Next month Merseytravel will meet to discuss infrastructure projects for 2018/19 for Merseyside. One of these is the reinstatement of an upper level crossover of WCML across from Edge Hill Maintainance Depot.
A Double track, overhead cables and missing bridge would be needed to reinstated this missing section. It was once used for trains travelling down the now disused Wapping Tunnel.
At the moment there is a bottle neck where the track goes from 4 to 2 back to 4 on the bend. By bringing this back into use capacity would increase allowing more services in and out of Lime Street further down the line and also heading down towards Liverpool South Parkway.
A Double track, overhead cables and missing bridge would be needed to reinstated this missing section. It was once used for trains travelling down the now disused Wapping Tunnel.
At the moment there is a bottle neck where the track goes from 4 to 2 back to 4 on the bend. By bringing this back into use capacity would increase allowing more services in and out of Lime Street further down the line and also heading down towards Liverpool South Parkway.