What I think is wrong with current OHLE electrification practice

WAO

Established Member
Joined
10 Mar 2019
Messages
1,244
Look beyond any border, whether of Scotland, Wales or Ireland, and you'll see batteries AND electrification.

WAO
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,396
1. Why not look north of the border to Scotland for inspiration, where it's being delivered at lower rates, rather than writing it off as a solution.

Even the rates being achieved in Scotland seem too high to be worthwhile on the bulk of the railway

In any case, if somewhat lower costs can only be obtained first purchasing thousands of track kilometres of very expensive electrification go establish skills retention, it is still expensive.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,633
Location
Torbay
The analysis (in GB and elsewhere) has moved toward the use of standardised charging infrastructure e.g. 25kV OHLE or 3rd /4th rail built to open standards as the defaults to avoid Adrian Shooter's proprietary connector and charging system approach that creates lock-in.
That particular implementation of fast-charge tech was purchased by the GWR franchise company at Vivarail break up, wasn't it? Or was it the broader First Group? If GWR, perhaps the IP goes to GBR on takeover.

I agree generally that existing non-proprietary power interfaces should be used where possible, but if GBR end up owning the Greenford tech it could become the third standard.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,297
Even the rates being achieved in Scotland seem too high to be worthwhile on the bulk of the railway

In any case, if somewhat lower costs can only be obtained first purchasing thousands of track kilometres of very expensive electrification go establish skills retention, it is still expensive.
GBR in the Rolling Stock and Infrastructure Strategy were fairly clear that a minimum of ~25% of the route mileage in the currently unelectrified network would need to be electrified. This still equates to thousands of stkm to electrify.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,396
GBR in the Rolling Stock and Infrastructure Strategy were fairly clear that a minimum of ~25% of the route mileage in the currently unelectrified network would need to be electrified. This still equates to thousands of stkm to electrify.
The previous British rail industry electrification strategy suggested near total electrification with only marginal use of batteries.

The direction in the trend line is clear.

The report (page 16) says:
GBR will use detailed route-level analysis to determine the right level of electrification to support the removal of diesel traction. This GBR’s traction choice approach will generally require around a quarter of the currently non-electrified railway to be energised, or an equivalent level of capability provided through alternative battery charging technologies.

Which is pretty far from saying that 25% will actually need to be electrified.
The report also doesn't really define what "alternative battery charging technologies" are, but if that means static chargers then the amount of new electrification could be very small indeed.
 
Last edited:

Class 317

Member
Joined
7 Jul 2020
Messages
593
Location
Cotswolds
The previous British rail industry electrification strategy suggested near total electrification with only marginal use of batteries.

The direction in the trend line is clear.

The report (page 16) says:


Which is pretty far from saying that 25% will actually need to be electrified.
The report also doesn't really define what "alternative battery charging technologies" are, but if that means static chargers then the amount of new electrification could be very small indeed.
Or very large if you take the meaning to be the number of services transferred to electric operation rather than miles of OHLE.

In a battery/ OHLE / Charger hybrid strategy that seems a more sensible way to think about it.
 

WAO

Established Member
Joined
10 Mar 2019
Messages
1,244
I think that it means virtually all passenger trains will be electrically worked, the gaps, fringes, short branches and light loads by battery, the main lines for and with charging points by OLE. The wired sections are 25% of the 60% of the network that are unwired, c1500 route miles or c5000stkm, 5 - 15BN pounds, over several decades, good value compared to HS2.

The mains/battery/inverter/charger/train battery/tractive effort link promises to be electrically inefficient as there are significant cumulative losses at each stage, especially as it is stated that power availability is questionable.

I wonder what the next Treasury "do nothing" excuse will be?

WAO
 
Last edited:

67018

Member
Joined
14 Dec 2012
Messages
487
Location
Oxfordshire
very cynical but sadly I agree with you and was thinking exactly the same thing.
Hasn't that question already been answered on this thread? - the railway has gained a reputation for burning masses of cash on these projects. There are many, many other areas of public service crying out for money that haven't had anything like the amount of money thrown at them as rail has so there are plenty of better things to spend the money on.

I hope this isn't the case, but the industry has some work to do to rebuild credibility.
 

Class 317

Member
Joined
7 Jul 2020
Messages
593
Location
Cotswolds
Hasn't that question already been answered on this thread? - the railway has gained a reputation for burning masses of cash on these projects. There are many, many other areas of public service crying out for money that haven't had anything like the amount of money thrown at them as rail has so there are plenty of better things to spend the money on.

I hope this isn't the case, but the industry has some work to do to rebuild credibility.
The industry needs to be moved beyond thinking that OHLE is always better and accept that technology has moved on and business cases have changed.

Future schemes need to be built around both installing OHLE, Charging stations and BEMU'S as part of larger schemes covering wider areas.

For Example any extension of MML wires to Sheffield and Nottingham needs to be designed to allow EMR regional, XC Turbostar and Northern local routes to also be converted to electric operations via BEMU'S, charging stations and enough capacity in the OHLE to recharge BEMU'S.
 

eldomtom2

On Moderation
Joined
6 Oct 2018
Messages
2,403
Hasn't that question already been answered on this thread? - the railway has gained a reputation for burning masses of cash on these projects. There are many, many other areas of public service crying out for money that haven't had anything like the amount of money thrown at them as rail has so there are plenty of better things to spend the money on.

I hope this isn't the case, but the industry has some work to do to rebuild credibility.
However, pretty much any infrastructure project in the UK costs more than it does in other European countries. The railways share some blame, of course, but it's clear that there are other factors outside of their control here.
 