• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. N

    Quadruple Track - Longest

    The mml is 3 track from sharnbrook, not far north of bedford Its gotta be about 60 miles quadruple track euston to roade on wcml south
  2. N

    Network Rail messed up at Euston!

    If I had known you were there I probably would have done the same! But in all seriousness these trains have no priority at all from an operational point of view. Think yourself lucky these trains are even able to run on a near-capacity wcml
  3. N

    New Wolverton Station Building Blueprints

    Impossible. Its pathing is extremely tight between rugby and nuneaton so I am led to believe
  4. N

    Driver overshoots. Not allowed to set back?

    Hmm, thought all LM 350s for rugeley trent valley were 4 car..
  5. N

    New Wolverton Station Building Blueprints

    No but its at the station which is what Tom stated ;)
  6. N

    12 car 350/1 to be tested at 110mph

    50mph max speed within a possession. Why would they need a possession anyway?? Seems ridiculous to me
  7. N

    An excess of rail?

    The chord is regularly used
  8. N

    trauma care for drivers after a fatality?

    They have the btp fatality hotline they can call (believe its 24hrs)
  9. N

    Gsm-r

    I believe whilst on trial in scotland a train cleaner accidently pressed the emergency group call button on a train in a depot, hence the poster that is on display. Virgin have gsmr on their fleet for wcml south
  10. N

    London Midland Drivers @ Crewe

    All I can speak for is the problems later on. This only affected one LM Crewe train (last one of the day) which DID divert via the West Mids. Think your facts may not be 100% correct?
  11. N

    More level crossing madness

    I cannot properly comment as I do not know the exact type of crossing but if it full barriers worked by the signaller the lowering sequence takes place, the signaller checks crossing is clear, then presses crossing clear button which clears signals for the train on approach to the crossing. If...
  12. N

    Alcohol

    Its sonething like 1/4 of the drink drive limit. So yes drinking the night before could well mean still being over the limit the next day
  13. N

    Southall problems

    No its just an excuse, they felt like delaying trains for a laugh..
  14. N

    New Stations/Re-Openings

    Luton is more populated than northampton and has one station, especially considering nearby dunstable is not served by railway
  15. N

    Ordsall Lane Junction Points failure this morning

    I must say ive never been questioned running an on time freight in front of a late passenger if there is the margin. Always try and keep the freights goin if I can! Especially if its a 90 on the front..
  16. N

    RAIB investigation - Ufton level crossing

    This is what I meant! But yes there should have been one on display at the crossing, though not exactly foolproof! (it may not be seen by the driver until virtually at the crossing due to curvature as an example)
  17. N

    RAIB investigation - Ufton level crossing

    The crossing attendant should have been showing a red handsignal at the crossing for the train. For an ahbc crossing the signals on approach can be cleared with the crossing on local control unlike a cctv crossing for example. However they should be maintained at danger to caution any...
  18. N

    Ordsall Lane Junction Points failure this morning

    Not necessarily. I prefer to not be a robot thanks!
  19. N

    Double track - single platform on one side

    Polesworth is a single platform on 4 track wcml
  20. N

    Fastest section in Virgin Trains.

    Think its 110 through bletchley to, plus if there are any esr/tsrs in place

Top