Moderator note: Split from
www.railforums.co.uk
Could a bay be added to the p4/5 island - at either end? Is the width there (or could it be?)
A north-facing one could cover the maybe-never Moor St, or Banbury locals, or even the Oxford starters to the Cotswolds lines which used to run.
South could be the Bristol, or if long enough, the Didcot semi if it returns. Keep the throughs, through... ?
Oxford Corridor Phase 2 & Platform 5 updates
Local media in Oxford is reporting it is planned to close Oxford station for 3 months next summer, so the bridge over Botley road can be replaced. Does anyone know any more details on this? I would presume this means the whole line will be closed for that time, but that seems awefully long...
Could a bay be added to the p4/5 island - at either end? Is the width there (or could it be?)
A north-facing one could cover the maybe-never Moor St, or Banbury locals, or even the Oxford starters to the Cotswolds lines which used to run.
South could be the Bristol, or if long enough, the Didcot semi if it returns. Keep the throughs, through... ?
Last edited by a moderator:
