The unreliable air conditioning does get constant criticism. The seating isn't liked by all but the same is true of 185 seating as well.
You beat me to it! Heavy and powerful units may be what is required for this route which is notorious for leaf fall and winter adhesion problems, with which the 165/166s are terrible at coping. Serious timekeeping problems occur every year with these relatively lightweight units.
Amused by earlier implication that there are no hills to climb between Liverpool and Norwich...
And the 185s manage flat routes ok, eg between the airport and Barrow/Windermere/Blackpool.
Surprised no one hasn't mentioned that they are fat gits (unless I've missed it), so routes with a substantial amount of differentials wouldn't be ideal.
Don't you mean Bristol?The North Downs Line could do with being electrified with overhead wiring as has been suggested according to Rail Magazine by Surrey County Council, which if it went ahead would mean that you would probably see class 387's rather than the 165/166 units.
Once the GWML electrification is complete and class 387's have replaced the 165/166's on local routes, you will probably then just be seeing class 166's on the North Downs Route as I believe all the class 165 are going to Exeter to replace the class 158/150 units and then those are going further west to replace the pacers.
Personally I think they could be well suited to the following routes on GWR.
Cardiff to Paignton/Plymouth/Penzance:
1tph calling at Newport, Severn Tunnel Jn, Patchway, Filton Abbey Wood, Bristol Temple Meads, Nailsea & Backwell, Yatton, Worle, Weston-Super-Mare, Highbridge & Burnham, Bridgwater, Taunton, Tiverton Parkway, Exeter St Davids, Dawlish, Teignmouth, Newton Abbot
Then
1tp2hr to Torre, Torquay & Paignton
1tp2hr to Totnes, Ivybridge & Plymouth with 7tpd calling at:
Liskeard, Bodmin Parkway, Par, St Austell, Truro, Redruth, Cambourne, St Erth & Penzance
For Penzance connections from the terminating London train, this would have a long dwell in Plymouth to enable connections.
Plymouth to Penzance
1tph Calling at Devonport, St Budeaux Ferry Road, Saltash, St Germans, Menheniot (3tpd), Liskeard, Bodmin Parkway, Lostwithiel, Par, St Austell, Truro, Redruth, Cambourne, Hayle, St Erth & Penzance.
The units available makes this possible. Only problem being a new maintenance base required. Also these units would make easy work of the Devon Banks
You beat me to it! Heavy and powerful units may be what is required for this route which is notorious for leaf fall and winter adhesion problems, with which the 165/166s are terrible at coping. Serious timekeeping problems occur every year with these relatively lightweight units.
Actually quite a decent suggestion for a fleet of 22 units - probably around 18 required to cover that kind of service pattern - and units are well equipped for the banks in terms of hp, as you say, plus I doubt there are any great problems with their weight, route/speed restrictions. Doubt will happen as in the 'too sensible' category!
Surprised no one hasn't mentioned that they are fat gits (unless I've missed it), so routes with a substantial amount of differentials wouldn't be ideal.
The 185s could be used on the Thames Valley branches where there will be no electrification too, 2 coaches for Marlow.
<snip>
Also apparently First are still keen on the idea of the TPE franchise taking over Liverpool to Nottingham using 185s when the EMT franchise comes to an end.
The North Downs Line could do with being electrified with overhead wiring as has been suggested according to Rail Magazine by Surrey County Council, which if it went ahead would mean that you would probably see class 387's rather than the 165/166 units.
Once the GWML electrification is complete and class 387's have replaced the 165/166's on local routes, you will probably then just be seeing class 166's on the North Downs Route as I believe all the class 165 are going to Exeter to replace the class 158/150 units and then those are going further west to replace the pacers.
Would the 185s be able to run at 100 mph on the SWML between Waterloo & Basingstoke to stop the drivers of the 444s moaning about the slow running diesel in front?
(Not like they will be suitable for Exeter services, lacking gangways and having less seats per set, and being massively overpowered & heavier than the 159s)
I could see that by using some 185's to replace some 159's which then are swapped with 158's (2 coaches) it would be possible to run more 10 coach trains into/out from Waterloo during the peaks and some more 9 coach (rather than say 6 coach trains) formed of 185's in the peaks in the opposite direction to the main flow.
In doing so it would mean that overall there were more seats and could increase capacity elsewhere by swapping their two coach 158's with SWT's 159's (WIRC is to all intents and purposes a 3 coach 158).
Actually quite a decent suggestion for a fleet of 22 units - probably around 18 required to cover that kind of service pattern - and units are well equipped for the banks in terms of hp, as you say, plus I doubt there are any great problems with their weight, route/speed restrictions. Doubt will happen as in the 'too sensible' category!
What about Cross Country - they could free up the 170s, though one wonders if there might be some Voyager-worked services where 100mph would be sufficient.
There's no point in replacing the XC 170's with 185's, they wouldn't offer any real improvements and the 170's manage to cope with the Lickey incline. Anyway, XC have more than 22 170's on their books.
I would think that the class 170's with XC, would at some point in time in the future get replaced by class 801's or similar hybrid train rather than being replaced by class 185's.
Why not the East Midland Liverpool to Norwich route. Let`s face it the 158`s are coming in for constant criticism on this route. Seems to make sense but who knows.
There's no point in replacing the XC 170's with 185's, they wouldn't offer any real improvements and the 170's manage to cope with the Lickey incline. Anyway, XC have more than 22 170's on their books.
The obvious choice is the new Wales and Border franchise (as will be by the time the 22 are to free to leave TPE). It all depends on what happens with this new franchise, buta good plan may be to put them on Holyhead-Birmingham via Crewe and Stafford, Manchester/Liverpool-North Wales and free up 175s to cover and strengthen Marches services and free up 158s for Cambrian services.
I'm not sure that is an obvious choice as the franchise would then have three types of DMUs which aren't compatible. I would have thought if ATW take on 185s they'll release 175s.