Whistler40145
Established Member
If FTPE Blackpool North to Manchester Airport was 1tph, it could run as 2x185s.
Sent from my iPad using Tapatalk HD
Sent from my iPad using Tapatalk HD
If FTPE Blackpool North to Manchester Airport was 1tph, it could run as 2x185s.
Sent from my iPad using Tapatalk HD
I would introduce a temporary timetable, FTPE would operate from Blackpool North to Manchester Airport (1tph) via Eccles. So, could the WCML fit in a Blackpool North to Manchester Airport service?
How much would it be to either;
Put a curve in a curve at Westhaughton, so services could run from Bolton via Lostock Jcn and Atherton.
or;
Put in very good reversing facilities at Hindley, for the same again.
Cheapest option of all might be to reverse at Crow Nest. Does the layout since re-signalling allow this?
I thought Blackpool North to Manchester Airport had 2tph except Sundays.
Was it ever 2tph?
It sure does. Reversing was done last Christmas when the engineering works were being carried out at Wallgate and Manchester trains were terminating at Hindley ( With a direct Manchester express from Wigan NW via Golborne)
Going back into deepest corners of my memory banks, did the LNWR ever run a service from Blackpool, down the WCML from Preston to Wigan North Western, then via the stations at Platt Bridge, Hindley Green, Howe Bridge, Tyldesley, Ellenbrook, Worsley, Monton Green, Eccles, then onwards to Manchester ?
Going back into deepest corners of my memory banks, did the LNWR ever run a service from Blackpool, down the WCML from Preston to Wigan North Western, then via the stations at Platt Bridge, Hindley Green, Howe Bridge, Tyldesley, Ellenbrook, Worsley, Monton Green, Eccles, then onwards to Manchester ?
My 1958 LMR timetable shows a semi-fast 1400 from Blackpool Central via Wigan NW and Tyldesley to Manchester Exchange arr 1801.
4 hours and I minute for the journey that you state gives the term "semi-fast" a whole new meaning for a Blackpool to Manchester journey.
Going back into deepest corners of my memory banks, did the LNWR/LMS ever run a service from Blackpool, down the WCML from Preston to Wigan North Western, then via the stations at Platt Bridge, Hindley Green, Howe Bridge, Tyldesley, Ellenbrook, Worsley, Monton Green, Eccles, then onwards to Manchester Exchange ?
4 hours and I minute for the journey that you state gives the term "semi-fast" a whole new meaning for a Blackpool to Manchester journey.
Going back into deepest corners of my memory banks, did the LNWR/LMS ever run a service from Blackpool, down the WCML from Preston to Wigan North Western, then via the stations at Platt Bridge, Hindley Green, Howe Bridge, Tyldesley, Ellenbrook, Worsley, Monton Green, Eccles, then onwards to Manchester Exchange ?
Yet again another example of Dr. Beechings, completely flawed concept of scrapping parallel routes. The costs of replacement of these will be far more than was ever saved by these ill though out closures of the 1960's.
Will be?
I'd love to be proved wrong, but I don't see the rail network reaching anything close to its pre-Beeching size in my lifetime. And I'm 21.
The sad thing is that until 1966 there was a perfectly decent route that avoided Bolton and still gave a reasonable Manchester - Blackpool service. In fact some of the Club Trains used this route as they where non stop from Salford Central to Lytham.
The route uses the Atherton Line as far as Dobbs Brow Junction, then on to the Dicconson Lane Line until it joins the main Bolton to Preston Line at Horwich Fork Junction.
If this line was still open, then the Manchester - Blackpool services could have continued throughout the Farnworth Tunnel work, without the need for Buses in the middle of the journey.
I accept that Bolton services would have been difficult, but a Preston to Bolton all stations Shuttle service would have solved that one.
Yet again another example of Dr. Beechings, completely flawed concept of scrapping parallel routes. The costs of replacement of these will be far more than was ever saved by these ill though out closures of the 1960's.
Yeah, what a fool! Failing to anticipate some engineering work 50 years later!
It is fairly easy to predict that a rail route will require heavy engineering disruption within 50 years. That is called common sense to be fair!
Rail lines that will require significant engineering works at least once within the next 50 years:
- Almost all. of them
It is fairly easy to predict that a rail route will require heavy engineering disruption within 50 years. That is called common sense to be fair!
So all rail lines should be duplicated with parallel lines?
As a taxpayer I disagree.
Going back into deepest corners of my memory banks, did the LNWR/LMS ever run a service from Blackpool, down the WCML from Preston to Wigan North Western, then via the stations at Platt Bridge, Hindley Green, Howe Bridge, Tyldesley, Ellenbrook, Worsley, Monton Green, Eccles, then onwards to Manchester Exchange ?