Yes, that’s the only regular booked passenger service.Am I correct in thinking that the only passenger service to use Ely West Curve is the 1556 Sundays only Norwich to Manchester Piccadilly?
I think it’s just route retention for the crews. It’s been only that train for around 20 years now. Others do occasionally traverse the curve if there is say a problem with equipment in the rear cab.Thanks. Do you know why it does that, rather than make the stop at Ely like all other trains on that route?
It was Nottingham crews for at least 20 years, then changed to Norwich in May, prompting the usual panic to make sure they were all current on it.It'll be to maintain route knowledge for the EMR crews. That said I'm struggling slightly to see how one instance a week is enough, even if it's only Norwich crews that sign it.
It's used during disruption to make up time by skipping the Ely reversal.
Route refresh can be done using route learning films etc.It'll be to maintain route knowledge for the EMR crews. That said I'm struggling slightly to see how one instance a week is enough, even if it's only Norwich crews that sign it.
It's used during disruption to make up time by skipping the Ely reversal.
It also means a train traverses it each week so they can check the route is good to use. It allows a crew to see if there’s any over growing foliage, dodgy rails etc. so if there’s a closure and they suddenly need to send multiple trains down there a day, they know the route is ready for it.It'll be to maintain route knowledge for the EMR crews. That said I'm struggling slightly to see how one instance a week is enough, even if it's only Norwich crews that sign it.
It's used during disruption to make up time by skipping the Ely reversal.
Several freight trains use it every day.It also means a train traverses it each week so they can check the route is good to use. It allows a crew to see if there’s any over growing foliage, dodgy rails etc. so if there’s a closure and they suddenly need to send multiple trains down there a day, they know the route is ready for it.
It wouldn’t close. It’s used by many freight trains every day.I suspect it is also a "closure protector".
If the service were to be withdrawn they would have to go through the rather laborious and expensive closure procedure.
But it would for passenger services. That's what causes issues.It wouldn’t close. It’s used by many freight trains every day.
Other passenger services use it in times of disruption. If any drivers refuse to take it they can simply change ends behind CA303 then proceed towards March.But it would for passenger services. That's what causes issues.
I’m aware of the ones from Middleton Towers but not aware of much else freight wise on the Breckland and Fen lines north of Ely North junction. What other freight trains use the west curve?It wouldn’t close. It’s used by many freight trains every day.
I'm not sure how often they run but you have stuff to/from Eccles Road and to/from Trowse. Some traffic also to Lowestoft/Great Yarmouth and the odd Whitemoor turning move.I’m aware of the ones from Middleton Towers but not aware of much else freight wise on the Breckland and Fen lines north of Ely North junction. What other freight trains use the west curve?
Yes as mentioned Norwich Yard & Norwich Trowse can produce daily stone trains each along with Brandon which is also busy these days. They’ve been joined by Eccles Road & Lowestoft and now even Yarmouths Vauxhall sidings. Not sure if it’s still the case but there was some additional traffic operating from Middleton Towers.I’m aware of the ones from Middleton Towers but not aware of much else freight wise on the Breckland and Fen lines north of Ely North junction. What other freight trains use the west curve?
They don't/can't use the West Curve (they run around at Ely), but there have been some Middleton Towers to Brandon workings running for a while, usually operated by a DCR class 60.Not sure if it’s still the case but there was some additional traffic operating from Middleton Towers.
Which obligations, regulations or legislation would be being breached by diverting the existing service to Ely and maintaining the existing line at passenger standard?But it would for passenger services. That's what causes issues.
The ban on eastbound services using the curve was imposed following the Newton collision in 1991.Until around 10-15 years ago when bi directional traffic was permitted on the curve, anything from the Peterborough direction had to run-round at Ely. That restriction was imposed in 1992.
Accident at Newton (Lanark) on 21st July 1991
But that ban was lifted a while ago now. For example, this morning 4H83 March Up Yard to Middleton Towers ran via the curve:They don't/can't use the West Curve (they run around at Ely), but there have been some Middleton Towers to Brandon workings running for a while, usually operated by a DCR class 60.
4H83 0338 March Up Yard Gbrf to Middleton Towers Gbrf
Railways Act 2005.Which obligations, regulations or legislation would be being breached by diverting the existing service to Ely and maintaining the existing line at passenger standard?
But that ban was lifted a while ago now. For example, this morning 4H83 March Up Yard to Middleton Towers ran via the curve:

Why is it that this line has to have a scheduled train which provides no additional service (in fact it reduces it by cutting out a useful and well used interchange station), but not, for example, if there is no service over a fast-to-slow crossover. What is the (legal) difference?Which obligations, regulations or legislation would be being breached by diverting the existing service to Ely and maintaining the existing line at passenger standard?
But it has never been possible to use the curve to get between the Kings Lynn and Norwich lines without reversing at Ely.The Middleton Towers to/from Brandon workings don't use the curve because they are not travelling to/from the March line, not because there's a ban on using it
Under the Railways Act 2005, it would seem to fit within the definition of 'minor modifications' and is therefore excluded from the requirements of the act.Railways Act 2005.
35Closures eligible to be treated as minor modifications
(1)The discontinuance of a railway passenger service is eligible to be treated as a minor modification so far as the service is a service on a stretch of line along which there is no station (or no station in use) and the circumstances are such that—
(a)trains that would otherwise use that stretch of line in travelling between two stations will instead pass along an alternative route; and
(b)passengers travelling on such a train will not be required to make additional changes and will not incur significant increases of journey times.
It is 35 (1) b which is open to debate.Under the Railways Act 2005, it would seem to fit within the definition of 'minor modifications' and is therefore excluded from the requirements of the act.
Section 22(1)(c), 23(1)(c), 24(1)(c), 26(1)(e), 27(1)(e), 28(1)(d) all exclude minor modifications from the requirements of the closure process (S.22-24 for services, S.26-28 for passenger network. S29 & 30 cover stations and also have the same exclusion but that's not relevant here).
Section 35 defines Minor Modifications:
Railways Act 2005
An Act to amend the law relating to the provision and regulation of railway services; and for connected purposes.www.legislation.gov.uk
The Ely West curve satisfies 35(1)(a) very easily. (b) is slightly more arguable but given literally every other service runs the alternative route I think it would be satisfied.
It is the route used by every other service, so the extension is clearly not significant enough to justify running more regular direct trains.It is 35 (1) b which is open to debate.
The single train taking that route is around ten minutes quicker than those going via Ely.
Nope, it's the Sec of State:I suspect at the very least it would be up to ORR to determine whether it qualifies.
I gave the link, but horses and water....(3)It is the Secretary of State who, in any other case, may make a determination that a closure is a minor modification, or that closures of a particular description are minor modifications.
The decision would of course be subject to potential challenge. It'd be a pointless waste of everybody's money and damaging to the railway, if the case were even heard. But then again that's why the UK struggles to get anything done.And that of course would be subject to challenge in the courts.
The perverse fix for that is of course to stop the direct train on or around the curve for ten minutes, to ensure that it isn't quicker.It is 35 (1) b which is open to debate.
The single train taking that route is around ten minutes quicker than those going via Ely.
I suspect at the very least it would be up to ORR to determine whether it qualifies. And that of course would be subject to challenge in the courts.
Yes, I know - hence my posting of a track diagram, for the benefit of anyone who might be unfamiliar with the curve and its connections.But it has never been possible to use the curve to get between the Kings Lynn and Norwich lines without reversing at Ely.
I think most people would regard re-routing the 1556 Sundays only Norwich to Manchester Piccadilly to call at (and reverse at) Ely to be an overall improvement, not a degradation (the turnover of passengers on the EMR services at Ely is considerable). The connections at Ely are important to the rail system in East Anglia as a whole.It is the route used by every other service, so the extension is clearly not significant enough to justify running more regular direct trains.