Just read this article:
http://www.londonreconnections.com/...-the-increasing-cost-of-the-bakerloos-trains/

...Some kind of life-extension work on the 72 Stock has always been planned. Even ignoring the fact that its nominal life-span was 40 years, a London Underground condition study back in June 2013 had concluded that repairs were needed within four years to ensure the fleet continued to meet relevant safety standards regarding performance in a collision or derailment. With the announcement that the Bakerloo would not receive the NTfL until 2025 at the earliest a full programme of renewal effectively became guaranteed and work began to assess just how extensive the work would need to be....

And it looks like the '72 stock will require a lot of money spent on them to last until NTfL both on repairs and DDA compliance. It also seems like they are nearing the top of the 'bathtub' curve (ie costs will increase and reliability) explained in this article: http://www.londonreconnections.com/2010/the-victoria-line-bathtubs-and-breakdowns/

Would it not be more cost effective to replace them now using an existing design like the 2009 stock, and use the NTfL for '73 and '92 stock?


I don't want to turn this into a D stock vs '72 stock argument (as it had been done to death) but IMHO the '72 should have been replaced before the D.
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
No, it's only the Bakerloo Fleet IIRC.
--- old post above --- --- new post below ---
The 09TS design won't fit on the Bakerloo, nor will 1995TS or 1996TS, even 1983TS has a slim chance of fitting.

Only recent one with a chance is 1992TS, and no, just no!
 

TheNewNo2

Member
Joined
31 Mar 2015
Messages
1,008
Location
Canary Wharf
In an ideal world the 1972 (and probably 1973) stocks would have been replaced before the D Stock, however the decision was made to give SSL a single (well, ish) fleet for ease of operation and to reduce unit costs by economies of scale.
 

hassaanhc

Established Member
Joined
5 Jan 2014
Messages
2,225
Location
Southall
Wasn't the entire S Stock order signed at the same time, so at some time in the 2000s? :idea:
I remember the Piccadilly Line upgrade should have been in progress by now but it got delayed, which in turn delayed the Bakerloo Line upgrade. There just doesn't appear to be the urgency to replace the 72ts, unlike the replacement of the West Anglia fleet :(.
 

TheNewNo2

Member
Joined
31 Mar 2015
Messages
1,008
Location
Canary Wharf
Wasn't the entire S Stock order signed at the same time, so at some time in the 2000s? :idea:
I remember the Piccadilly Line upgrade should have been in progress by now but it got delayed, which in turn delayed the Bakerloo Line upgrade. There just doesn't appear to be the urgency to replace the 72ts, unlike the replacement of the West Anglia fleet :(.

Well by this point the 1972 stock won't survive to NTFL without significant work, so one may as well do the significant work and let other lines take NTFL first.
 

tranzitjim

Member
Joined
4 Jun 2013
Messages
211
Location
Australia
We need to urgently look at the new deep tube stock to replace both the 72 and 73 fleets very soon.
--- old post above --- --- new post below ---
While I am here, how advanced are we with the S stock replacing D stock? Are all the D stock out of service yet?
 

Dstock7080

Established Member
Joined
17 Feb 2010
Messages
3,514
Location
West London
While I am here, how advanced are we with the S stock replacing D stock? Are all the D stock out of service yet?
(way off topic!)
there are still 48 S7 trains outstanding to be delivered to London and around 50 D Stock trains available for service. Each day around 25 trains are formed of S7 Stock (on the 'main line') less than two-thirds still to replace.
 
Last edited:

306024

Established Member
Joined
23 Jan 2013
Messages
3,974
Location
East Anglia
Talking about Bakerloo line stock, does anyone know why the seats generally look disgusting? Apologies if this has been asked before but it really is noticeable compared to other tube stock.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
Talking about Bakerloo line stock, does anyone know why the seats generally look disgusting? Apologies if this has been asked before but it really is noticeable compared to other tube stock.

In what way exactly?

They're the only seats left that are constructed in that manner, and have steel woven into the moqette.

Also, it is brown...
 

306024

Established Member
Joined
23 Jan 2013
Messages
3,974
Location
East Anglia
In what way exactly?

They're the only seats left that are constructed in that manner, and have steel woven into the moqette.

Also, it is brown...

In the way that they simply look filthy. Travelled on one today where one seat had recently been replaced and the contrast was remarkable. Sure the construction may make them more expensive to maintain, but the clean seat was blue rather than brown, which kind of explains why the others look awful.
 

hassaanhc

Established Member
Joined
5 Jan 2014
Messages
2,225
Location
Southall
In the way that they simply look filthy. Travelled on one today where one seat had recently been replaced and the contrast was remarkable. Sure the construction may make them more expensive to maintain, but the clean seat was blue rather than brown, which kind of explains why the others look awful.

Have the seats ever been replaced since the early 1990s refurbishment? With the usage that LUL gets, and with the general dirt present in the tunnels, one does wonder why the seats are not replaced every few years. Or even why hard plastic seating, that is much easier to clean and keep it that way, is not used. :idea:
*Puts on tin foil hat* :lol:
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
In the way that they simply look filthy. Travelled on one today where one seat had recently been replaced and the contrast was remarkable. Sure the construction may make them more expensive to maintain, but the clean seat was blue rather than brown, which kind of explains why the others look awful.

The seats do last a good number of years, and they are replaced when required to a set out set of minimum acceptable condition statements, that come down from quite high up.

If you replace a damaged seat, you would use a new one, or another old one off the rack. But if you sent a seat off to be reconditioned that wasn't deemed unacceptable by these conditions, it will just be sent back, so where do you keep all these seats, on the trains of course.
--- old post above --- --- new post below ---
Have the seats ever been replaced since the early 1990s refurbishment? With the usage that LUL gets, and with the general dirt present in the tunnels, one does wonder why the seats are not replaced every few years. Or even why hard plastic seating, that is much easier to clean and keep it that way, is not used. :idea:
*Puts on tin foil hat* :lol:

As above, they're replaced on condition.

Unless you mean replaced fully with a new design, in that case, no... It's the same design.
 

Dstock7080

Established Member
Joined
17 Feb 2010
Messages
3,514
Location
West London
Unless you mean replaced fully with a new design, in that case, no... It's the same design.

Seating and flooring:
During November 2015 we will begin to replace the seat cushion and back fabric with a striking new brown moquette design. Seating will be complete by April 2016 if the supplier delivers at the agreed rate. The floor replacement and floor covering is part of the life extension work and will be complete by 2020, with the first train due in service from December 2015.
Paintwork/Vinyl:
Once we have identified a preferred supplier, we will begin to replace the fleet’s red, white and blue exterior vinyl and internal vinyl from June 2016. We expect to complete this across the entire fleet by the end of December 2016.
 
Last edited:

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
Seating and flooring:
During November 2015 we will begin to replace the seat cushion and back fabric with a striking new brown moquette design. Seating will be complete by April 2016 if the supplier delivers at the agreed rate. The floor replacement and floor covering is part of the life extension work and will be complete by 2020, with the first train due in service from December 2015.
Paintwork/Vinyl:
Once we have identified a preferred supplier, we will begin to replace the fleet’s red, white and blue exterior vinyl and internal vinyl from June 2016. We expect to complete this across the entire fleet by the end of December 2016.

I was talking about the Refurbishment done in the 90s. (Also the actual design of the seat, not the fabric on it.)

The Vinyl and Moquette is just an interior refresh being done on the depot, it's nothing to do with the life extension.

The floor covering is to do with RVAR compliance, and the felt tip fairies appear to be dragging their feet on it, since two or three trains have been through Life Extension already!
 
Last edited:

hassaanhc

Established Member
Joined
5 Jan 2014
Messages
2,225
Location
Southall
Seating and flooring:
During November 2015 we will begin to replace the seat cushion and back fabric with a striking new brown moquette design. Seating will be complete by April 2016 if the supplier delivers at the agreed rate. The floor replacement and floor covering is part of the life extension work and will be complete by 2020, with the first train due in service from December 2015.
Paintwork/Vinyl:
Once we have identified a preferred supplier, we will begin to replace the fleet’s red, white and blue exterior vinyl and internal vinyl from June 2016. We expect to complete this across the entire fleet by the end of December 2016.

Why not just use the standard blue design that started with the 92ts and later used in 95ts and 96ts?

I found car 3438 with new flooring way back on 18 July. I took a few (very crap) photos at the time as I couldn't believe it :lol:. It is in the pseudo-standard pattern that started off with the 09ts and has now found its way into the 95ts.
 

Attachments

  • 2015-07-18 19.54.12.jpg
    2015-07-18 19.54.12.jpg
    126.9 KB · Views: 116
  • 2015-07-18 19.51.21.jpg
    2015-07-18 19.51.21.jpg
    119.6 KB · Views: 116
  • 2015-07-18 19.56.52.jpg
    2015-07-18 19.56.52.jpg
    166.9 KB · Views: 124
Last edited:

Nym

Established Member
Joined
2 Mar 2007
Messages
9,784
Location
Somewhere, not in London
Why not just use the standard blue design that started with the 92ts and later used in 95ts and 96ts?

I found car 3438 with new flooring way back on 18 July. I took a few (very crap) photos at the time as I couldn't believe it :lol:. It is in the pseudo-standard pattern that started off with the 09ts and has now found its way into the 95ts.

Heh, kind of appropriate to have the blue hand rail to go with the 09TS flooring ;)
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,244
Talking about Bakerloo line stock, does anyone know why the seats generally look disgusting? Apologies if this has been asked before but it really is noticeable compared to other tube stock.

It's all the yobs and low life that get on at Marylebone :D

It's ironic that the stock ordered for political reasons and keep Metro-Cammell going should have such a long life!
 

MatthewRead

On Moderation
Joined
21 Nov 2014
Messages
1,643
Location
West london
Seating and flooring:
During November 2015 we will begin to replace the seat cushion and back fabric with a striking new brown moquette design. Seating will be complete by April 2016 if the supplier delivers at the agreed rate. The floor replacement and floor covering is part of the life extension work and will be complete by 2020, with the first train due in service from December 2015.
Paintwork/Vinyl:
Once we have identified a preferred supplier, we will begin to replace the fleet’s red, white and blue exterior vinyl and internal vinyl from June 2016. We expect to complete this across the entire fleet by the end of December 2016.
I haven't seen any trains with new seats or new floors what's going on here?
 

tranzitjim

Member
Joined
4 Jun 2013
Messages
211
Location
Australia
Are these delays of new stock due to a lack of money?

I can imagine that TfL would get replacement stocks for both the 72 and 73 stocks if they had the money to do so.
 

bluegoblin7

Established Member
Joined
10 May 2011
Messages
2,123
Location
JB
If somebody has photos I would like to see them because I spent over an hour at Kenton last month and did not see any!

They are running, and they are noticeable, but only three trains (out of a fleet of 36) have been refurbished so far. It is entirely feasible for all three trains to be in the depot simultaneously (or elsewhere on the line. Elephant-Harrow-Elephant is in excess of an hour.).
 

rebmcr

Established Member
Joined
15 Nov 2011
Messages
4,005
Location
St Neots
Are these delays of new stock due to a lack of money?

I can imagine that TfL would get replacement stocks for both the 72 and 73 stocks if they had the money to do so.

The tendering process got pushed back by Bombardier's massive failure on the SSL resignalling contract. Then once the NTfL design gets ordered, there will be many years of continuous production that will take a lot of time to replace the existing fleets.
 