Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!
And the slightly odd, but necessary due to the loading gauge, Repositioning of the horns.
125 Group vehicles also have window bars fitted to their stock.
Indeed, a short drag and some hired in GBRf drivers isn’t going to make a dent in railway safety budgets.
And if anything, it’s probably cost less to do than GBRs Liverpool Street publicity event last week too. Two of these three live on the western, and all the IET has received is some measly...
Not so suggested but confirmed. Romic put out their social media post yesterday confirming that those two are now theirs - and are to be used largely as their two 20s currently are, but can also be available for Railtour use (with GBRf using theirs for the forthcoming LU moves and H+H 50 being...
Indeed, boom and bust. The two I can see being most affected over the coming years are CAF’s Newport facility (unless they are building the LNER fleet?) and Hitachi’s Newton Aycliffe facility (less at risk of closure than CAF but I can’t see more orders than that from open access coming).
Well I take that back then and well done to Hastings Diesels and Bluebell Railway!
Just thinking about the irony - you’d never see such a thing 10 years ago!
Wouldn’t be the first time the WCML has appeared on the GMWL…;)
Even Brunel has once been spotted eyeing up the quality dangly coat hanger traction :lol:
Exactly. Issues can crop up with anything over time and use. Not that I am trying, nor wish to defend Hitachi, but a unit which may be fine during static testing at Merchant Park can develop faults when members of the public start to use them whilst being ran up and down the MML at 100 and...
They do have a small choice of Diesel locos - their resident 09, on holiday 33108 and the resident 73. I wonder if 1001 will arrive earlier now though with the steam ban in place and with no tours booked until late September, that would allow more flexibility and allow them to advertise...
We’re certainly bordering on the speculation side of things here but, I would say the likelier contenders are between Alstom and Siemens - both of course will need work, both have a significant UK presence. Neither Hitachi and CAF have particularly covered themselves in glory of late, more so...
On a side tangent, as a result of this can we expect to see the evening GWR stopping service re-instated which ran during last year’s temporary timetable?
Out of interest, E400 MMCs 11664/65/66/67/68 which came down from Midlands to South for the Farnborough Airshow have since moved on to South East and to Eastbourne - are these permanent transfers to South East?
It never ends…
Whilst I fully understand that combining utility works makes sense while the road is closed and you have access, it does feel like it’s one thing after another unfortunately.
The only other thing I can think of is, given the time of the morning and if they have them, possible use of the Webasto heater has been switched on prior to entry to service?
I can’t see why not, it’s worked for Northern and East Midlands Trains / Railway for several years. I think there’s been a few hybrid units that way too.
They may still be of use to form Hybrid units though, or if the Robo-Bog / PRM toilet can be installed into one vehicle. Is there much difference between the 52 / 57 cars on a 158 other than the toilet? Eg could two 57 cars work together with suitable modifications?
We are aware of an issue with emails from the Forum to Microsoft-based email accounts (hotmail/outlook/live.com email addresses). This is being looked into currently, thanks for your patience meanwhile.