Am I correct in thinking that the only passenger service to use Ely West Curve is the 1556 Sundays only Norwich to Manchester Piccadilly?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Jimcam

Member
Joined
20 Nov 2014
Messages
57
Thanks. Do you know why it does that, rather than make the stop at Ely like all other trains on that route?
 

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,585
Location
UK
It'll be to maintain route knowledge for the EMR crews. That said I'm struggling slightly to see how one instance a week is enough, even if it's only Norwich crews that sign it.

It's used during disruption to make up time by skipping the Ely reversal.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,804
Location
East Anglia
Thanks. Do you know why it does that, rather than make the stop at Ely like all other trains on that route?
I think it’s just route retention for the crews. It’s been only that train for around 20 years now. Others do occasionally traverse the curve if there is say a problem with equipment in the rear cab.
 

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,892
It'll be to maintain route knowledge for the EMR crews. That said I'm struggling slightly to see how one instance a week is enough, even if it's only Norwich crews that sign it.

It's used during disruption to make up time by skipping the Ely reversal.
It was Nottingham crews for at least 20 years, then changed to Norwich in May, prompting the usual panic to make sure they were all current on it.

In practice it's usually just refreshed on route refresh days by watching a short video. Nothing really to it!

Most crew at both depots sign it.
 

172007

Member
Joined
2 Jan 2021
Messages
1,137
Location
West Mids
It'll be to maintain route knowledge for the EMR crews. That said I'm struggling slightly to see how one instance a week is enough, even if it's only Norwich crews that sign it.

It's used during disruption to make up time by skipping the Ely reversal.
Route refresh can be done using route learning films etc.

It can be that if a depot does not have any booked work over a route the depot ceases to sign that route or part of that route so 1 train a week is there to keep the Ely West Cirve on the depot route card.
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,078
Location
Wilmslow
I did it a year ago along with @yorkie and @yorksrob in an HST, but it was a long time since I first used it when it was more regularly used in the 1970s.
 

Attachments

  • Realtime Trains | 1Z63 1534 Great Yarmouth to Wakefield Kirkgate | 30:08:2025.pdf
    277.9 KB · Views: 66
  • 26.jpeg
    26.jpeg
    3.6 MB · Views: 58
Last edited:

NSE

Established Member
Joined
3 Mar 2010
Messages
1,909
It'll be to maintain route knowledge for the EMR crews. That said I'm struggling slightly to see how one instance a week is enough, even if it's only Norwich crews that sign it.

It's used during disruption to make up time by skipping the Ely reversal.
It also means a train traverses it each week so they can check the route is good to use. It allows a crew to see if there’s any over growing foliage, dodgy rails etc. so if there’s a closure and they suddenly need to send multiple trains down there a day, they know the route is ready for it.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,804
Location
East Anglia
It also means a train traverses it each week so they can check the route is good to use. It allows a crew to see if there’s any over growing foliage, dodgy rails etc. so if there’s a closure and they suddenly need to send multiple trains down there a day, they know the route is ready for it.
Several freight trains use it every day.
 

Peterthegreat

Established Member
Joined
22 Feb 2021
Messages
1,792
Location
South Yorkshire
I suspect it is also a "closure protector".
If the service were to be withdrawn they would have to go through the rather laborious and expensive closure procedure.
 

William3000

Member
Joined
24 May 2011
Messages
596
Location
Cambridgeshire
It wouldn’t close. It’s used by many freight trains every day.
I’m aware of the ones from Middleton Towers but not aware of much else freight wise on the Breckland and Fen lines north of Ely North junction. What other freight trains use the west curve?
 

GB

Established Member
Joined
16 Nov 2008
Messages
6,551
Location
Somewhere
I’m aware of the ones from Middleton Towers but not aware of much else freight wise on the Breckland and Fen lines north of Ely North junction. What other freight trains use the west curve?
I'm not sure how often they run but you have stuff to/from Eccles Road and to/from Trowse. Some traffic also to Lowestoft/Great Yarmouth and the odd Whitemoor turning move.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,804
Location
East Anglia
I’m aware of the ones from Middleton Towers but not aware of much else freight wise on the Breckland and Fen lines north of Ely North junction. What other freight trains use the west curve?
Yes as mentioned Norwich Yard & Norwich Trowse can produce daily stone trains each along with Brandon which is also busy these days. They’ve been joined by Eccles Road & Lowestoft and now even Yarmouths Vauxhall sidings. Not sure if it’s still the case but there was some additional traffic operating from Middleton Towers.

Until around 10-15 years ago when bi directional traffic was permitted on the curve, anything from the Peterborough direction had to run-round at Ely. That restriction was imposed in 1992.
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,896
Location
Cambridge, UK
Not sure if it’s still the case but there was some additional traffic operating from Middleton Towers.
They don't/can't use the West Curve (they run around at Ely), but there have been some Middleton Towers to Brandon workings running for a while, usually operated by a DCR class 60.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,323
Location
The Fens
Until around 10-15 years ago when bi directional traffic was permitted on the curve, anything from the Peterborough direction had to run-round at Ely. That restriction was imposed in 1992.
The ban on eastbound services using the curve was imposed following the Newton collision in 1991.


Accident at Newton (Lanark) on 21st July 1991​



They don't/can't use the West Curve (they run around at Ely), but there have been some Middleton Towers to Brandon workings running for a while, usually operated by a DCR class 60.
But that ban was lifted a while ago now. For example, this morning 4H83 March Up Yard to Middleton Towers ran via the curve:


4H83 0338 March Up Yard Gbrf to Middleton Towers Gbrf
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,896
Location
Cambridge, UK
But that ban was lifted a while ago now. For example, this morning 4H83 March Up Yard to Middleton Towers ran via the curve:

The Middleton Towers to/from Brandon workings don't use the curve because they are not travelling to/from the March line, not because there's a ban on using it - below, from top to bottom on the right are the March, Kings Lynn (Middleton Towers) and Norwich (Brandon) lines. The other Middleton Towers freight workings do use it because they are travelling to/from the March line.

1788250841612.png
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,225
Which obligations, regulations or legislation would be being breached by diverting the existing service to Ely and maintaining the existing line at passenger standard?
Why is it that this line has to have a scheduled train which provides no additional service (in fact it reduces it by cutting out a useful and well used interchange station), but not, for example, if there is no service over a fast-to-slow crossover. What is the (legal) difference?
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,323
Location
The Fens
The Middleton Towers to/from Brandon workings don't use the curve because they are not travelling to/from the March line, not because there's a ban on using it
But it has never been possible to use the curve to get between the Kings Lynn and Norwich lines without reversing at Ely.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,406
Location
Northampton
Railways Act 2005.
Under the Railways Act 2005, it would seem to fit within the definition of 'minor modifications' and is therefore excluded from the requirements of the act.

Section 22(1)(c), 23(1)(c), 24(1)(c), 26(1)(e), 27(1)(e), 28(1)(d) all exclude minor modifications from the requirements of the closure process (S.22-24 for services, S.26-28 for passenger network. S29 & 30 cover stations and also have the same exclusion but that's not relevant here).

Section 35 defines Minor Modifications:

35Closures eligible to be treated as minor modifications​

(1)The discontinuance of a railway passenger service is eligible to be treated as a minor modification so far as the service is a service on a stretch of line along which there is no station (or no station in use) and the circumstances are such that—

(a)trains that would otherwise use that stretch of line in travelling between two stations will instead pass along an alternative route; and

(b)passengers travelling on such a train will not be required to make additional changes and will not incur significant increases of journey times.

The Ely West curve satisfies 35(1)(a) very easily. (b) is slightly more arguable but given literally every other service runs the alternative route I think it would be satisfied.
 

Peterthegreat

Established Member
Joined
22 Feb 2021
Messages
1,792
Location
South Yorkshire
Under the Railways Act 2005, it would seem to fit within the definition of 'minor modifications' and is therefore excluded from the requirements of the act.

Section 22(1)(c), 23(1)(c), 24(1)(c), 26(1)(e), 27(1)(e), 28(1)(d) all exclude minor modifications from the requirements of the closure process (S.22-24 for services, S.26-28 for passenger network. S29 & 30 cover stations and also have the same exclusion but that's not relevant here).

Section 35 defines Minor Modifications:


The Ely West curve satisfies 35(1)(a) very easily. (b) is slightly more arguable but given literally every other service runs the alternative route I think it would be satisfied.
It is 35 (1) b which is open to debate.
The single train taking that route is around ten minutes quicker than those going via Ely.
I suspect at the very least it would be up to ORR to determine whether it qualifies. And that of course would be subject to challenge in the courts.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,406
Location
Northampton
It is 35 (1) b which is open to debate.
The single train taking that route is around ten minutes quicker than those going via Ely.
It is the route used by every other service, so the extension is clearly not significant enough to justify running more regular direct trains.
I suspect at the very least it would be up to ORR to determine whether it qualifies.
Nope, it's the Sec of State:
(3)It is the Secretary of State who, in any other case, may make a determination that a closure is a minor modification, or that closures of a particular description are minor modifications.
I gave the link, but horses and water....
And that of course would be subject to challenge in the courts.
The decision would of course be subject to potential challenge. It'd be a pointless waste of everybody's money and damaging to the railway, if the case were even heard. But then again that's why the UK struggles to get anything done.
 

Tester

Established Member
Joined
5 Jul 2020
Messages
1,660
Location
Watford
It is 35 (1) b which is open to debate.
The single train taking that route is around ten minutes quicker than those going via Ely.
I suspect at the very least it would be up to ORR to determine whether it qualifies. And that of course would be subject to challenge in the courts.
The perverse fix for that is of course to stop the direct train on or around the curve for ten minutes, to ensure that it isn't quicker.

I despair!
 