Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
Today whilst at Newcraighall station I saw an EWS Class 67 hauling six Mark 2 in ex Virgin livery (see second image). This service http://www.realtimetrains.co.uk/train/G62869/2014/05/02/advanced feeding in to this one http://www.realtimetrains.co.uk/train/G62201/2014/05/02/advanced.
I know...
Manchester Airport to Barrow-in-Furness? It would be justified between Manchester Airport and Lancaster and its unlikely the line to barrow will be electrified any time soon. The current services run with three to six 185 are having overcrowding issues now. So by 2020 it might be getting critical.
Given that Leyland is currently terrible for the physically impaired this is excellent news. Loads of steps and no lifts.
http://www.railbrit.co.uk/imageenlarge/imagecomplete.php?id=20918
I know they had some spare at the end of 2012 / start of 2013 and I had not seen any news that they had moved on so presumed they had put them in storage for now.
Is the £8bn figure about money being taken from the existing rail budget true? If yes HS2 should be scrapped immediately with the £40bn+ spent modernising the existing network which will offer much greater value.
We do not know if they will back or not yet. First Transpennine have started they would like to bring the services back via Bolton but I know their influence is limited.
Keeping them via Wigan does stop them being commuter trains as Wigan to Manchester commuters are just using them now...
From May the new journey time will be one hour 28 mins with the Liverpool to Newcastle services.
http://www.realtimetrains.co.uk/train/G33812/2014/06/02/advanced
Another strong set of figures for Bolton, moving from 3.259mn to 3.583mn in a year. And yet some on this site think its fine for TPE's Scotland routes should stay away post-electrification when there is every increasing demand year after year.
Even during off-peak times a six car 185 can easily be approaching full on a Blackpool North to Manchester Airport run. Why are even discussing anything smaller than six coaches? When the East Coast Class 225s become surplus why can't Transpennine routes make use of those. Only two / three...
Given this would create extra capacity in the morning between Blackpool North and Wigan North Western is there scope for any Northern run Blackpool North to Liverpool services be short formed and any spare DMUs used for Bolton routes. Do they even run the full Blackpool to Liverpool route that...
TP have made it clear they have no interest in restoring their half hourly Bolton service. A handful of the spare 185s could have been kept for a half hourly Chorley to Oxford Road stopper but they had no interest in such a service.
It would be selfish if TPE blocked any attempt from Virgin...
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.