem to forget that the large deliveries of stock to London Underground from Bombardier were neither Electostars or Turbostars...