• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. P

    GWR Class 800

    Well I use them to go to work every day, I can't imagine having the desire or money to use them as a leisure experience! Give me a nice 70's loco and mk1s and I might travel just for fun. However I use trains for the reason they are intended, to get from A to B. Since the 800s arrived I've been...
  2. P

    GWR Class 800

    As I walked over the foot bridge at Chippenham today looking down on the 800 I'd just got off there was a bright light on the roof of the trailing car, this was some way from the pan but I assume it is something to do with the pan monitoring ( as no wires pan was down) is this correct? If not...
  3. P

    Great Western Electrification Progress

    Thanks for the info, hopefully it's not an infrastructure issue.
  4. P

    Great Western Electrification Progress

    Yes it was. Noticed quite a few later ones had very similar timings.
  5. P

    Great Western Electrification Progress

    No but train on time at Steventon then 13 late at Wantage Road so presumably between the two. It didn't manage to make any time up so I was thinking it may have been on diesel after that. Of course the reason given may have been rubbish.
  6. P

    Great Western Electrification Progress

    Waiting for train to Bristol this morning and delayed due to damage to overhead wires! Delay started just after Steventon.
  7. P

    GWR operating short 'HSTGTi' sets (see diagrams section for workings)

    Yes green sliding door. The seats are covered in the same new fabric as the refitted 800s but with a leather headrest framed in green fabric, very nice. One of the power cars was 43005. Strange diagram though, stopping at filton abbey wood, patchway, stj, Newport and Cardiff. No chance to get up...
  8. P

    Great Western Electrification Progress

    Went past Langley burrel compound today and all Porta cabins now gone and looks like the site is being cleared. Some large steel parts still there and a few cable drums and general rubbish. So sadly no further progress likely for the foreseeable future as we all knew.
  9. P

    GWR operating short 'HSTGTi' sets (see diagrams section for workings)

    On my first 4 car set on 12:21 Bristol to Cardiff, what a lovely job has been done on them. The interior and seats are so much better than the 800 I just got off. Externally they look very smart.
  10. P

    GWR Class 800

    Well I've just spent 2.5 hours on a 5 car 800 for a 10 min trip thanks to a points failure at Bathampton. Highlights were being at Chippenham on 3 separate occasions and the numb backside thanks to the seats! Don't normally notice them but this duration was painful. Have to say the gwr staff on...
  11. P

    Remaining GWR HST Diagrams

    43098 on the back
  12. P

    Remaining GWR HST Diagrams

    Just got on the 17:13 from Bath, 13 late and it's an HST stepping in for the normal 800. Chance for someone to get a last run! Sorry didn't get power cars but front one is standard first livery.
  13. P

    GWR Class 800

    Just noticed that is only on one side!
  14. P

    GWR Class 800

    Just on 802113 and I notice that the top set of jumper cables are not present, is the mitigation for the ladder issue? Pretty sure 800s have jumpers all the way up the inter carriage gap.
  15. P

    Great Western Electrification Progress

    Closer to Chippenham the signalling is definitely 4 aspect.
  16. P

    Britain's noisiest trains

    What about a Western, always loudest to me when at full throttle.
  17. P

    Great Western Electrification Progress

    So did Wootton Bassett to Chippenham go live this morning?
  18. P

    GWR Class 800

    Noticed recently that the exterior of the 800s is getting filthy, I can hardly see out of the window of 035 I'm on at the moment. It's back to the bad old days of BR. GWR seemed able to keep the HSTs pretty clean, do Hitachi not wash them or is the washer not very good? Really spoiling the...
  19. P

    Great Western Electrification Progress

    There are 2 large signs on both up and down lines just west of Chippenham road bridge near kellaways. They are currently covered but I'm assuming they are pan up / down signs as it's about a mile to the end of the wires. Anyone able to confirm if this is what they are?
  20. P

    GWR Class 800

    Was in 802001 today, quite surprised as still not seen 800001 or 800301 in service yet.

Top