• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. LNW-GW Joint

    DfT Consultation on TL/GN/SN Combined Franchise

    This consultation has been kicked off by the DfT in advance of the October ITT. http://assets.dft.gov.uk/consultations/dft-2012-23/consultation-thameslink.pdf Lots of detail about the progessive merger and proposed services. However, a quick skim did not reveal anything about rolling stock...
  2. LNW-GW Joint

    Network Rail Faces Big Fine on Long Distance Performance

    In a very dry announcement from ORR: http://www.rail-reg.gov.uk/upload/pdf/290512-performance-breach-letter.pdf NR will be fined £1.5m for every 0.1 point below the agreed 92% performance target in 2013/14 for the Long Distance sector. If it does not improve from the current figure (89.1%)...
  3. LNW-GW Joint

    Ealing Broadway-WLL-Wandsworth Road Service Withdrawal

    The celebrated parliamentary service from Ealing Broadway to Wandsworth Road via Kensington Olympia is proposed for withdrawal from Dec 2012. The DfT 32-page consultation is here: http://www.dft.gov.uk/consultations/dft-2012-17 Part of the rationale is the new LO service into Clapham Jn...
  4. LNW-GW Joint

    Loco-Hauled Class 442s?

    Something to cheer the loco-haulage brigade. The ATOC Rolling Stock Requirements for CP5 (http://www.atoc.org/latest-publications) scarcely mentions loco-hauled operation, but it does offer one intriguing option. This is to convert the class 442 EMU fleet to loco-hauled mode (because their...
  5. LNW-GW Joint

    West Coast Bids Are In on Friday 4 May

    It seems an age since the ITT went out in January, but the four bids for the Intercity West Coast franchise were due in at noon today (extended to Friday 4 May I hear). So the DfT now knows what goodies Virgin, First, Keolis and Abellio are offering for the next 15 years. We have to wait till...
  6. LNW-GW Joint

    Northern Route Upgrades

    George Osborne has just announced the "upgrade" of the Hope Valley, Manchester-Preston and Manchester-Bradford routes, linked to the Northern Hub. What does this mean? Electrification? Resignalling? Gauge Clearance?
  7. LNW-GW Joint

    ORR Refuses LM Preston Service

    The ORR has refused the London Midland application to run an hourly Birmingham-Preston service. This would have been achieved by diverting one of the 2tph Birmingham-Liverpool services to Preston, calling at Hartford, Warrington and Wigan. The Euston-Trent Valley-Stoke-Crewe service would be...
  8. LNW-GW Joint

    Crossrail Rolling Stock Procurement

    Crossrail has started the procurement of its trains, with tenders going to the four bidders: Bombardier, Siemens, CAF, Hitachi. Justine Greening has issued a statement about the procurement: http://www.dft.gov.uk/news/statements/greening-20120228/ and Crossrail has issued this statement...
  9. LNW-GW Joint

    West Coast ITT Published

    It's now on the DfT web site: http://www.dft.gov.uk/publications/rail-passenger-franchise-intercity-west-coast/# Having skim-read it, it's all very disappointing and unambitious. No change to the service plan - current baseline with no new routes, beyond deploying the 4 new Pendolinos (ie...
  10. LNW-GW Joint

    Bombardier £188m Order from Southern

    It's an odd day for such news, but the BBC and some newspaper sites are reporting that Bombardier have won the expected 130-car order from Southern. The story seems to be from Justine Greening herself - nothing on the DfT or industry sites. Anybody know any more? The timing suggests this is...
  11. LNW-GW Joint

    New GW/TL/ET Franchise Competitions Start

    The initial announcement of the intention to let these 3 franchises has appeared on the DfT web site. This includes an OJEU notice which is the formal announcement of the public procurement for each one. Bidders are asked to pre-qualify to receive the ITT, as happened last year for WC. They...
  12. LNW-GW Joint

    ECML Service Gone to Pot Sun 27 Nov

    A broken down train caused by vandalism is disrupting services near Peterborough. So what bit of the ECML has gone missing tonight? Delays up to 183min (NRES claims "up to 90 min").
  13. LNW-GW Joint

    Dire VT Punctuality for P8

    VT punctuality performance was down to 77.5% for the last month (p8, 16 Oct-12 Nov). NR gives plenty of reasons/excuses worthy of Reginald Perrin, but in all seriousness this must be very worrying for NR and VT. It's three years since the £8b WCRM was completed and the route is still in deep...
  14. LNW-GW Joint

    Bats and Newts Delay Evergreen 3

    DfT have refused to approve Chiltern's TWA proposal for Evergreen 3 until there are better mitigation measures for endangered wildlife between Bicester and Oxford - bats in Wolvercot tunnel and great crested newts in two locations. However, it looks like the TWA order will be approved if...
  15. LNW-GW Joint

    Railway White Paper Coming Early Next Year

    Justine Greening has made her first pronouncement: http://www.dft.gov.uk/news/statements/greening-20111115 Sounds like significant changes to railway policy are coming, but most of the recent ones have been rather small beer. More devolution to the regions (I assume that means PTEs) seems...
  16. LNW-GW Joint

    Chester Station to City Centre Free Bus Ends on November 21

    Posters at Chester station say that the popular free bus link between the station and city centre is to become a commercial service from November 21, fare £1 each way. The service will have a new operator but run at the current frequency (every 10 mins). Funding for the free bus was from the...
  17. LNW-GW Joint

    HS2 Commons Debate

    I've just been listening to (most of) this afternoon's Commons debate on HS2. A lot of it was local nimby-ism at its worst, but I was surprised by the level of support for the general idea, if not for the specific route. The most vehement opposition came from an unexpected source - the MP...
  18. LNW-GW Joint

    London-Chester on OWW via Worcester

    Another conundrum: You can't do Chester (where I was starting from) or even Birmingham to London via Worcester and the Cotswold line, though I feel sure this was a permitted route in the distant past (a GW/WR route from Wolverhampton or Birmingham via Worcester and Oxford). The Routeing Guide...
  19. LNW-GW Joint

    Stagecoach/Virgin Rail Doing Well

    Stagecoach Group have issued an interim management statement today on recent revenue April-July 2011. http://www.stagecoachgroup.com/scg/media/press/pr2011/2011-08-19/ On the rail front: UK Rail (ie SWT, EMT) revenue up 8.4% on same period last year. VT up 11.1%. Nothing said about...
  20. LNW-GW Joint

    Norwich-Chester via London

    Does anybody know why there are NO FARES via London for this journey, even though it is a good bit quicker than the route via Peterborough-Nuneaton? If you try and book a ticket NRW-CTR you only get offered the cross-country route (fare set by EMT) usually involving 3 changes (Ely, Nuneaton...

Top