• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Search results

  1. 4

    Why I believe battery powered trains aren’t the answer

    mods note: All of the stuff about batteries is so interwoven into the last few pages of the original thread, it’s going to be virtually impossible to separate it all out. The best option seems to be to pick out the most relevant parts of the discussion and start a new thread. This was all split...
  2. 4

    GWR, SWR and Chiltern possible combined fleet order - Philip Haigh

    I get the distinct feeling the issues around CO2, oil and gas might be going soon. Our next rulers are not exactly Net Zero enthusiasts... 1752739700 I'm not suggesting zero growth, but you just order lots and lots of 3s. So when a train is leaving Portsmouth in the morning, or, the first 3...
  3. 4

    GWR, SWR and Chiltern possible combined fleet order - Philip Haigh

    Wonderful. A very light body, with no people on it, and with no chance of it all going to sh*t when the train gets stuck between stations because of some sort of serious disruption. And if you want a proper, intensive service with a unit to just soldier on, you have to hope you've got time to...
  4. 4

    GWR, SWR and Chiltern possible combined fleet order - Philip Haigh

    And again, you are missing the point. As I've already said, a lot of places are staying diesel for a bloody long time, and therefore this order could technically be one of the last of the 'diesel' orders, albeit in the sure knowledge that in time they will be cascaded out to extremities. ROSCOs...
  5. 4

    GWR, SWR and Chiltern possible combined fleet order - Philip Haigh

    Your belief in battery power is commendable, albeit misplaced and incorrect.
  6. 4

    GWR, SWR and Chiltern possible combined fleet order - Philip Haigh

    A DMU / DEMU would be readily-built with very efficient AC motors. The same motors can be fed from a DC supply, through all the electrical gubbins. If you put the said DC-related gubbins in a modular rack, which can be unbolted and chucked in a skip in 20 years time, that's great. The same for...
  7. 4

    Local services in the Huddersfield area post TRU

    Random question for those who genuinely know (and go on the trains), last time I did one from Rose Grove to Manchester Victoria via the Todmorden curve, the thing was totally empty. It was a Saturday, about 13:00, and I assumed it would be a popular train with people going to Manchester for...
  8. 4

    GWR, SWR and Chiltern possible combined fleet order - Philip Haigh

    All this tri-mode stuff gets on my t*ts. You add mountains of gear, and then have a train that's wasting energy to cart it around. And all so we can pretend we're making extremely minor CO2 savings, as if 200 people on a train isn't already vastly better than 150+ cars. Diesel / DC is fine for...
  9. 4

    Global Airlines launch flights announced

    Tarbes, that's it. Accidentally mixed that up with the place in Spain that keeps a lot of stuff dry.
  10. 4

    GWR, SWR and Chiltern possible combined fleet order - Philip Haigh

    I'm not sure it needs AC provision. Because, if you make it a 'pure diesel' with a DC bolt-on, when such a time comes that AC is available on Chiltern, you just send these away to a new operator and buy straight EMUs. EWR from Bedford to Cambridge is almost certainly going to be non-electrified...
  11. 4

    Global Airlines launch flights announced

    The aircraft has moved from Dresden to somewhere in Spain today for storage. Looks like trouble.
  12. 4

    GWR, SWR and Chiltern possible combined fleet order - Philip Haigh

    Thought about that about 5 minutes ago. Just continuously relegate the 175s further along to lesser and lesser routes until you finally bin them off. Start at Southern, then do Chiltern, the SWR, and finish off with GWR. GWR barely releases anything useful (if anything), and by then we may get...
  13. 4

    December 2025 Timetable Change Speculation

    Sort of thing where, if it's going to be an auxiliary Cross Country for Leeds to Sheffield via Westgate, it effectively becomes an Intercity service. A follow-on order of a few more 810s and making that an EMR service which does the Sheffield - Nottingham section as well would be quite nice...
  14. 4

    December 2025 Timetable Change Speculation

    I don't mind through services, but I do think Central Trains got their fingers burnt by doing some wild, whacky, very lengthy through services which meant that with delays from as far back as Crewe or Stoke, stuff was being cancelled between say Newark and Lincoln or Boston and Skegness to get...
  15. 4

    GWR, SWR and Chiltern possible combined fleet order - Philip Haigh

    I mean, I don't think its even beyond the realms of possibility to have modular bits which can be unbolted and something else put underneath. Fair enough, a portion of the GWR ones and the entirety of the SWR ones might benefit from being DC and Diesel (perhaps all 3 car, with some luggage space...
  16. 4

    GWR, SWR and Chiltern possible combined fleet order - Philip Haigh

    No sensible person will order 2 car trains from here on in.
  17. 4

    GWR, SWR and Chiltern possible combined fleet order - Philip Haigh

    P Sounds great. More of this please. Granted, a singular fleet order will not work, but you could have the same high-accelerating 100mph unit (a-la 185) but with a Metro or longer-distance interior and one operator effectively being asked on behalf of all three to hold the bigger spares, and...
  18. 4

    Idea to optimise the WCML (ignoring HS2)

    I think it's clear that in the longer term, a half-hourly MK (but especially Bletchley) to West London service is quite important. You don't want to change at both Watford and MK if you can help it, as by that point, journeys from south of the river end up being easier through London itself and...
  19. 4

    Local services in the Huddersfield area post TRU

    I am not minimising the fact that people from outlying towns and villages in what is West Yorkshire might need to get to Huddersfield, but, quite honestly, the key surely is much better overall services that would lend themselves to the whole area being upgraded and connections, more frequently...
  20. 4

    Idea to optimise the WCML (ignoring HS2)

    Queens Park benefits include the being closer to London, and having existing platforms (except I assume they'd have to be rebuilt to conform to current standards), but on the whole, I can't see much against Willesden Junction. It's got Old Oak, North London, West London, and whatever else. It's...

Top