LNW-GW Joint
Veteran Member
In a very dry announcement from ORR: http://www.rail-reg.gov.uk/upload/pdf/290512-performance-breach-letter.pdf
NR will be fined £1.5m for every 0.1 point below the agreed 92% performance target in 2013/14 for the Long Distance sector.
If it does not improve from the current figure (89.1%) the fine would be £43m.
The target for last year was 90.9, this year is 91.5 and next is 92.
While NR certainly is doing a lot to improve things you only have to read this forum over a few weeks to see that there are multiple problems almost every day on LNW/LNE/GW main lines.
The last week, a perfectly normal spring one, has been horrendous, even without a major dewirement event.
What does NR have to do to get up to 92% performance on main lines?
NR will be fined £1.5m for every 0.1 point below the agreed 92% performance target in 2013/14 for the Long Distance sector.
If it does not improve from the current figure (89.1%) the fine would be £43m.
The target for last year was 90.9, this year is 91.5 and next is 92.
While NR certainly is doing a lot to improve things you only have to read this forum over a few weeks to see that there are multiple problems almost every day on LNW/LNE/GW main lines.
The last week, a perfectly normal spring one, has been horrendous, even without a major dewirement event.
What does NR have to do to get up to 92% performance on main lines?