• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. N

    GBRF Stockport/Manchester trainees

    Unless you know something I don’t, it states applicants MUST have passed a valid psychometric test in the past 5 years.
  2. N

    Service Engineer

    Who is this for?
  3. N

    Qualified driver changing TOC’s - Recruitment process

    Brilliant, thanks for the reply. What you say was pretty much what I expected and seems logical.
  4. N

    Qualified driver changing TOC’s - Recruitment process

    Hi. Does anybody have any experience or know what is involved in a qualified driver applying for a job with another TOC? I know of the ATOC B1 Form (sharing of safety information) but wondered the process going forward. I imagine all TOC’s are different but once you have your European Drivers...
  5. N

    Pictures of inside locos. Any good ones?

    Are they? Can i ask where?
  6. N

    HS1 operating incident?

    it is fool proof because it puts the brakes in, that’s the issue.
  7. N

    Train felt like it was derailing

    In VMI’s? I am surprised
  8. N

    Train felt like it was derailing

    Dampers, they’re called dampers.
  9. N

    GC 180 empty stock move catches fire near Wakefield (02/06)

    Does anybody know the cause of the fire or how bad?
  10. N

    drug test

    Without trying to alarm you, i'd be alarmed if i were you. The only time i've known of the sample going to the second stage is when they've found something and they just need to quantify it.
  11. N

    Train leaving with door wide open

    They're just locked out of use and have a full inspection when next on depot (or i imagine they could at a platform with suitably trained staff)
  12. N

    Wheels flats

    All power cars are monobloc!
  13. N

    Hull Trains 180s

    In their last 12 months at OOC, a unit was NEVER stopped awaiting a major component (engine, transmission, cooler group or wheelset) The only time there was one stood down awaiting a major component was for the bogie overhaul they went through. I believe the problem to be less of a spares...
  14. N

    Highland Chieftain strikes length of CWR left foul after engineering work, 25 Feb 2018

    Be interesting to see the report on this. Power car lifeguards are only secured by two 8.8 grade M16 fasteners, i've seen several come in with missing bolts and the lifeguard at an angle.
  15. N

    Debate about HST classification

    I'd be interested in seeing this coupling equipment. The standard bars carried in the guards van on HST power cars ( or certainly GWR's) are for either power car to power car or a standard draw hook and they can only be used to rescue a failure.
  16. N

    Grand Central Class 180 Interior Refresh

    The first unit (180104, 56 car i believe) had significant corrosion inside the sole bar which had to be rectified, it was running on an engineering concession in it's last few months at GWR. There is also another unit that requires this work doing but the remaining units have been inspected and...
  17. N

    DMU failures and revving up

    The unloader valve just dumps the air between the compressor and the check valve so that when the compressor starts up again, it's not starting up to a pressurised system. Basically taking the load off of the compressor.
  18. N

    Heathrow Connect suspended all day (13/10/17)

    Except you haven't, the bloke died attempting it so no cable got stolen, proving that nicking OHLE cable with 25kv running through it is tricky
  19. N

    Fire at Laira Depot (17/04)

    Was it 43025 that had the fire that was believe it or not, down to a coolant leak? I believe coolant had leaked onto the turbo and ignited.

Top