Search results

  1. I

    Blackpool - Manchester Electrification

    This suggests that for safety and to minimise ground vibration from traffic, the tunnelling is only being done at night. If this is the case, the tunnelling rate is probably reduced to one ring per night. Down to 1.4m per 24 hr day while Fillie is under the A666.
  2. I

    3rd rail north London

    Only just! The problems were enormous leading to insufficient serviceable stock to run a service. The transformers, rectifiers and motors gave trouble. The 25kV/6.25kV tap changing transfomers being particularly troublesome. As part of the bigger plan, the changeover needed to happen...
  3. I

    Blackpool - Manchester Electrification

    It seems to have gone very quiet. I would have expected by now that the halfway point has been passed, yet no sign of a NR announcement to that effect. Suggests there may be trouble!
  4. I

    Leeds North Western Electrification Scheme

    It would be useful to have a definition of "IBJ"!
  5. I

    Blackpool - Manchester Electrification

    Unfortunately no indication of distance travelled or when the picture was taken. The second picture looking forward towards the old tunnel, shows bales of straw on the left hand side. We saw straw in the earlier pictures when they were going through bad ground. What is the straw used for...
  6. I

    Blackpool - Manchester Electrification

    By estimating the width of the road and NR's figures for lane closures we can get an idea of the rate of tunnelling that the Fillie team expects. My guess at the road width is 26 metres based on the Highways Agency's design manual for Roads and Bridges for an 'A' road dual carriagway...
  7. I

    Blackpool - Manchester Electrification

    Although we made a guess as to where Fillie was on 21st of September, it looks as though they will have been achieving a tunnelling rate of about 2 metres per day by the A666 crossing. This is way short of the hoped for rate of 6 m per day. For the final half of the bore, 2 m/day puts...
  8. I

    Blackpool - Manchester Electrification

    Full text Here I estimate the A666 crossing as being just past the halfway point.
  9. I

    Blackpool - Manchester Electrification

    Yes thanks, they are all visible and playable.
  10. I

    Chiltern Oxford Link completed

    A couple of pictures Here of the first train on the Chord.
  11. I

    Chiltern Oxford Link completed

    According to an earlier post and quoting the Oxford Mail, they are suggesting 'summer' of 2016.
  12. I

    Ordsall Chord

    This wasn't a judicial review. Sounds as though the judge had to rule on a straighforward case between Party A v Party B.
  13. I

    Chiltern Oxford Link completed

    For the week beginning Sept. 28, Realtime Trains is showing a lot of activity on the line. Look like driver training runs.
  14. I

    Ordsall Chord

    This could be a good thing as the Judge is not being asked to decide the relative merits of the schemes, but whether or not the correct procedures were followed during the Public Inquiry. Not knowing much about cricket and probably railways too, High Court judge Mrs Justice Beverley Lang can...
  15. I

    Blackpool - Manchester Electrification

    Yes, I noticed the straps joining the segments together and thought this was unusual and an indication of problems. However, the CrossRail tunnels also have straps joining segments in places, so evidently not all that unusual. See 360 deg video
  16. I

    Blackpool - Manchester Electrification

    I have just done a similar excercise and reckon 16 lights are visible plus the one just inside the entrance. The lights seem to me to be at every fourth ring, so I estimate 16 x 4 x 1.4 m = 89 metres. If Fillie is 20 metres long the total length tunnelled may be around 109 metres. Leaving 161...
  17. I

    Diss Station Platform Length

    The Sectional Appendix quotes the lengths as being 250m both Up and Down. Stagger or offset is not shown.
  18. I

    Why so long to develop East - West Rail?

    On the website referred to above, there is an interactive map where different structures can be selected. Depending on what is proposed a detailed map can be selected. Having some knowledge of the area I discovered two errors, road over rail bridges and one road under rail (A41) to be out of...
  19. I

    Why so long to develop East - West Rail?

    Yes if you go to Here on the NR/EWR website the reason is given.