• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. S

    Oxford Corridor Phase 2 & Platform 5 updates

    Because if NR put in more bridge spans without any road alterations they’ll reduce the road height clearance even further. The existing road has/had a steep slope down either side, it’s not level.
  2. S

    Is high-speed (225mph) rail dead in the UK?

    Yes you can have ETCS and existing signals. as on the Thameslink Core, but in the south ECML area it is intended to include all trains including the small amount of freight. There’s a dedicated thread about it, it suggests almost all passenger stock used in the area is already ETCS ready...
  3. S

    London Underground station escalator directions.

    Many LU escalators have an automatic change to a slower speed if there’s nobody using them. I expect that’s a better idea if you have multiple escalators going the same way; everyone might pile onto the only one that was moving. The original question about running on the left ‘like traffic’...
  4. S

    December 2025 East Coast Timetable

    A recent discussion about Middlesbrough P3 concluded that the sign pointing towards it in the refurbished subway is about the only visible progress so far: https://www.railforums.co.uk/threads/middlesbrough-railway-station-masterplan.161427/page-6#post-6923675
  5. S

    Where is the level crossing on airdrie bathgate link?

    That’s the route I would be looking into. I think they had to build a new road rather than the planned reopening of some crossings, but there’s not much about anything specific online.
  6. S

    Trivia: Bleakest Terminal Stations

    Can we possibly have Ashington?
  7. S

    Northumberland Line reopening: progress updates

    The Northumberland Line version of the announcement is online. It includes a line about tickets will be available from one week ahead, which is presumably why sales and timetable sites are so variable?
  8. S

    Northumberland Line reopening: progress updates

    Ah thanks, that sounds better. I take the point about them using a sort of standard wording.
  9. S

    Northumberland Line reopening: progress updates

    I thought it was 50% that stopped at Manors, as came out in previous discussions? That‘s what RTT looks like.
  10. S

    Could LNER divert via the new Northumberland Line?

    I think back when the Plessey Viaduct collapse occurred some people on here wondered why southbound services hadn’t been diverted via Bedlington, and that’s possibly when it came up that route knowledge was no longer being maintained. I suspect for the normal annual cyclic maintenance they do...
  11. S

    Could LNER divert via the new Northumberland Line?

    Yes. For a long time until comparatively recently LNER and their predecessors ran regular route learning services via Bedlington. The single line from Morpeth Junction to Bedlington is a passenger line, as per the sectional appendix, but as a single line is not going to be high capacity. There...
  12. S

    South West Trains 4 car diagrams

    There was a period where a single 444 ran in service from Southampton to Portsmouth Harbour in the morning peak, but it was only one way. Some sort of positioning move used for passenger service. Also, to add to earlier replies the Lymington shuttle is a single 450, was previously a 158 on...
  13. S

    Northumberland Line reopening: progress updates

    Please see here for an earlier discussion: https://www.railforums.co.uk/threads/northumberland-line-to-be-re-opened-to-passengers.204414/page-32#post-6861149
  14. S

    MML Electrification: progress updates

    Is there any precedent for a Transport Secretary ever producing major rail benefits for their own constituency? I thought there were government rules in place to prevent such focussed decision making. For a start the treasury would never be a walkover.
  15. S

    Northumberland Line reopening: progress updates

    I see on the Northumberland Line website there are overnight level crossing closures at North Seaton, (7th Dec), and Marchey’s House, (14th Dec), for work ‘to complete the upgrade’. Taking it right to the wire? eg for Marchey’s House:
  16. S

    Yet More 'Nannying' - at Guildford

    It’s not exactly a new idea is it? Might be new to that location but I‘m sure I‘ve seen it before, and years ago.
  17. S

    BBC article on green flying

    About 600 gullible MPs?
  18. S

    Overhead lines and third rails in depots

    At relatively new ‘3rd rail’ depots such as at Northam (Southampton), there is no third rail within the buildings. A unit is driven in as far as it can be, (given that the back shoes will still be in contact), and then a dropper cable from an overhead trolley system is plugged into one of the...
  19. S

    Battery 450s replacing 159s on West of England line?

    Who says the 458 are being retained? AIUI from previous threads SWR have said they aren’t a permanent part of the fleet.
  20. S

    Battery 450s replacing 159s on West of England line?

    The 701 fleet consists of 750 vehicles, as planned in 2017 they were to replace a mixed fleet of 455, 456, 458, and 707, which totalled 742 vehicles. The 701s on their own will not add significant numbers of trains or carriages. At the time the additional overall capacity would have been...

Top