• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. C

    Ideas for improving services to the east of Dartford

    mods note - split from this thread I don't think beyond Gravesend, that I can recall. And certainly no need now Crossrail is with us. More should feed that service. 8tph feeding Abbey Wood is decent (2 from Sidcup, 2 TL/Rainham, 2 Dartford, 2 Bexleyheath?) - but ideally there would be more...
  2. C

    Beyond Oxford and Cambridge - other comparable darlings?

    So, thinking about all of the investment into Oxford and Cambridge and the incessant threads on here - yes also the arc and growth at Bicester, MK and Wixams/Bedford/Universal - but predominantly I am thinking here about the holistic picture of smaller, older cities which are punching about...
  3. C

    Oxford improvements could have been done differently

    Moderator note: Split from https://www.railforums.co.uk/threads/oxford-corridor-phase-2-platform-5-updates.235423/ Could a bay be added to the p4/5 island - at either end? Is the width there (or could it be?) A north-facing one could cover the maybe-never Moor St, or Banbury locals, or even...
  4. C

    Beckenham Junction: potential location for an extended Bakerloo Line to terminate?

    What is the most intensive regular service this platform has ever had? The peak direction Blackfriars/TLs? Or weekend diversions? Somewhat speculative, but I hope not too much as it's out there in the world, but one day it is earmarked for having Bakerloo line extended service - any ideas on...
  5. C

    Station masterplans

    Bit of a broader topic, but I was thinking about the recent piecemeal improvements to strategically / economically very important stations such as Oxford and Cambridge, and also Cardiff - a platform added here, an extra exit there, etc - and look at at the navigational craziness and incremental...
  6. C

    Moor Street and Midlands Rail Hub

    I could see a few threads which mention this but none centred on it. Now that this has been approved, it'd be good to understand which of these (lifted from wikipedia, caveats abound) - are going into the final plans, and also - critically - what does this service plan unlock for New St. Could...
  7. C

    Preston / optimization

    Thinking on a future Preston which might have a reinstated Mail platforms set up, and in theory could have P7 reinstated too: Might it be better to cut some through journeys that cross the throat and don't have tons of cross-Preston usage, and add frequency instead. e.g. move to 2tph Preston -...
  8. C

    The possibility of a ‘Manchester Crossrail’?

    mods note - split from here. I would think that these type of service on Styal (local, all stations) would be a better fit for a regular service round Ordsall to Victoria - proper 'Manchester Crossrail' - and then 2tph to Rochdale/Stalybridge, once wired. Overlay with 2tph Hazel Grove, say, to...
  9. C

    How should the Hayes & Harlington bay platform be utilised?

    Seems a good space to tease an incremental extension to, of say, 2tph Paddington terminators, in time - if there is demand and paths could work. Maybe speed up an airport pair.
  10. C

    Could we see enhanced fequencies on the Hertford East branch?

    Moderator note: Split from https://www.railforums.co.uk/threads/hertford-east-branch-platform-extension-updates.229607/ Great news. Will there ever be anything in the way of duplication to enhance frequency? I could see it having 4tph (either route, or 2 slow and 2 fast).
  11. C

    What rolling stock could be used on East West Rail (EWR) when the line is completed?

    If it isn't being wired (stupid), it might be this much-questioned future home for 222s.
  12. C

    What is the purpose of Bradford to Leeds electrification?

    What is the Bradford-Leeds electrification in aid of? The Calder route goes two ways, with no wires until Victoria or Preston... seems random. Unless part of something else un-articulated.
  13. C

    Could we see an increase in services between Basingstoke & Reading?

    Moderator note: Split from https://www.railforums.co.uk/threads/reading-green-park-station.184100/ Any sense of an increase in frequency, in future? We'll have to see how Green Park does, and if it instigates net new journeys, or just replaces Reading/West ones.
  14. C

    Should there be a frequent service linking Crossrail and the Chiltern line?

    Moderator note: Split from https://www.railforums.co.uk/threads/chiltern-services-to-paddington.211441 Interesting as wasn't this exact movement (West Ealing to High Wycombe) planned as a replacement to the Greenford shuttle, connecting the Chiltern route with Crossrail? Shows how doable it is...
  15. C

    Could Carstairs be by-passed?

    I thought a bypass line was being built for the Edinburgh route, which would save a good couple of minutes. Surely this would be appealing in advance of HS2?
  16. C

    What rail improvements would you like to see in the Liverpool region?

    Moderator note: Split from https://www.railforums.co.uk/threads/nr-liverpool-strategic-study.210695 I couldn't see mention of the extra Halton/Wales services. But I've always thought that two trains per hour (tph) would make more sense. One slow train per hour (as today with Frodsham and...
  17. C

    Potential for extra Thameslink paths?

    Moderator note: Split from https://www.railforums.co.uk/threads/why-is-the-stopping-cambridge-kings-cross-service-branded-thameslink-and-not-great-northern.208573/ Where else could the 'Maidstones' go on the southern side if the northern half was activated into the core some time soon? Could...
  18. C

    Suggestions for additional Marches services

    Moderator note: Split from https://www.railforums.co.uk/threads/ebbw-vale-redoubling.144142 Would there ever be a case for regular England>Marches services? Thinking a Bristol - Newport (reverse) - Marches - Liverpool, possibly? Would link Bristol to those towns, and provide Liverpool-Bristol...
  19. C

    Could we see more intensive services now Stevenage P5 has opened, such as higher frequency to Hertford?

    Is there any immediate benefit to this in terms of Thameslink pathing? I would guess not as it has been bustituted, but curious if this permanent move will help the flow and unlock anything more? Also, is there a plan to go beyond 2tph from Stevenage down towards Hertford? Or will that always...
  20. C

    ECML timetable enhancements following completion of Werrington project

    Moderator note: Split from https://www.railforums.co.uk/threads/werrington-grade-separation-approved.167526 Will there be any immediate passenger benefits or changes when this is completed?

Top