Blackpool - Manchester Electrification

Status
Not open for further replies.

Phlip

Member
Joined
20 Apr 2011
Messages
103
That is something that bugs me. By May TPX will have 8 spare 185s so rather than lengthen Bolton's remaining services to six coaches they are starting up new routes. Why are experimenting with new routes when they cant handle demand for their current services :(

It's not a new route. It's an amendment to existing routes and service patterns to introduce an additional hourly service intended to increase capacity. The changes for the new service won't require 8 additional units (probably a net increase of 4 units - as the Newcastle to Airport service is being cut back to York) and some will be used elsewhere (likely Manchester to Hull and the North West). Users of the North Transpennine routes are as deserving of relief from overcrowding as users of the North West routes.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,661
But First TPE services starting from Manchester Airport will still pass through Manchester Piccadilly. I am aware that the Manchester Airport to Newcastle service will become a Liverpool Lime Street to Newcastle service, but I am unaware of further First TPE services that will give up using Manchester Airport, much as certain forum members wish were that case.

Never mentioned Manchester Airport. 2 services Vic only 2 services Pic only 2 service Vic, Pic and Airport. All i meant is that it is a gradual change in timetable with changes made every two years. 2014 2016 2018.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,386
Location
A typical commuter-belt part of north-west England
Never mentioned Manchester Airport. 2 services Vic only 2 services Pic only 2 service Vic, Pic and Airport. All I meant is that it is a gradual change in timetable with changes made every two years. 2014 2016 2018.

If you look at my posting # 355, you will find that I was responding to a comment made in a posting that stated...."It is also the start of preparing for the almost complete transfer of TPE to Victoria"

Two people can view the same posting, yet come to different answers..:roll:
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,661
It was original done at the Manchester section of PWI. It is being done at short notice as a late replacement at Leeds section.
 

Leylandlad

Member
Joined
1 Dec 2013
Messages
118
It was original done at the Manchester section of PWI. It is being done at short notice as a late replacement at Leeds section.

Shame I missed it originally.

Makes you realise there's a lot more to electrification than just sticking the poles in the ground and slinging up the wires.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,661
Is it open to the public? Or is it members only?

None members welcome.

Have to say it is not entirely about the electrification but the general upgrade of the line but i think it should all be considered as one upgrade anyway.

Be interesting to learn about what else is going on alongside the electrification as i believe quite a bit is planned. Cant claim to know exact details of presentation as it replaced another talk very late but it is being done by a Civil Engineering firm (well one of their engineers!).
 

Thomas6187

Member
Joined
27 May 2011
Messages
443
Location
Rochdale
A continuous Blockage is planned between Chorley and Euxton Junction, from Saturday 19th July-Sunday 31st August. This will allow slab track to be put down and clearance work to be done through the Chorley Tunnel and Flying Arches.

Early plans include a Shuttle between Chorley and Manchester Victoria and TPE to divert via Wigan NW
 

Leylandlad

Member
Joined
1 Dec 2013
Messages
118
A continuous Blockage is planned between Chorley and Euxton Junction, from Saturday 19th July-Sunday 31st August. This will allow slab track to be put down and clearance work to be done through the Chorley Tunnel and Flying Arches.

Early plans include a Shuttle between Chorley and Manchester Victoria and TPE to divert via Wigan NW

A pain for those affected, but total possession is nearly always more efficient than weekend closures and it's the school holidays.

When is the Farnworth tunnel work scheduled?
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
According to RAIL 745 the Up Farnworth tunnel will be closed for 20 weeks from Easter 2015. Its to be wident to take both electrified tracks with speeds upto 100mph. During this time the Down tunnel will be used in both directions with capacity for three trains per hour in each direction, with signalling and track modifications.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
A curiosity ... although Farnworth Tunnel seems to be always known by that name in railway circles, it's shown on OS maps as Clammerclough Tunnel (or Clamourclough on 19th century ones).
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,778
Location
Somewhere, not in London
According to RAIL 745 the Up Farnworth tunnel will be closed for 20 weeks from Easter 2015. Its to be wident to take both electrified tracks with speeds upto 100mph. During this time the Down tunnel will be used in both directions with capacity for three trains per hour in each direction, with signalling and track modifications.

Isn't that was I was saying years ago about what they'd need to do at Farnworth Tunnels?
 

PhilipW

Member
Joined
6 Feb 2008
Messages
761
Location
Fareham, Hants
I wonder if the single bore tunnel at Farnworth will be kept as an unelectrified loop line for freight or deisels. It could come in useful.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,778
Location
Somewhere, not in London
I wonder if the single bore tunnel at Farnworth will be kept as an unelectrified loop line for freight or deisels. It could come in useful.

When we have the loops between Moses Gate and Bolton anyway, and there is currently no scheduled freight, I don't see the value in it personally.
 

Class 170101

On Moderation
Joined
1 Mar 2014
Messages
8,661
If both tracks are to be realigned through one enlarged bore at Farnworth, some platform realignment will presumably be required at the adjacent station.

Picture of tunnel and station from Wikipedia

I wonder if the single bore tunnel at Farnworth will be kept as an unelectrified loop line for freight or deisels. It could come in useful.

I am not sure you would be able to use the down tunnel as a diesel only loop especially if the platform needs to be re-aligned, I would guess it would block the tunnel at this end (see picture link above). I would be interested to see a train just arriving through it to see how tight to the loading gauge it actually is.
 
Last edited:

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,589
Location
Nottingham
I am not sure you would be able to use the down tunnel as a diesel only loop especially if the platform needs to be re-aligned, I would guess it would block the tunnel at this end (see picture link above). I would be interested to see a train just arriving through it to see how tight to the loading gauge it actually is.

I agree. And the closeness of the two bores makes it very difficult to enlarge the larger one without affecting the other. Google tells me they are listed too!
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
The bottom picture on this page (two-thirds of the way down the page) shows a train emerging from the narrower bore.
 
Last edited:

Joseph_Locke

Established Member
Joined
14 Apr 2012
Messages
1,878
Location
Within earshot of trains passing the one and half
I am not sure you would be able to use the down tunnel as a diesel only loop especially if the platform needs to be re-aligned, I would guess it would block the tunnel at this end (see picture link above). I would be interested to see a train just arriving through it to see how tight to the loading gauge it actually is.

W9. It's tiny; about 4.5m diameter. And yes, there will be all sorts of things in the way, besides it being very short for a loop (400m, rather that the target for new loops of 775m (about 1.1km long overall).
 

Whistler40145

Established Member
Joined
30 Apr 2010
Messages
6,149
Location
Lancashire
With regards to the Chorley to Euxton Junction blockade, will the Chorley to Manchester Victoria shuttle require any Wrong Line Working between Lostock Junction & Chorley?
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,556
With regards to the Chorley to Euxton Junction blockade, will the Chorley to Manchester Victoria shuttle require any Wrong Line Working between Lostock Junction & Chorley?

They will more than likely reverse trains Down to Up over Friday Street ground frame like they do normally when trains are terminated at Chorley.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
NR press release on bridge closures

Work will start next month to rebuild a number of bridges in Chorley and Bolton as part of a £400m electrification programme to provide a better railway across the north of England.

Bridges at Harpers Lane, Chorley; Railway Road, Adlington; and Lostock Lane, Bolton, will be rebuilt to allow overhead electricity lines to run underneath to power trains from December 2016.

This work will improve rail connections between Manchester and Preston via Bolton, delivering a more reliable, efficient and greener railway.

http://www.networkrailmediacentre.c...n-project-enters-Chorley-and-Bolton-206d.aspx
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,455
Location
Preston Lancs
Noting the title of this thread, we were visiting Poulton-le-Fylde yesterday and noted work being carried out over a large road overbridge in the area. Is this work part of the advance works for the future electrification of the line ?

Yes, but I made a mistake/assumption, I thought that had been completed. I know it is mainly complete at Kirkham and Wesham but thought Poulton-le Fylde was all done. I do know that all work currently is civil engineering enabling works such as the bridges, followed by the resignalling, removal of boxes and then the masts and catenary last - as usual.
 

Sheepy1209

Member
Joined
26 Oct 2011
Messages
204

Train_Juane

Member
Joined
24 May 2014
Messages
6
Are the Edinburgh-Manchester trains planned to revert to via Bolton once the electrification of that line is complete? Currently going via Wigan and sharp turn left at Newton le Willows. About the same time for me from Lancaster but it's very frustrating trundling along at what seems to be about 10mph and we go from the west coast mainline onto the chat moss route. Why so slow and will it be speeded up anytime soon?
 