• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. S

    Maintaining ageing road infrastructure

    I'd be interested to know what the long term plan is for the M4 elevated section. It was closed some years back for urgent structural repairs, and more recently there have been lane closures on the A4 underneath for works on the structure. Presumably these are all just kicking the can down...
  2. S

    Class 701 'Aventra' trains for South Western Railway: progress updates

    The issue at Richmond seems to have been resolved thankfully. Unfortunately 8 cancellations on the Windsors today and 6 on Shepperton. SWR still unable to reliably deliver the few 701 diagrams they are trying to run :'( Happy new year.
  3. S

    Class 701 'Aventra' trains for South Western Railway: progress updates

    Had a ride on one earlier, I was a bit surprised that the superior acceleration didn't lead to us making up any of the delay caused by the speed restriction at Richmond (when is that due to be fixed?).
  4. S

    Class 701 'Aventra' trains for South Western Railway: progress updates

    I understand all that, although only themselves to blame for being so far behind with it all. Given how few services are running today though there is no excuse for short forming.
  5. S

    Class 701 'Aventra' trains for South Western Railway: progress updates

    Again a 4 coach train on a match day extra today. Despite only running a Sunday timetable (as an aside I thought bank holidays were usually Saturday service) they couldn't muster an extra 450 from anywhere or rejig the diagrams to make sure the 4 car wasn't on that service. By now they should...
  6. S

    Activating SWR Tap2Go and loading a Railcard

    How strange... I'm using the pixel 9 pro XL and this is what I get: Image shows text advising national rail smartcard manager app not available for my phone.
  7. S

    Activating SWR Tap2Go and loading a Railcard

    Is this app still current? For me the Google play store says 'not available for your device because it was made for an older version of Android.' if people are still expected to use it but they don't bother keeping it updated that's pretty poor...
  8. S

    Fun and games at Ealing Broadway 27 Dec

    Pretty incredible that this wasn't known before today given how meticulously planned these works supposedly are.
  9. S

    Class 701 'Aventra' trains for South Western Railway: progress updates

    That diagram is booked to work the 16.50 Waterloo to Reading via Brentford, which is run specifically to deal with match day crowds. Good work :rolleyes:
  10. S

    Class 701 'Aventra' trains for South Western Railway: progress updates

    Yes, and the 701's were going to be in service in 2019. I'll believe it when I see it because the introduction so far gives me no confidence at all that things will improve quickly.
  11. S

    Class 701 'Aventra' trains for South Western Railway: progress updates

    Disagree here, none of the 5 cars should be introduced until all of the 10 car units are in service. Given how much capacity SWR have cut over the past couple of years I wouldn't want to give them short trains - they will inevitably start running them as single units. The 450 and 455 will...
  12. S

    Class 701 'Aventra' trains for South Western Railway: progress updates

    I didn't catch the number but that must have been the one blocking platform 6 at Clapham when I was there earlier. It still had Windsor on all the displays so there were some confused passengers when the real Windsor train (15:13 I think) arrived on platform 5.
  13. S

    SWR Touch Smartcard

    Thanks, I've found out you can start from anywhere - useful as depending on where I'm going I sometimes start at Heathrow T4. This is happening to me too. On two occasions now I've pre loaded an Ashford to London 1-6 travelcard and been incorrectly charged £1.45 The first time I complained I...
  14. S

    GWR Sunday Cancellations - crew availability - why?

    So they can blame it on the private operator... And then look like saviours when they come in and offer a deal once nationalised.
  15. S

    UK switching to electric vehicles discussion

    3.1 KWH is a bit on the low side, accepting that is based on what they tested. I averaged 4.3 KWH over a year in my ID:3 doing over 10,000 miles. It would have been higher if my wife never drove it with the heating and demister on full blast everywhere regardless of whether its needed or not <D
  16. S

    Class 701 'Aventra' trains for South Western Railway: progress updates

    Seems like a no brainer then - would save time at each station.
  17. S

    TOC contract expiry dates

    The moronic cuts on SWR are still here. At least Southeastern have had many of the services cut during COVID restored.
  18. S

    TOC contract expiry dates

    Cautiously optimistic and pleased SWR will be the first to go. Hopefully we'll get some improvements as the government will want to show the benefits of nationalisation
  19. S

    Class 701 'Aventra' trains for South Western Railway: progress updates

    Might as well book everything as 4 or 5 car then. That way SWR can truthfully say they are not short forming.
  20. S

    Class 701 'Aventra' trains for South Western Railway: progress updates

    Suspect you are right - but then it isn't a revenue black hole. If it IS a revenue black hole and SWR know about it then they should be doing something about it. I am very surprised they haven't targeted Kew Bridge on a match day. Anecdotally I am aware of a lot of ticketless travel from the...

Top