• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

South Wales 'Metro' updates

s17663

New Member
Joined
30 Sep 2026
Messages
1
Location
Penarth
They said earlier that there was a broken rail and they were waiting for someone to turn up to sort it out but as (some) services seemed to be still running, I'm not sure how broken it actually was.

Nevertheless, on the whole the Valley Lines seem to be quite a lot more reliable at present than they were not so long ago
Another incident today, departure boards said “broken rails in Penarth area” Given this is the second time in 10 days, maybe a track replacement on the Penarth line is needed?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Envoy

Established Member
Joined
29 Aug 2014
Messages
3,158
‘Wales This Week’ on ITV Wales tonight at 7.30pm - Friday 2 October 2026 - will be covering transport issues in Wales. Should be of interest?
 
Joined
22 Jun 2013
Messages
609
Does anyone know what the issue with the Coryton line was yesterday? Lots of cancellations allegedly due to a signalling issue.
 

Coleridge

Member
Joined
14 Mar 2023
Messages
216
Location
Penarth
Does anyone know what the issue with the Coryton line was yesterday? Lots of cancellations allegedly due to a signalling issue.

Allegedly? Are you suggesting that TfW is being anything other than completely open and honest with its customers? :D

There were some signalling issues at Cardiff Central yesterday, which is all TfW usually needs to start cancelling services on the Coryton line. Creative solutions, such as running a shuttle between Coryton and Heath LL to connect to Cardiff and beyond, are probably just too much trouble for them.

I don't actually know the reason. But I live on a branch that has had all its trains cancelled three times in the past month allegedly due to a broken rail.
 
Joined
22 Jun 2013
Messages
609
Allegedly? Are you suggesting that TfW is being anything other than completely open and honest with its customers? :D

There were some signalling issues at Cardiff Central yesterday, which is all TfW usually needs to start cancelling services on the Coryton line. Creative solutions, such as running a shuttle between Coryton and Heath LL to connect to Cardiff and beyond, are probably just too much trouble for them.

I don't actually know the reason. But I live on a branch that has had all its trains cancelled three times in the past month allegedly due to a broken rail.
:lol: I'm very much suggesting that!

Poor old Coryton needs to be upgraded from a sacrificial lamb, it's infuriating and I live in south London, but use it when I'm home. Even as an occasional user I experience so many cancellations.
 

AdamWW

Established Member
Joined
6 Nov 2012
Messages
6,012
Poor old Coryton needs to be upgraded from a sacrificial lamb, it's infuriating and I live in south London, but use it when I'm home. Even as an occasional user I experience so many cancellations.

It's got a lot better. Still not great though.
 
Joined
15 Mar 2026
Messages
15
Location
Cardiff
I tried to use the Coryton line recently when I went for a walk from Radyr station through forest farm country park/long wood nature reserve. The wait for the next train from Coryton when I got there was so long it was quicker to just walk back to Radyr station and get a train from there back to queen street.
The line needs a more frequent and more reliable service, especially given how large of a catchment area it serves. Hopefully a passing loop will remedy some of the line's problems.
 
Joined
1 Sep 2017
Messages
107
Chepstow line has only 1tph too, and the spring TfW update suggested that that changing that is not a priority. I really struggle to the case of 4tph when so many other lines haven't even got 2tph...
 

AdamWW

Established Member
Joined
6 Nov 2012
Messages
6,012
I tried to use the Coryton line recently when I went for a walk from Radyr station through forest farm country park/long wood nature reserve. The wait for the next train from Coryton when I got there was so long it was quicker to just walk back to Radyr station and get a train from there back to queen street.

You must walk quite fast!

Unless it was a Sunday or there was a cancellation.

Chepstow line has only 1tph too, and the spring TfW update suggested that that changing that is not a priority. I really struggle to the case of 4tph when so many other lines haven't even got 2tph...

I'd say generally the shorter the journey the more frequency matters in getting people to use trains - it also doesn't take as many additional trains and crews to achieve an increase in frequency.
 

positron

Member
Joined
18 Oct 2022
Messages
732
Location
Cardiff
Chepstow line has only 1tph too, and the spring TfW update suggested that that changing that is not a priority. I really struggle to the case of 4tph when so many other lines haven't even got 2tph...
Chepstow line absolutely needs more services but the south Wales valleys has a population nearing 1 million. Chepstow, caldicot and lydney has like 50,000, being generous. Some areas absolutely warrant more services than others.

2TPH should be a minimum everywhere though. The fact Maesteg still hasn't got there's is crazy.
 

Dr Day

Member
Joined
16 Oct 2018
Messages
762
Location
Bristol
Chepstow line absolutely needs more services but the south Wales valleys has a population nearing 1 million. Chepstow, caldicot and lydney has like 50,000, being generous. Some areas absolutely warrant more services than others.

2TPH should be a minimum everywhere though. The fact Maesteg still hasn't got theirs is crazy.
Chepstow and say Bargoed (one of the bigger places on the Rhymney line) both have a population of around 12k.

TfW don’t even run hourly from Chepstow in the morning peak - Cross Country provide the main commuter service to Newport, Cardiff and Severn Tunnel J for onward journeys with GWR to Bristol. Hopefully GBR will continue this provision and increase it off peak which is probably a more cost effective way for the UK taxpayer of Chepstow getting 2 tph than TfW running additional services.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,748
Location
Nottingham
Chepstow and say Bargoed (one of the bigger places on the Rhymney line) both have a population of around 12k.
The total population served by a route is more important in determining the demand than the population of one of several settlements served. Also, other things being equal fewer people will travel to the major destination (Cardiff in this case) from origins that are further from it.
 

Envoy

Established Member
Joined
29 Aug 2014
Messages
3,158
Chepstow is at the outer eastward limit of the SE Wales Metro contactless area & hopefully that has encouraged greater use of the railway? To drive from Chepstow to Cardiff is a nightmare what with the M4 at Newport and massive congestion on the A48 Eastern Avenue. A large hike in price between Lydney & Chepstow could well induce Lydney people to drive to Chepstow to catch trains - even though parking is limited. In addition, Lydney only has an hourly service whilst Chepstow has a half hourly frequency at certain times of the day - well, the trains have to slow down to take the sharp bend in anycase.

Having 2 coach trains (TFW & Cross Country) operate on this route can't do much to increase patronage. (I see today that 153’s are on the Cardiff to Cheltenham route).

My photo below shows the Cross Country Cardiff to Edinburgh service pulling out of Chepstow as a TFW Cheltenham to Cardiff train arrives.
 

Attachments

  • CHEPSTOW STATION - VOYAGER & TFW 197 (1).jpg
    CHEPSTOW STATION - VOYAGER & TFW 197 (1).jpg
    4.7 MB · Views: 61

The exile

Established Member
Joined
31 Mar 2010
Messages
9,466
Location
Somerset
Also, it's pointless double tracking all the way up the Valleys if the bottleneck of Queen Street north bridge remains.
That would be true if the reason for redoubling were to be to add yet more services. If the point is to improve the reliability / resilience of the service at the maximum throughout of that bridge, then it’s not - though good luck with justifying the cost on those grounds alone!
 

WelshBluebird

Established Member
Joined
14 Jan 2010
Messages
5,612
Re Chepstow one of the burns stations proposals has a 2nd train per hour upto Cheltenham, so presumably calling at Chepstow etc too. So it is being looked at.
 
Joined
15 Mar 2026
Messages
15
Location
Cardiff
You must walk quite fast!

Unless it was a Sunday or there was a cancellation.



I'd say generally the shorter the journey the more frequency matters in getting people to use trains - it also doesn't take as many additional trains and crews to achieve an increase in frequency.
It must've been a cancellation because the next train on the board wasn't due for 50 minutes after I got there.
Chepstow is at the outer eastward limit of the SE Wales Metro contactless area & hopefully that has encouraged greater use of the railway? To drive from Chepstow to Cardiff is a nightmare what with the M4 at Newport and massive congestion on the A48 Eastern Avenue. A large hike in price between Lydney & Chepstow could well induce Lydney people to drive to Chepstow to catch trains - even though parking is limited. In addition, Lydney only has an hourly service whilst Chepstow has a half hourly frequency at certain times of the day - well, the trains have to slow down to take the sharp bend in anycase.

Having 2 coach trains (TFW & Cross Country) operate on this route can't do much to increase patronage. (I see today that 153’s are on the Cardiff to Cheltenham route).

My photo below shows the Cross Country Cardiff to Edinburgh service pulling out of Chepstow as a TFW Cheltenham to Cardiff train arrives.
I was on one of those voyager services earlier this year and it was absolutely rammed. The conductor started allowing standard class passengers into first class to try and reduce crowdedness. It does couple with an extra unit at Birmingham from what I remember but between Cardiff and B'ham it is effectively a 3 carriage unit, still wholly unsubstantial for a service travelling through multiple fairly large towns and cities.
 

AdamWW

Established Member
Joined
6 Nov 2012
Messages
6,012
It must've been a cancellation because the next train on the board wasn't due for 50 minutes after I got there.

That or you hit the train they miss out to provide a path for the rail head treatment train so it doesn't have to do the branch after close of service.
 

Coleridge

Member
Joined
14 Mar 2023
Messages
216
Location
Penarth
That would be true if the reason for redoubling were to be to add yet more services. If the point is to improve the reliability / resilience of the service at the maximum throughout of that bridge, then it’s not - though good luck with justifying the cost on those grounds alone!

For the past 15 years, I've been visiting Switzerland several times a year to photograph the Rhaetian Railway (RhB), and in that time have seen them construct or extend countless passing loops for the sole purpose of making the service more reliable. Immediately north of Poschiavo station, for example, the track has been doubled for a distance of about a km, solely in order that a northbound train doesn't have to wait at the station for a minute or two for a delayed southbound train. It's an extraordinary investment, but also evidences an attitude to the operation of a train service that we in south Wales can only dream of.

Of course, it has a downside, too, as double-tracked line is a lot less photogenic than single track, particularly when set against glorious Alpine scenery. :)

== Doublepost prevention - post automatically merged: ==

The TfW website no longer provides an end date for the expected disruption on the Bay line, but merely says that it will continue "until further notice". This has been updated in the past couple of days, which suggests that the 398s might be out of action for a good while yet.

(I posted this in the dedicated thread for the 398s but, because of the double post prevention system, that thread is still stuck halfway down page 2 of the forum.)
 
Last edited:

Envoy

Established Member
Joined
29 Aug 2014
Messages
3,158
I was on one of those voyager services earlier this year and it was absolutely rammed. The conductor started allowing standard class passengers into first class to try and reduce crowdedness. It does couple with an extra unit at Birmingham from what I remember but between Cardiff and B'ham it is effectively a 3 carriage unit, still wholly unsubstantial for a service travelling through multiple fairly large towns and cities.
That is the *lone Cross Country Voyager between Cardiff (departure 9.45 weekdays only) & Edinburgh via York & Newcastle. It therefore is bound to attract longer distance passengers and was pretty full when I travelled on it. Looks to me like it should be a 5 car unit and clearly demonstrates the demand for through services between Cardiff and the NE of England. (Edinburgh is about 1 hour quicker via Crewe and the west coast route). I understand that LUMO plan to run services between Cardiff & York so that will certainly be most welcomed and ease the loadings on the present services.

*The 13.05 from Edinburgh (weekdays only) is the direct Voyager to Cardiff via Newcastle - train splits at Gloucester. Goodness knows why they don't run on Saturdays?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,748
Location
Nottingham
That is the *lone Cross Country Voyager between Cardiff (departure 9.45 weekdays only) & Edinburgh via York & Newcastle. It therefore is bound to attract longer distance passengers and was pretty full when I travelled on it. Looks to me like it should be a 5 car unit and clearly demonstrates the demand for through services between Cardiff and the NE of England. (Edinburgh is about 1 hour quicker via Crewe and the west coast route). I understand that LUMO plan to run services between Cardiff & York so that will certainly be most welcomed and ease the loadings on the present services.

*The 13.05 from Edinburgh (weekdays only) is the direct Voyager to Cardiff via Newcastle - train splits at Gloucester. Goodness knows why they don't run on Saturdays?
It runs in the path that is a Nottingham 170 in other hours, a 3-car 170 has about the same number of seats as a 4-car Voyager and the 170s are normally pretty full. So I'm not sure how many passengers are using it between Wales and beyond Derby.
 

Envoy

Established Member
Joined
29 Aug 2014
Messages
3,158
It runs in the path that is a Nottingham 170 in other hours, a 3-car 170 has about the same number of seats as a 4-car Voyager and the 170s are normally pretty full. So I'm not sure how many passengers are using it between Wales and beyond Derby.
The 1st Class was also pretty full when I travelled on the Voyager as far as Chepstow. It also stops at Worcestershire Parkway where no doubt it loads more passengers. The Plymouth to Edinburgh also stops at Worcestershire Parkway a few minutes after the Cardiff train so presumably few people get on board. (The two trains dock in Birmingham).

Anyway, we are off topic here so if anyone wants to continue discussing the provision of services between south Wales and the north-east, I guess they should start a new thread.
 

Top