There is that, however what has compounded the GWR fleet is the need to cycle one or two units through Wolverton for overhaul, whilst also having to cover for everything else in the GWR fleet (except the 387s). There’s no denying the GW 150s have been worked hard since about 2007.

There’s a new thread below for discussing the various options.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,731
Location
Newport
Wonder what the threshold is for Oakhampton and Cornwall to trigger these

Neither is expected to get above 26c today, being a long way from the hot South East and East.

Needing a KRS at only 26c seems a bit feeble
Possibly not the air temperature but maybe the amount of energy absorbed by assets following days of raised temperatures and the absence of cool nights has meant it’s not been possible to cool down by releasing some of that energy back into the air, so potentially starting the day with everything already running hot and about to bake some more.

It’s also not about Okehampton triggering anything but about resourcing the highest priority point ends, and putting low priorities in a fixed state.
 

REVUpminster

Established Member
Joined
3 Jan 2021
Messages
1,223
Location
Paignton
"Running round empty" implies that they're training runs. The 175s have been on a lot of training runs, it seems?
003 started on 2C05 and had a reasonably successful run from Exeter and back to Penzance. Then training.

and again from the same site as before;

Jonathan Webb (Chime Publishing) tweeting that the RMT▸ are balloting for potential industrial action over the failing 175s
 

XFeed

Member
Joined
25 Nov 2025
Messages
268
Location
Chester
I think the short story is, uncared for at the end of their time with TfW, then left stored to rot in the open before transfer, units taking longer than expected to be seen to at Wolverton and then goodness knows what else once they actually get to Laira!

I have to disagree with the highlighted statement and I have previously conceded that certain things may have slipped slightly as more 197s arrived but they continued to be maintained as can be seen in this picture with the CAF signage now on the building after the Alstom signage was finally removed.

Availability looks like it was on target on this day 24/27 units in service with 3 units in the shed for maintenance and 1 unit spare on the left hand side.
 

Attachments

  • Rear of depot 175-CAF.jpg
    Rear of depot 175-CAF.jpg
    894.3 KB · Views: 220

RPI

Established Member
Joined
6 Dec 2010
Messages
3,325
Looks like only 003 out today in passenger service, the latest internal newsletter had the attached comments from Mr Hopwood regarding these units.
Whilst an internal document, it isn't anything top secret or anything - it gets posted everywhere.
 

Attachments

  • PXL_20260813_085118804~2.jpg
    PXL_20260813_085118804~2.jpg
    4 MB · Views: 396

REVUpminster

Established Member
Joined
3 Jan 2021
Messages
1,223
Location
Paignton
I have brought forward BillStampy table highlighting how long GWR have had each train What have the engineers been doing?

175001 Laira (Wolverton arrival: April 3, 2025, Wolverton Departure: November 5, 2025)
175002 Laira (Straight from Ely, no Wolverton) 27 November 2024
175003 Laira (Wolverton arrival: March 3, 2025, Wolverton Departure: September 18, 2025)
175004 Exeter TMD (Wolverton Arrival: January 30, 2026) (Wolverton Departure: June 23rd, 2026)
175005 Wolverton (Wolverton Arrival: July 1st, 2026) by road
175006 Laira (Wolverton arrival: April 23, 2025, Wolverton Departure: December 10, 2025)
175007 Laira (Straight from Ely, no Wolverton) 28 February 2025
175009 Laira (Straight from Ely, no Wolverton) 27 January 2025
175010 Penzance T.R.S.M.D. (Straight from Ely, no Wolverton) 13 January 2026 post 2085
175011 Laira (Wolverton arrival: April 23, 2025, Wolverton Departure: December 10, 2025)
175101 Laira (Wolverton Arrival: July 10, 2025, Wolverton Departure: January 23 2026)
175102 Wolverton (Wolverton arrival: October 30, 2025)
175103 Wolverton (Wolverton arrival: March 27, 2026)
175104 Ely Mlf Papworth Sidings
175105 Wolverton (Wolverton Arrival: March 27, 2026)
175106 Wolverton (Wolverton Arrival: July 24, 2025)
175107 Wolverton (Wolverton Arrival: March 19, 2025)
175108 Wolverton (Wolverton Arrival: March 19, 2025)
175109 Wolverton (Wolverton Arrival: April 16, 2026)
175110 Wolverton (Wolverton Arrival: January 30, 2026)
175111 Laira (Wolverton Arrival: October 9, 2025, Wolverton Departure: March 20, 2026)
175112 Laira (Wolverton Arrival: July 24, 2025, Wolverton departure: February 20, 2026)
175113 Laira (Wolverton Arrival: July 10, 2025, Wolverton departure: May 15, 2026)
175114 Laira (Straight from Ely, no Wolverton) 5 December 2024
175115 Laira (Wolverton Arrival: October 9, 2025, Wolverton departure: April 13, 2026)
175116 Laira (Wolverton Arrival: October 30, 2025, Wolverton departure: May 28, 2026)

I've copy pasted and added in bold. Created by BillStampy

== Doublepost prevention - post automatically merged: ==

175s same as yesterday. Have to wait and see if 003 does training later in the day. Priority seems to be training Exeter drivers; maybe for end of August?
All branches working today (two main line cancellations that used to be 175) with reduced capacity at Paignton (one 2car 150 on three diagrams). Since the fire at Paignton, 5 car voyages have been in passenger service but todays 5 car IET from Paddington is still scheduled to empty at Torquay and go to Goodrington to reverse. It's on time so may change.
 
Last edited:

CR165022

Established Member
Joined
12 Nov 2019
Messages
1,353
Location
Buckinghamshire
Since the fire at Paignton, 5 car voyages have been in passenger service but todays 5 car IET from Paddington is still scheduled to empty at Torquay and go to Goodrington to reverse. It's on time so may change.
It's a 9 car service short formed to 5, so the ECS moves between Torquay still have to happen regardless of whether a 5 can fit at Paignton or not
 
Joined
8 Jun 2026
Messages
130
Location
Somerset
Why does it have to happen regardless?
The station calls will have been put into all the systems as if it were a 9 car, so with no call at Paignton. It still has to go through Paignton, even if empty, in order to turn around as there is no crossover between the Newton Abbot Jn and Paignton.
 
Last edited:

CR165022

Established Member
Joined
12 Nov 2019
Messages
1,353
Location
Buckinghamshire
Although I must say anyway, I am a bit confused as to why inbound services from London can't run all the way to Paignton in service anyway, as Platform 1 there is fully open to services
 

Apedlar12

Member
Joined
13 Apr 2017
Messages
815
Although I must say anyway, I am a bit confused as to why inbound services from London can't run all the way to Paignton in service anyway, as Platform 1 there is fully open to services
Exactly what I was thinking when I was there last weekend.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,722
Although I must say anyway, I am a bit confused as to why inbound services from London can't run all the way to Paignton in service anyway, as Platform 1 there is fully open to services
And why can't up services from Platform 2 use SDO to only open the relevant doors? I rather suspect the answer is it's all too much like hard work for a railway that has long since given up any idea of customer service.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,731
Location
Newport
Although I must say anyway, I am a bit confused as to why inbound services from London can't run all the way to Paignton in service anyway, as Platform 1 there is fully open to services
I would guess that a careful risk assessment is behind that? Perhaps there is some limitation on the station which means that a gradual ingress to load a train can be managed but that a full instant trainload egress cannot?
 

Ashley Hill

Established Member
Joined
8 Dec 2019
Messages
5,565
Location
The West Country
And why can't up services from Platform 2 use SDO to only open the relevant doors? I rather suspect the answer is it's all too much like hard work for a railway that has long since given up any idea of customer service.
The door selection would need to be manually overridden by the driver via the Train Management System. But there are probably other reasons too.
 

REVUpminster

Established Member
Joined
3 Jan 2021
Messages
1,223
Location
Paignton
Can only find 175003 out today on Newquay diagram.

== Doublepost prevention - post automatically merged: ==

Exactly what I was thinking when I was there last weekend.
9 car 1T69 Plymouth-Paignton did stop and let passengers off at Paignton. Station staff said it's done now, but not the return pick up on platform 2.
 
Last edited:

irish_rail

On Moderation
Joined
30 Oct 2013
Messages
4,506
Location
Plymouth
Can only find 175003 out today on Newquay diagram.
And rumour has it that no more drivers are to be trained on 175s once those currently on courses are finished (at Plymouth anyway, unsure if this applies to all depots). This is totally at odds with what we where told a couple of weeks ago, and so does beg the question are GWR now realising the 175s are a dead duck and looking at alternatives? I haven't seen morale so bad for quite some time, and 175s are playing a big part in that......
 

northernbelle

Member
Joined
10 Oct 2018
Messages
768
And why can't up services from Platform 2 use SDO to only open the relevant doors? I rather suspect the answer is it's all too much like hard work for a railway that has long since given up any idea of customer service.
The collective industry has done very well to get things back up and running as quickly as it has.

The fact that you're not privy to the detail around why things are how they are doesn't mean that people have 'given up'.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,722
The fact that you're not privy to the detail around why things are how they are doesn't mean that people have 'given up'.
Given that more than one charter operator has managed a method of working to arrive and depart from Paignton with “long” trains, it clearly can be done.

Too much “can’t do” attitude on the DfT-funded railway.
 

CR165022

Established Member
Joined
12 Nov 2019
Messages
1,353
Location
Buckinghamshire
And why can't up services from Platform 2 use SDO to only open the relevant doors? I rather suspect the answer is it's all too much like hard work for a railway that has long since given up any idea of customer service.
In fairness, a 9 car 802 stopping on the half of the platform that is available would overhang onto the level crossing towards Goodrington.
 

BillStampy

Established Member
Joined
6 Jan 2024
Messages
1,573
Location
Llanharan
Back to the focus on the 175s
175003 seems to have had a successful day today with a cancellation of one return trip being cancelled seemingly due to the late running PAD - NQY as a result of a safety inspection of the track, which if 003 had followed up the branch would've delayed everything.

Hopefully we'll see some more of the fleet return from repair soon and hopefully they'll be performing as they should, I know the teams at Laira will be trying their hardest as I do not doubt their abilities at all, they're a great team.
 

RPI

Established Member
Joined
6 Dec 2010
Messages
3,325
Back to the focus on the 175s
175003 seems to have had a successful day today with a cancellation of one return trip being cancelled seemingly due to the late running PAD - NQY as a result of a safety inspection of the track, which if 003 had followed up the branch would've delayed everything.

Hopefully we'll see some more of the fleet return from repair soon and hopefully they'll be performing as they should, I know the teams at Laira will be trying their hardest as I do not doubt their abilities at all, they're a great team.
As you say, the cancellation wasn't related to 175 reliability, though sods law it ended up being the 175 worked trip to suffer!
 

Mollman

Established Member
Joined
21 Sep 2016
Messages
1,697
Location
Preston
And rumour has it that no more drivers are to be trained on 175s once those currently on courses are finished (at Plymouth anyway, unsure if this applies to all depots). This is totally at odds with what we where told a couple of weeks ago, and so does beg the question are GWR now realising the 175s are a dead duck and looking at alternatives? I haven't seen morale so bad for quite some time, and 175s are playing a big part in that......
I would take that with a pinch of salt. Unless GWR have done a deal to take TfW's 158s which should be coming free over the next 6 months or so.

It might be that they are pausing driver training until the 175s are more reliable.
 

BillStampy

Established Member
Joined
6 Jan 2024
Messages
1,573
Location
Llanharan
Unless GWR have done a deal to take TfW's 158s which should be coming free over the next 6 months or so.
That's assuming none of the other 158 operators are trying to snap them up too, plus depending on how fast the 197 rollout happens on the Cambrian line to displace the units in the first place which I think was recently pushed back a few weeks again but I could be mistaken.

One thing we should wait to see is how many units are sent out tomorrow, if it's not many then that's not really a good sign at all.
 

REVUpminster

Established Member
Joined
3 Jan 2021
Messages
1,223
Location
Paignton
Something must come out of Wolverton this week; fourth attempt. Mark Hopgood said in the Radio Cornwall interview, the next trains will be ready to roll. There are nine at Wolverton. If they are ready to roll it would make a big dent in availability.

I don't know to what degree the 16 trains GWR have, have been cannibalised to get the four or five trains currently running.
 