Are the independent lines, the lines that dive under and cross over?
They are the lines usually only used by freight trains which go under and to the west of Crewe station through Basford Hall Yard and rejoin at Basford Hall Junction. They don’t cross over, but they take freight traffic away from the passenger station. Their recent resignilling makes them more viable/usable by passenger trains, as proposed.
 

Rail Ranger

Member
Joined
20 Feb 2014
Messages
1,175
Although of course they were used by many diverted passenger trains during the 1985 blockade for the remodeling of Crewe station.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,364
Location
Bolton
So, would that mean TfW *not* calling at Crewe for the duration?
Yes although if they are able to call at Sandbach that isn't too far and the passengers from the stopping service would have a bus going that way anyway. Depends on how it fits together, from the other side they'll definitely have to run a bus to cover their own stopping service into Crewe.
 
Joined
7 Jan 2019
Messages
536
Location
North West
I am really not looking forward to this! The work of course needs doing as sadly the station is in a bit of a state. It is a shame all the inconvenience isn't going to result in any enhancements.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,749
I am really not looking forward to this! The work of course needs doing as sadly the station is in a bit of a state. It is a shame all the inconvenience isn't going to result in any enhancements.
Its also for a significant amount of S&C renewals. You can blame those who canned HS2 Phase 2a for what we are left with.
 

CHAPS2034

Member
Joined
13 Mar 2018
Messages
651
IIRC, the independent lines were known as the 'muck-hole' by enthusiasts on Crewe station in the sixties.
 

Trainfan2019

Member
Joined
9 Aug 2019
Messages
530
Do we know if any roof repairs are just to fix the rain that pours in where there is a proper roof? Or, is it also meant that the parts where there was a roof, platforms 2 & 3, is the roof going to be put back on? Why is there no roof there actually, only the supporting framework? Thanks.
 

Tazi Hupefi

On Moderation
Joined
1 Apr 2018
Messages
1,931
Location
Nottinghamshire
Do we know if any roof repairs are just to fix the rain that pours in where there is a proper roof? Or, is it also meant that the parts where there was a roof, platforms 2 & 3, is the roof going to be put back on? Why is there no roof there actually, only the supporting framework? Thanks.
No repairs - it is about removal, not fixing or replacing. I guess it won't leak anymore if it's not there!

It's always been about money - but over the years there have been various plans to either relocate and rebuild Crewe, or more recently, massively enhance for HS2 - all of which came to nothing.

Victim of HS2 cuts.
 

JakeMurphy

Established Member
Joined
30 Aug 2018
Messages
1,235
May I just ask when the timetables during the works are usually confirmed?
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,869
Location
Beeston (Notts)
I expect we probably won't be getting any works related to the power supply in the Crewe area done at the same time.
 