Very unlikely as the previous record set by a 91+Mark 4 set used a lot of 140mph running, which wouldn’t be authorised on the ECML today regardless of train type.Considering the new Lumo service has electric-only rolling stock I would imagine it is lighter than the Azumas, and thus has faster acceleration?
If that is the case, with the right pathing, could it set a new ECML speed record?
Are you proposing to take the passengers out too? They weigh more than the engine on an 801.
If it’s an EMU it doesn’t have an engine.But with a lighter EMU surely the acceleration should be greater with an equal power applied by the engine?
But with a lighter EMU surely the acceleration should be greater with an equal power applied by the engine?
Cheers mate for thatThe software regulates the acceleration - it isn’t unconstrained. It is electronically conformed to a acceleration rate/speed curve. Setting the required acceleration rate is important here, not letting the unit “do its own thing” according to the power/weight ratio.
elaborating a bit more from what CY said - The tractive effort available from the motors is greater than that need to meet the specified acceleration curve which the software uses hence the acceleration (on electric) will be identical irrespective of passenger loadings, hurricane force headwinds or having isolated a traction motor.But with a lighter EMU surely the acceleration should be greater with an equal power applied by the engine?
Marketing. An extra incentive for people to ditch the plane and use the train.Just trying to work out what benefits, if any, there are of all-electric rolling stock on the ECML.
Just trying to work out what benefits, if any, there are of all-electric rolling stock on the ECML.
Think fastest am azuma has done is 137.5mph, which it did as part of uts acceptance trials, and also recently when 801228 did testing for the stress being placed on dampers due to the cracks.Very unlikely as the previous record set by a 91+Mark 4 set used a lot of 140mph running, which wouldn’t be authorised on the ECML today regardless of train type.
Class 801s have engines for use when shunting if there's no wires and for self-rescue if the power fails. They have less engines than class 800 or 802 however, so they can't carry out normal operation using them.If it’s an EMU it doesn’t have an engine.
They have less engines than class 800 or 802 however, so they can't carry out normal operation using them.
Do you mean testing to determine the stresses that were causing the cracks not due to the cracks. Cracks don’t cause stresses, they are usually the result of stresses.Think fastest am azuma has done is 137.5mph, which it did as part of uts acceptance trials, and also recently when 801228 did testing for the stress being placed on dampers due to the cracks.
I think people know what I'm on about.Do you mean testing to determine the stresses that were causing the cracks not due to the cracks. Cracks don’t cause stresses, they are usually the result of stresses.
Dragged by an 800/2 and not providing any power. The engine on the 801/1 purely providing lighting, and toilet facilities, and power for doors etc.They can and have done, albeit for engineering works.
A TPE 802 made it up to 148mph a while ago, with passengers onboard, in an overspeed incident. Think that's the fastest any of the 80x family of units have been recorded at.Think fastest am azuma has done is 137.5mph, which it did as part of uts acceptance trials, and also recently when 801228 did testing for the stress being placed on dampers due to the cracks.
Class 801s have engines for use when shunting if there's no wires and for self-rescue if the power fails. They have less engines than class 800 or 802 however, so they can't carry out normal operation using them.
5 car 801s are permitted to operate on diesel in normal operation when working in multiple with a 5 car 800 - this procedure is routinely used during diversions, and has also been used on Harrogate services. 9 car 801s can only operate on diesel for depot shunting and to self rescue, though it was also used to move the units to the ECML from Newton Aycliffe, the single engine not being too much of an issue on the 45mph max Bishop Auckland branch.They can and have done, albeit for engineering works.
It is also often used for service recovery ln Ecml If foe what ever reason oHl has issues.A TPE 802 made it up to 148mph a while ago, with passengers onboard, in an overspeed incident. Think that's the fastest any of the 80x family of units have been recorded at.
5 car 801s are permitted to operate on diesel in normal operation when working in multiple with a 5 car 800 - this procedure is routinely used during diversions, and has also been used on Harrogate services. 9 car 801s can only operate on diesel for depot shunting and to self rescue, though it was also used to move the units to the ECML from Newton Aycliffe, the single engine not being too much of an issue on the 45mph max Bishop Auckland branch.
Dragged by an 800/2 and not providing any power. The engine on the 801/1 purely providing lighting, and toilet facilities, and power for doors etc.
You can't both be right!5 car 801s are permitted to operate on diesel in normal operation when working in multiple with a 5 car 800 - this procedure is routinely used during diversions, and has also been used on Harrogate services.
The precise speed is inconclusive but at least 145 and very likely 1 or 2mph higher. The unit exceeded 125mph for 165 seconds anyway, that much can be said.A TPE 802 made it up to 148mph a while ago, with passengers onboard, in an overspeed incident. Think that's the fastes
5 car 801s are permitted to operate on diesel in normal operation when working in multiple with a 5 car 800 - this procedure is routinely used during diversions, and has also been used on Harrogate services. 9 car 801s can only operate on diesel for depot shunting and to self rescue, though it was also used to move the units to the ECML from Newton Aycliffe, the single engine not being too much of an issue on the 45mph max Bishop Auckland branch.
They did, as I posted above, they do operate in times of disruption, but each incident is taken on a Case by case basis.Happy to be corrected but I'm pretty sure the 9 car 801s operated on diesel when there was overhead wire damage at Finsbury Park earlier in the year.
They can, but the single engine will only get a 9-car set to about 60mph on level tangent track after a fair distance. A 5-car 801 can just about make 80mph from the logs I've seen, again after a fair run up.Happy to be corrected but I'm pretty sure the 9 car 801s operated on diesel when there was overhead wire damage at Finsbury Park earlier in the year.
I know I frequently criticise the 80x units but I'll give them credit where it's due, it's much rarer for the ECML to be brought to a standstill when the slightest thing goes wrong now than it was when HSTs and Mark 4 sets worked everything.It is also often used for service recovery ln Ecml If foe what ever reason oHl has issues.
Most recent been a 9 mile stretch on the down line, north of Newark.
Each case is assessed, level if track, incline, distance etc and that them has to be authorised by senior managers.
We are both right, just @800001 explained it with a lot more detail than I did, whereas I didn't clarify that the diesel engine on the 801 on such moves was only providing electric train supply, rather than traction power.You can't both be right!