After £140m upgrade to Liverpool Lime Street. I felt disappointed that the project didnt go far enough and the station can only handle an extra 3 trains an hour.
With the former platform one now sitting empty, my idea would be to:
1) Rebuild Northern Rail offices at the top of the platform by moving it further back and adding extra floors so not to lose sq footage.
2) Straighten the disused platform (0)
3) Tunnel veering off to the left coming out at the old Waterloo Tunnel entrance. The exisiting tunnel that only goes up half way to Edge Hill station before joining the main tunnel by extending it veering to the left and meeting up with the new tunnel.
4) Re-instating the missing bridge where the upper level meets the Manchester line and the West Coast Main Line by Edge Hill Depot
5) Finally by re-jigging track layout in this area.
If all these can be done then im sure Liverpool Lime Street could have a further 3 trains an hour.
Allowing new services such as Liverpool - Glasgow (bi-hourly) TPE, Liverpool - Cardiff (bi/hourly) TfW, Liverpool - Bristol (bi/hourly) XC
With the former platform one now sitting empty, my idea would be to:
1) Rebuild Northern Rail offices at the top of the platform by moving it further back and adding extra floors so not to lose sq footage.
2) Straighten the disused platform (0)
3) Tunnel veering off to the left coming out at the old Waterloo Tunnel entrance. The exisiting tunnel that only goes up half way to Edge Hill station before joining the main tunnel by extending it veering to the left and meeting up with the new tunnel.
4) Re-instating the missing bridge where the upper level meets the Manchester line and the West Coast Main Line by Edge Hill Depot
5) Finally by re-jigging track layout in this area.
If all these can be done then im sure Liverpool Lime Street could have a further 3 trains an hour.
Allowing new services such as Liverpool - Glasgow (bi-hourly) TPE, Liverpool - Cardiff (bi/hourly) TfW, Liverpool - Bristol (bi/hourly) XC