Why 45mph for passenger services?
1) Top speed of tender locos in reverse
2) Top Speed of small locos like the GWR (Great Western Railway) 57XX Panniers
3) Allow them to be quicker than buses which is already the case with some railways like the East Lancs Railway.
4) Allowing for more frequent service
5) Allowing for the locos to be able to stretch there legs
6) A number of railways* are already allowed to do above 25mph in testing rolling stock so the track can take the increased speeds.
7) Some railways** apparently already let DMUs do 40mph in service.
8) North Yorkshire Moor Railway is allowed to 45mph in passenger service on the Esk Valley Line between Battersby and Whitby.

* West Somerset Railway = 60mph, Great Central Railway = 75mph Diesel, 60 = mph Steam, Severn Valley Railway = 35mph,

** West Somerset Railway,


Mitigations for 45mph passenger service
1) Enhanced ORR (Office of Rail & Road) assessment
2) AWS (Automatic Warning System) for all signals which would have it on the mainline*
3) Rolling stock must be in a fit state to do 45mph
4) Ban on unbraked passenger stock in service** when running above 25mph

* Watercress Line already does this so it isn't impractical to do it
** Isle of Wight Steam Railway has a couple of unbraked passenger carriages

TypeExample locoTotal Driving Wheel Diameter (In)Piston Stroke (In)Number of CylindersMax Speed (mph)
Ex-Great Western Railway
Saint 4-6-0299980.530270
Hall 4-6-049657230265
Castle 4-6-0504380.626475
King 4-6-060247828475
57xx 0-6-0PT96005424245
94xx 0-6-0 PT94665624245
Ex-Southern Railway
N15 Arthur 4-6-0307777928270
Lord Nelson 4-6-08507928475
WC/BB 4-6-2340677424375
MN 4-6-2350287424375
Ex-London Midland Scottish Railway
5MT 4-6-0454077228265
5XP 4-6-056908126375
6P 4-6-0461158126375
Princess Royal 4-6-262017828475
Duchess 4-6-262338128480
8F 2-8-0481515728250
Ex- London North Eastern Railway
A4 4-6-2600078026380
A3 4-6-244728026375
A1 4-6-2601638026380
A2 4-6-2605327426375
P2 2-8-220077426375
V2 2-6-247717426375
B1 4-6-0612647426270
K1 2-6-020056226255
K4 2-6-034426226360
British Rail Standard
7P 4-6-2700137428275
8P 4-6-2710007428375
4MT 2-6-0760796326260
Table Data
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Cowley

Forum Staff
Staff Member
Global Moderator
Joined
15 Apr 2016
Messages
18,882
Location
Devon
Reasons not to run at 45 mph

Just off the top of my head.

1) Extra wear and tear
2) Extra use of coal (which is already expensive)
3) Having to remove various foot crossings
4) Huge amounts of pointless extra expenditure in an already struggling sector
5) What’s the point of it?

Surely the idea is to have a leisurely trip in an old style steam (or even diesel) train, looking at the view from the window and relaxing?

Not barely having time to sit down before having to get off again while everyone tears around trying to keep the timetable moving.

I fear that your ideas are very much coming from an enthusiasts point of view with very little thought of what makes a family day out and it’s the latter that pay most of the bills…
 

CMS1

Member
Joined
15 Feb 2025
Messages
245
Location
uk
All you would achieve is visitors thinking 'that didnt last long'. Longer the trip, higher the perceived value
 

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,900
The North Yorks Moors surrendered their rights to run to Battersby and now only do 25 mph to Whitby.

The West Somerset DMU is only allowed to do 25 mph in passenger service.

The authorities would want Central door locking at higher speeds to reduce the risk of people falling out, expensive and technically difficult though possible.

You make the journey shorter which on many lines is less appealing as they're not very long as it is.

You increase wear and tear on trains and infrastructure.

It has been looked at a few times and concluded to be a bad idea.
 

frankmoh

On Moderation
Joined
7 May 2025
Messages
820
Location
London
I thought the point of heritage railways was to be a nice slow ride through the countryside. Obviously its a bit sad for some trains that can actually go fast, like the HSTs at the Colne Valley Railway, but that's ok

Also a lot safer for the people who like to window hang, even though its not supposed to be allowed anymore. (going back to the HSTs I seem to recall a picture of video of someone window hanging at 125mph, bloody hell!)
 

BerkshireRails

On Moderation
Joined
4 Apr 2021
Messages
889
Location
United Kingdom
Reasons not to run at 45 mph

Just off the top of my head.

1) Extra wear and tear
2) Extra use of coal (which is already expensive)
I have a feeling it is £600 a ton.
3) Having to remove various foot crossings
I didn't consider they had to be removed I thought it might be possible to just upgrade them.
4) Huge amounts of pointless extra expenditure in an already struggling sector
5) What’s the point of it?
It would give a Unique selling point (USP) which could attract additional visitors however it is a fair comment that this maybe insufficient to offset the increased operating cost.
Surely the idea is to have a leisurely trip in an old style steam (or even diesel) train, looking at the view from the window and relaxing?

Not barely having time to sit down before having to get off again while everyone tears around trying to keep the timetable moving.

I fear that your ideas are very much coming from an enthusiasts point of view with very little thought of what makes a family day out and it’s the latter that pay most of the bills…
Yeah, it does come from an enthusiasts and volunteer point of view. It would mainly be a way of making galas better and making heritage railway more competitive with buses. The East Lancs Railway is one of the few heritage railways which is an attractive local public transport option instead of the slower buses.
The North Yorks Moors surrendered their rights to run to Battersby and now only do 25 mph to Whitby.
Do you roughly know when they surrendered there rights?
The West Somerset DMU is only allowed to do 25 mph in passenger service.
Does that also apply to the Great Western Railway units on the Taunton to Bishop Lydeard service?
 

cav1975

Member
Joined
24 Sep 2010
Messages
454
Mitigations for 45mph passenger service

4) Ban on unbraked passenger stock in service** when running above 25mph


** Isle of Wight Steam Railway has a couple of unbraked passenger carriages

Type
Table Data
All the passenger carrying vehicles and some of the engineering fleet on the Isle of Wight Steam Railway are air braked in full compliance with the regulations.
 

Cowley

Forum Staff
Staff Member
Global Moderator
Joined
15 Apr 2016
Messages
18,882
Location
Devon
All the passenger carrying vehicles and some of the engineering fleet on the Isle of Wight Steam Railway are air braked in full compliance with the regulations.

That’s very true. But then who would be willing to sign off on Victorian wooden bodied stock rattling along at 45 mph?
 

BerkshireRails

On Moderation
Joined
4 Apr 2021
Messages
889
Location
United Kingdom
All the passenger carrying vehicles and some of the engineering fleet on the Isle of Wight Steam Railway are air braked in full compliance with the regulations.
I remember them saying in the Channel 4 TV programme the 'Great Rail Restorations' that the Oldbury coach had to have an exemption because it had no brakes for when they ran it on Llangollen Railway or did they not tell the whole truth as Llangollen Railway is Vacuum and Isle of Wight is Air?
That’s very true. But then who would be willing to sign off on Victorian wooden bodied stock rattling along at 45 mph?
That sounds like something West Coast Railways would do.
 
Last edited:

cav1975

Member
Joined
24 Sep 2010
Messages
454
I remember them saying in the Channel 4 TV programme the 'Great Rail Restorations' that the Oldbury coach had to have an exemption because it had no brakes for when they ran it on Llangollen Railway or did they not tell the whole truth as Llangollen Railway is Vacuum and Isle of Wight is Air?
The Oldbury coach was vacuum piped for the filming. On its return to the Island a full air brake system, including a passenger communication valve, was fitted.

That’s very true. But then who would be willing to sign off on Victorian wooden bodied stock rattling along at 45 mph?
We're perfectly happy with running our vintage carriages at 25mph max.
 

BerkshireRails

On Moderation
Joined
4 Apr 2021
Messages
889
Location
United Kingdom
45mph running would be cool on the GCR, but it would be a very quick journey...
It would still take at least 40 minutes to do a complete end to end run of the line (post extensions). So you get a decent run time and a decent mileage.

Up 45 mph GCR.
2LXX2LXX
Ruddington CentralXX:07XX:37
Rushcliff HaltXX:16XX:46
Loughborough CentralXX:28XX:58
Quorn & WoodhouseXX:33XX:03
RothleyXX:40XX:10
Leicester NorthXX:47XX:17

Down 45mph GCR
2NXX2NXX
Leicester NorthXX:07XX:37
RothleyXX:13XX:43
Quorn & WoodhouseXX:20XX:53
Loughborough CentralXX:35Xx:05
Rushcliff HaltXX:38XX:08
Radcliffe CentralXX:47XX:17
 
Last edited:

A S Leib

Established Member
Joined
9 Sep 2018
Messages
3,275
The East Lancs Railway is one of the few heritage railways which is an attractive local public transport option instead of the slower buses.
Although £20 for a day ticket against £6 return by bus, and gaps of an hour and a half or longer between trains on the days the railway's running cuts down on its utility as proper public transport. I'd guess that you're thinking of tourists in east Lancashire more than of people living in Rawtenstall and Ramsbottom?
 

BerkshireRails

On Moderation
Joined
4 Apr 2021
Messages
889
Location
United Kingdom
Although £20 for a day ticket against £6 return by bus, and gaps of an hour and a half or longer between trains on the days the railway's running cuts down on its utility as proper public transport. I'd guess that you're thinking of tourists in east Lancashire more than of people living in Rawtenstall and Ramsbottom?
The bus is only cheaper because of the £3 bus fare.
 

Halifaxlad

Established Member
Joined
5 Apr 2018
Messages
1,791
Location
The White Rose County
The authorities would want Central door locking at higher speeds to reduce the risk of people falling out, expensive and technically difficult though possible

Why there is that organisation that runs specials on the London overground network with a MK1 and a pre BR Inspection saloon with CDL.
Its mounted externally to the bottom of the doors.

The biggest problem with running preserved railways at anything over 25mph is that it would probably need to go through Parliament as they wouldn't be classified as a 'Light railway'
 

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,900
Why there is that organisation that runs specials on the London overground network with a MK1 and a pre BR Inspection saloon with CDL.
Its mounted externally to the bottom of the doors.

The biggest problem with running preserved railways at anything over 25mph is that it would probably need to go through Parliament as they wouldn't be classified as a 'Light railway'
Yes, I bet it cost them a tenner per coach to fit, not. Well worth the thousands of pounds to trot along a bit faster for no reason on a heritage railway.

Bespoke systems running off the coach batteries for the average vacuum braked steam hauled heritage railway coach would need thousands of pounds just to get the batteries up to spec for the most part, they're rarely in good nick as the lighting often isn't used. They also don't like charging at low speeds.
 

BerkshireRails

On Moderation
Joined
4 Apr 2021
Messages
889
Location
United Kingdom
Bespoke systems running off the coach batteries for the average vacuum braked steam hauled heritage railway coach would need thousands of pounds just to get the batteries up to spec for the most part, they're rarely in good nick as the lighting often isn't used. They also don't like charging at low speeds.
Running at 45mph would improve charging, I believe it is around 10mph when the batteries start charging.
 

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,900
Running at 45mph would improve charging, I believe it is around 10mph when the batteries start charging.
It depends on whether the railway in question have shortened the dynamo belts in the case of Mk1s. In any case, there's no off the shelf solution to the problem.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,161
Yes, I bet it cost them a tenner per coach to fit, not. Well worth the thousands of pounds to trot along a bit faster for no reason on a heritage railway.

Bespoke systems running off the coach batteries for the average vacuum braked steam hauled heritage railway coach would need thousands of pounds just to get the batteries up to spec for the most part, they're rarely in good nick as the lighting often isn't used. They also don't like charging at low speeds.
And the additional maintenance (read: volunteer) hours that would be required for said battery and door control systems…
 

michaelh

Member
Joined
23 Jun 2007
Messages
65
Location
Worcestershire
Although £20 for a day ticket against £6 return by bus, and gaps of an hour and a half or longer between trains on the days the railway's running cuts down on its utility as proper public transport. I'd guess that you're thinking of tourists in east Lancashire more than of people living in Rawtenstall and Ramsbottom?
And free on the bus for older persons
 

satisnek

Member
Joined
5 Sep 2014
Messages
1,097
Location
Kidderminster/Mercia Marina
It would still take at least 40 minutes to do a complete end to end run of the line (post extensions). So you get a decent run time and a decent mileage.

Up 45 mph GCR.
2LXX2LXX
Ruddington CentralXX:07XX:37
Rushcliff HaltXX:16XX:46
Loughborough CentralXX:28XX:58
Quorn & WoodhouseXX:33XX:03
RothleyXX:40XX:10
Leicester NorthXX:47XX:17

Down 45mph GCR
2NXX2NXX
Leicester NorthXX:07XX:37
RothleyXX:13XX:43
Quorn & WoodhouseXX:20XX:53
Loughborough CentralXX:35Xx:05
Rushcliff HaltXX:38XX:08
Radcliffe CentralXX:47XX:17
I was thinking of the current GCR, which as you show, would be less than 20 minutes.
 

DJ_K666

Member
Joined
5 May 2009
Messages
918
Location
Way too far north of 75A
I was thinking of the current GCR, which as you show, would be less than 20 minutes.
I was actually quite surprised how close together the stations are on the Great Central. To be fair that was the only one that sprang readily to mind. Certainly the journey would be spectacular at 45mph but the fares would have to be much higher. Also the track eould have to be re-canted.

I did read somewhere on the Bluebell 's website that when the track at Sheffield Park was replaced after the Ouse bridge was renovated, they took the opportunity to redo the cant, as that had previously been canted for 75 mph! I'll have a look and see.
 

BerkshireRails

On Moderation
Joined
4 Apr 2021
Messages
889
Location
United Kingdom
I was actually quite surprised how close together the stations are on the Great Central. To be fair that was the only one that sprang readily to mind. Certainly the journey would be spectacular at 45mph but the fares would have to be much higher. Also the track eould have to be re-canted.

I did read somewhere on the Bluebell 's website that when the track at Sheffield Park was replaced after the Ouse bridge was renovated, they took the opportunity to redo the cant, as that had previously been canted for 75 mph! I'll have a look and see.
That is why I think it would be a gala thing to start off with, then slowly spreading to some running days to reduce train Crewe requirements while keeping an attractive service for visitors and the general public.
I was thinking of the current GCR, which as you show, would be less than 20 minutes.
I went with the extended version for ease. I had modified the timetable from one I had created for a hobby project.

For the completeness here is the original timetable.

Down Direction
2N012M012N031N01
Leicester Space Centre07:0007:1507:3007:45
Leicester North07:0507:2007:3507:50
Rothley (a)07:1207:2707:42
Rothley (d)07:28
Swithland Sidings07:32
Nuckley Hill07:40
Mountsorrel07:43
Rothley (d)07:1307:43
Quorn & Woodhouse07:2007:50
Loughborough Central07:2507:5508:06
East Leake07:3508:05
Rushcliff Halt07:3908:09
Ruddington Central07:4808:1808:24
Nottingham South07:5608:2608:32

Up Direction
2M022N021N022N04
Nottingham South07:0007:1507:30
Ruddington Central07:0707:2207:07
Rushcliff Halt07:1607:46
East Leake07:2007:50
Loughborough Central07:3007:4008:00
Quorn & Woodhouse07:3508:05
Rothley (a)07:4208:12
Mountsorrel07:15
Nuckley Hill07:18
Swithland Sidings07:26
Rothley (a)07:28
Rothley (d)07:2907:4308:13
Leicester North07:3507:4907:5608:19
Leicester Space Centre07:4107:5508:0208:25

(a) = Arrival
(d) = Depature
 

D6130

Established Member
Joined
12 Jan 2021
Messages
8,981
Location
West Yorkshire/Tuscany
did read somewhere on the Bluebell 's website that when the track at Sheffield Park was replaced after the Ouse bridge was renovated, they took the opportunity to redo the cant, as that had previously been canted for 75 mph! I'll have a look and see.
Many years ago I had sight of a 1960 Southern Region, Central Division Sectional Appendix, Table A. IIRC, the maximum permitted line speed on the Bluebell was 55 mph.
 

Bill57p9

Member
Joined
1 Dec 2019
Messages
865
Location
Ayrshire
Do you roughly know when they surrendered there rights?
TLDR: 2023

The Schedule 4 & 5 (CDL and crash worthiness) exemptions are granted for up to 5 years. NYMR's previous exemptions lapsed on 31 March 2023 (same day as other heritage operators including famously WCRC). ORR had clearly signalled that the CDL exemption would not simply be rolled over. Different operators took different approaches: Some committed to a CDL fitment programme, NYMR restricted to between Whitby and Grosmont (so that they would not pass another train) and limited to 25mph and we all know the path WCRC chose.

Does that also apply to the Great Western Railway units on the Taunton to Bishop Lydeard service?
I don't know the individual arrangements, however Schedules 4 and 5 apply to all railways (rather than individual trains) operating over 25mph, therefore I would expect this limit to apply, though alternative mitigations could be presented to allow an exemption, such as "one engine in steam" operation so that the unit cannot interact with other stock
 