LNW-GW Joint
Veteran Member
This is an aside, but if the signalling was installed on the ECML would Class 91s be allowed to travel at 140MPH assuming the cab equipment was installed?
Not without upgrading virtually the whole route (track and OHLE).
This is an aside, but if the signalling was installed on the ECML would Class 91s be allowed to travel at 140MPH assuming the cab equipment was installed?
Makes me feel uneasy if government are considering this. I sincerely hope they are not.
Given NXEC didn't run the service they said they were going to, I wouldn't see an issue with taking the paths off them and giving them to someone else.
Someone can't count or hasn't done their homework properly regarding LUL services at Kings Cross St Pancras... :roll:
London Underground operates four different routes through King’s Cross / St. Pancras that reach most parts of central London within 20 minutes.
I count six different routes myself:
Northern Line
Hammersmith and City Line
Circle Line
Victoria Line
Piccadilly Line
Met Line
That goes up to 12 different routes if I'm being pedant and including both North/South & East/West variations of the above routes...
The mark 4s have reservation tickets stuck in the seat tops and they are so readily visible from outside which saves a lot of time looking for an un-reserved seat at KX; by contrast the Pendos have squinty little LCDs above each seat pair!
Competition is good. Particularly if a condition was to provide at least one North of Edinburgh service.
(Also it annoys me when people misunderstand the way privatization was supposed to bring about competition. The competition doesn't occur between franchised operatorsin most cases it can't, unless you have at least two operators on every lineit occurs between the various companies when they bid for franchises, trying to outdo each other and provide the best service plan. Also ditto for rolling stock procurement.)
Tilting trains merely mitigate the issue of track that isn't straight. I can't help looking at the Morpeth area and think how much time would be saved if a bypass line was built between Dudley and Eshott.
12 miles of track that would cut around 12-15 minutes off the Berwick-London journey time straight away and could be used as part the eventual HS2 link to the North.
That rules out Pendolinos then (unless Glasgow counts, even though it's somewhat to the south), at least until the electrification to Stirling is done.
(Also it annoys me when people misunderstand the way privatization was supposed to bring about competition. The competition doesn't occur between franchised operatorsin most cases it can't, unless you have at least two operators on every lineit occurs between the various companies when they bid for franchises, trying to outdo each other and provide the best service plan. Also ditto for rolling stock procurement.)
Pendolinos are good, but lightspeed is a touch optimistic. Unless they are DeLorean Pendolinos.
If we allow for a moment that they are not stupid or naive, could it be that they are seeking to destroy the high value of the franchise so that they can buy it cheaply?I could understand some ameteur operation coming up with a childish idea that "we want to be able to run megafast services on an already busy railway, which other trains will have to make way for (but we don't want the headaches of having to meet franchise commitments or take on TUPE'd staff)", but this is a branch of a large transport company, coming up with something ridiculously optimistic that has no chance of ever happening - why do Alliance bother with such ideas? ...
If we allow for a moment that they are not stupid or naive, could it be that they are seeking to destroy the high value of the franchise so that they can buy it cheaply?
Someone will have the exact timings from Dudley (Tyne & Wear) to Widdrington, along with mileage...
But I'm pretty sure that 12 miles in 6 minutes isn't lightspeed.
Likewise I'm absolutely confident that no current UK stock can negotiate Morpeth at 125mph.
The timing is clever, as there is no incumbent franchise to annoy and abstract revenue from.
The government is bound to listen to open access proposals because it is government policy to encourage them.
The franchise bidders are also bound to be cautious with their flagship revenue earner at risk.
Apart from abstraction, the ORR can pronounce about paths and performance, but it seems Network Rail are on side in principle with the proposal, or it would not have got this far.
It's a real dilemma for the DfT and ORR.
The government is bound to listen to open access proposals because it is government policy to encourage them.
It is? Last I heard it was government policy to hope that OAOs would die a rapid death to protect the value of the franchises!
Conspiracy theory 2:
I think this is DB's advance play for the East Coast franchise, designed to get stakeholders in the North-East and Scotland on board. It will be rejected, and DB know it will. But they will by then have a mass of support to put behind their (potentially more lucrative) bid for the whole of East Coast if they incorporate parts of this into the bid.
Grand Central and First Hull Trains ranked first and second in the Autumn 2012 passenger satisfaction survey, scoring 96 per cent and 95 per cent, respectively, overall. And they also came top in the value for money category
While competition has brought benefits to passengers, it hasnt led to higher subsidies for the main operator, as some might have feared. The premium paid by East Coast to the DfT has risen from £46 million in 2009-10 to £188 million in 2011-12."[/I][/B]
What happens to the other GNER and GNWR proposals?
Worth bearing in mind that DOR have been much less ambitious than NXEC were going to be, which may explain why they are able to focus more money on paying premiums (e.g. no risky services to Lincoln off-peak)
ainsworth74 said:I'd rather seem some timetable juggling and use the paths to make the current London - York stopping service hourly throughout the day than give them to some OAO.