Having looked at Google Maps, would I be correct to say Fillie will be just over half way at that point?
No, they aren't.
--- old post above --- --- new post below ---
Red Moss, will be a footbridge.
I estimate the A666 crossing as being just past the halfway point.
Having looked at Google Maps, would I be correct to say Fillie will be just over half way at that point?
Then if the new bridge is limited to 44 tonnes, along with others, they should reduce the effectiveness of any increase in the maximum.
What's happening with the Anderton Lane crossing (North of Blackrod Station)?
Plenty of work going on at Farnworth and Moses Gate stations, but I don't think they would have been ready for reopening on October 5 if Fillie had been on time.
There are still no platform buildings.
I too am interested to know if there has been an update in the estimated completion date. What are the odds it will run as a train and not a rail replacement bus?
Thanks for that info. So no prospect of the special loco-hauled Saturday specials that Northern ran last Xmas between Preston & Manchester? Can't see them using the WCML. Also ,while the weather has been great recently to enable much work to be done, (dry and sunny for those not in Britain ..lovely Autumn !) I fear mother nature just might have a few tricks up her sleeve ...the ground cools quickly at night due to no clouds so making frost more likely ! So stay away Jack Frost !! or else ....
Gillets has been closed for some months now, the crossing deck has been lifted.
Whistle boards remain for the foot crossing about 5 yards Adlington side of where the crossing was.
The foot crossing north of Adlington has also been removed, and the whistle boards removed (well on the up, the down remained for a while - I'm not sure if that has been removed).
So the only foot crossings remaining should be the footpath near where Gillets was, and the foot crossing between the M61 and Horwich, at least between Euxton and Bolton.
When the A666 lane closure is switched from the southbound left lane to the two right lanes, we'll know exactly where Fillie is.
I too am interested to know if there has been an update in the estimated completion date. I have a VTWC and connections AP ticket booked and I am booked on to use this train for part of my journey (http://www.realtimetrains.co.uk/train/Y96596/2015/12/20). What are the odds it will run as a train and not a rail replacement bus?
Also I presume the workforce, machinery , locomotives , etc will be already committed to pre-planned work over the Christmas / New Year holiday.
Two new Fillie pictures on the NP Twitter feed:
https://pbs.twimg.com/media/CQUpEnnU8AAB-4q.jpg
https://pbs.twimg.com/media/CQUrYT4WoAAYb6w.jpg
The second one is looking forward from Fillie and you can see the outline of the old tunnel.
It hasn't been, the old contractor was kept on for design and the ones that were to be working on the MML were brought in on an interim basis until a new permanent contractor is assigned.
Bill has confirmed that the temporary footbridge at Rawlinson Lane has been removed, but he missed it going.
Has anyone travelled along the A666 over the tunnel recently? Better still, does anyone do so regularly?
The dates of the start and end of the lane closures will not provide a high-precision guide to Fillie's position, as NR could be intoducing the first closure before Fillie is directly underneath, or ending the last closure after she is directly underneath, as an extra safety precaution.
However the switch from the first lane closure configuration to the second, and from the second to the third, have to be precisely timed, as there is no overlap period when both lanes of one carriageway are closed.