  1. B

    TPE Mark 5A coaching stock progress

    I apologise, my post was poorly worded as I was hurrying. Would you agree that CAF will not have the same level of ongoing daily involvement with the Nova 3 fleet that Hitachi will have with the Nova 1 fleet? I didn't mean to imply that the mk.5a coaches are of similar quality to the 180/Juniper...
  2. B

    TPE Mark 5A coaching stock progress

    Not with the mk.5a contract, CAF have no ongoing involvement once they've handed over the sets and been paid for them. Given the problems to date, it's got 180/Juniper written all over it...
  3. B

    TPE Mark 5A coaching stock progress

    TPE and the DfT had a public conversation, obviously a shot across the bows of CAF, about contractual termination rights which was reported by Roger Ford in his "Informed Sources" article in the February issue of 'Modern Railways' page 28 (I think forum rules forbid the posting of copies of...
  4. B

    TPE Mark 5A coaching stock progress

    Yes. And we are already past that point.
  5. B

    TPE Mark 5A coaching stock progress

    Of course they can - if CAF fail to deliver within the contracted timescale. And with the worrying problems being encountered on the Caledonian Sleeper I expect that TPE are being extremely cautious about accepting more sets, and I don't blame them in the slightest.
  6. B

    TPE Mark 5A coaching stock progress

    The physical infrastructure work at York depot is complete and the stop boards have been removed. Whether the associated paperwork to allow full use of the new facilities has been completed is another matter. To summarise the changes, in addition to the fuel roads (1 & 2) being made longer with...
  7. B

    TPE Mark 5A coaching stock progress

    Yes, the introduction dates for the new trains were redacted, however I believe the document states that the mk.3's had to be in "unrestricted passenger service" by 1 April 2017. That's over two years since extra capacity was supposed to be in service.
  8. B

    TPE Mark 5A coaching stock progress

    I have posted this before, but for reference this was the originally envisaged timescale - Nova 3 into service Summer 2018, all in service by Winter 2018/19. Slippage is to be expected, certainly.
  9. B

    TPE Mark 5A coaching stock progress

    I don't think most people expect a day-by-day timetable for the introduction of the new fleets. But specific dates have been mentioned, for example two Nova 3 sets in service from 29 July. The problem that I think many people see, both inside, and out, of TPE, is that the company is very quick...
  10. B

    TPE Mark 5A coaching stock progress

    TPE usually run extra services between York and Scarborough on Summer Saturdays. This year, as the 185 fleet is very stretched and train crews are expected to be undergoing training on new stock, TPE will run these only if resources allow each week, that's why they haven't been published in the...
  11. B

    TPE Mark 5A coaching stock progress

    I remember class 66's being unloaded from the ship onto the quayside at Newport and within a few hours being driven straight into service. It can be done. And the mk.5's are hardly untested - what was Velim for otherwise?
  12. B

    TPE Mark 5A coaching stock progress

    CAF are TPE's chosen manufacturer for their new stock so in that sense they are responsible. Personally speaking, the delays are disappointing, but not the end of the world, the CAF rolling stock isn't the first to encounter a delayed entry to service, and I doubt it will be the last. Better to...
  13. B

    TPE Mark 5A coaching stock progress

    Are they for real? ... that's got to be one of the most cringeworthy things I have seen for a long time... indicative of a company which has seriously lost its way I would suggest. Why not just be straight with people and say something like "we're sorry but it's taking longer than we expected to...
  14. B

    TPE Mark 5A coaching stock progress

    I believe that training for instructors will recommence this week, once they have completed their training they should be able to start delivering the courses for drivers. Obviously, time is the essence now if anything is to happen from 29 July. It may be that only a part diagram will be...
  15. B

    TPE Mark 5A coaching stock progress

    Could I suggest that the worst "pollution" from 68's at any station, but especially those where the loco is under a roof, will be noise....
  16. B

    Trivia: Palindromic locos/units in service

    Not a palindrome but if 66099 ended up on its roof it would still read the same....
  17. B

    TPE Mark 5A coaching stock progress

    I have been told that these runs are replacing the Crewe-Wavertree runs for Manchester drivers to refresh class 68's. It is better this way as most drivers don't sign the Wavertree route and needed a route conductor, whereas this route is signed by all.
  18. B

    TPE Mark 5A coaching stock progress

    I see that the Longsight-Carlisle fault free running trips haven't operated yet this week. Given that after the first two sets the mileage required reduced (1,500 miles has been quoted previously), and that set 04 had done nearly 2,000 miles, I'm guessing that it has completed the mileage needed...
  19. B

    TPE Mark 5A coaching stock progress

    Once again thank you for all your updates, they are very much appreciated. Please don't take any notice of a few trolls who contribute nothing, please keep up the good work!
  20. B

    TPE Mark 5A coaching stock progress

    Could anybody say if these are a 68+mk5 set, please? http://www.realtimetrains.co.uk/train/K97151/2019/05/23/advanced http://www.realtimetrains.co.uk/train/P96116/2019/05/23/advanced