• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by lfc2014uk

  1. L

    Liverpool Lime Street Upgrade Phase 3 suggestions

    After £140m upgrade to Liverpool Lime Street. I felt disappointed that the project didnt go far enough and the station can only handle an extra 3 trains an hour. With the former platform one now sitting empty, my idea would be to: 1) Rebuild Northern Rail offices at the top of the platform by...
  2. L

    Greater Anglia 321 and 317 Refurbishment

    Obviously Greater Anglia have come up short with rolling stock calculations and have had to refresh old stock i.e. 317s when they should have been scrapped as they have reached end life. This seems to be happening with many other ROCs like TPE who might have to take MK4s and loco's from EC.
  3. L

    East Coast 225’s - What will happen to them?

    Maybe Liverpool - Cardiff Liverpool - Holyhead Via Halton Curve 5 car units
  4. L

    Mark IV carriages: Could TPE use them?

    I think MK4 could be used on the TPE Middlesbrough & Hull routes. I also think it would be a good idea for some 4/5 car units to run Liverpool - Chester - Cardiff / Holyhead routes once Halton Curve is opened. This would be a stop gap until new franchise announced and new rolling stock ordered
  5. L

    Merseyrail Upgrades

    Same happened to my family but on airport bus 80A it stank of wee. I think it caused by chemicals in cleaning products they use at depots in Liverpool already complained to Arriva on twitter.
  6. L

    "Cheshire Oaks - Merseyrail / Northern / ATW new line"

    Source - Staff at Cheshire Oaks A signed agreement Of understanding has been made between Merseytravel, Cheshire County Council, Network Rail and the owners of retail outlet Cheshire oaks to build a new railway station with 3rd rail capacity and link to Ellesmere Port to Helsby line running...
  7. L

    Merseyrail Upgrades

    First time the closed was to replace track only. Problem was the guy in charge got metric and imperial mixed up causing the wheels to degrade so fast that 30% of fleet had to be withdrawn to change the wheels. 2009 sections of the loop where replaced with electrical and drainage. But it seems...
  8. L

    Edge Hill Upper Level Crossover (WCML) Reinstall?

    Next month Merseytravel will meet to discuss infrastructure projects for 2018/19 for Merseyside. One of these is the reinstatement of an upper level crossover of WCML across from Edge Hill Maintainance Depot. A Double track, overhead cables and missing bridge would be needed to reinstated...
  9. L

    Liverpool Overhead Railway

    Steve Rotherham MP for Walton, Liverpool and Metro Labour Mayoral Candidate has said that if he wins the election in May, Liverpool could get there overhead Railway back as a tourist attraction. He said costings where around £70-100m depending on length of line through a public private...
  10. L

    Rail Class 373 Eurostar carriages possibility

    Just emailed Chairman Claire Hollingsworth at Eurostar regarding class 373 being taken for scrap. I offered an alternative in that the carriages should be offered to ROCs and used with loco's 67s (or other) on long haul routes across North Wales or Northern England - ATW, Northern, EMT, Virgin...
  11. L

    ATW spend half a million on Pacer refreshes

    Unless the new franchise winner buys new fleet of trains or gets a large hand Me downs from other operators. W&B are going to be well short of units when the new European Access Laws come in effect in 2020 as they won't be able to use Class 142/3. Only alternative is to upgrade them to class...
  12. L

    Class 313 (Great Northern) destiny - Eversholt Rail Group

    I've just been told by Wendy at Eversholt Rail that there 44 class 313s will come off lease from Thameslink in Q3 of 2018. Between 6-8 units will go to Merseyrail as back up units to there sister Class 507/8 fleet until MerseyRail get there new fleet in 2020. The rest will be scrapped but spares...
  13. L

    Route Pathway Availability In The Timetable

    Does anyone know if I can write to a particular department whether it be Network Rail, DfT, ORR about available pathways on a particular route? Example: Space in timetable to extend the Derby - Crewe (EMT) service to Liverpool
  14. L

    Warrington West & Deeside Parkway - New Rail Stations

    Yes my friend who is a stakeholder at Northern told me. Network Rail said if funding becomes available then work could start 2018/19
  15. L

    Warrington West & Deeside Parkway - New Rail Stations

    The Wrexham-Bidston Rail Users' Association (WBRUA) has published a schematic plan for its proposed Deeside Parkway station. This station would enable workers to reach the Deeside Industrial Park by train and provide park and ride facilities with easy access from the A548. In the past five...

Top