What I mean is no all day service until new trains are introduced:mad:
I'm pretty sure the main issue is the long signal spacing there? Very easy to end up with everything crawling on the section between Hammersmith and Acton Town. A 12tph frequency there is excellent when compared to the 6tph each that the major stations Richmond and Ealing Broadway get. And in any case subsurface stock is always superior to tube stock.