A 5 car electric set when operating with a 5 car diesel ser away from the wires, will not provide any power to move the train, the 800/2 is effective dead hauling the electric set.You can't both be right!
As I said, the 801/1 electric set provides very limited hotel power, ie lighting, toilets etc, in no way what so ever does it provide any traction to move the train.