Class 175s to GWR

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,377
Location
Taunton or Kent
It was stated on a Facebook group that none are out today. I can't find that post again now. Could the heat be making these trains less reliable?

And I save the day again! :p
The 175 introduction into service has coincided with the hottest summer on record so, while faults will still have occurred, this must be exacerbating the problem. We'll know for sure if by autumn the situation has somewhat improved.
 

RPI

Established Member
Joined
6 Dec 2010
Messages
3,325
It was stated on a Facebook group that none are out today. I can't find that post again now. Could the heat be making these trains less reliable?

And I save the day again! :p
Haha, sadly though it's meant at least two unplanned short forms on the Exmouth-Paignton circuit
 

Class172

Established Member
Associate Staff
Quizmaster
Joined
20 Mar 2011
Messages
3,887
Location
West Country
The 175 introduction into service has coincided with the hottest summer on record so, while faults will still have occurred, this must be exacerbating the problem. We'll know for sure if by autumn the situation has somewhat improved.
You might be ridding one problem in favour of another, namely leaf fall!
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
You might be ridding one problem in favour of another, namely leaf fall!
Yes going to look rather silly if don't work in summer, and don't work properly in autumn too

Anyone want to put a bet on if they leak when it rains, or get condensation and steamed up windows when cool and damp. Or will not like Okehampton line when it snows and is icy on Dartmoor.

Surely they should be fixed to deal with UK weather, hot, cold, wet, dry etc.
 

Jrocks

Member
Joined
27 Apr 2021
Messages
162
Location
Torbay
must be why some Bristol-Oxford have been cancelled
stole the 5car IETs to cover elsewhere, as chain reaction because 175s aren't usable
Bristol Oxfords are cancelled because of an unrelated IET shortage! Luckily (or unluckily) these Oxford cancellations are nothing to do with the 175s.

And whilst we are on the topic of failures, 150249 has now 'failed' on 2E11 whilst trying to do its best 175 impression - unit overheating
 

REVUpminster

Established Member
Joined
3 Jan 2021
Messages
1,223
Location
Paignton
158 now packed up. 1616 Exeter-Barnstaple. 2 hour gap.
1618 Newquay- Par
1618 St Ives-Par-St Ives.

1900hrs end of the world?
 
Last edited:

The exile

Established Member
Joined
31 Mar 2010
Messages
9,305
Location
Somerset
Surely they should be fixed to deal with UK weather, hot, cold, wet, dry etc.
What we’ve been experiencing over the last 7 weeks or so would not have been recognised as “ UK weather” that one had to plan for until very recently. In the same way, I doubt much is designed to cope with frequent repetitions of the October 1987 or January 1990 winds.
 

irish_rail

On Moderation
Joined
30 Oct 2013
Messages
4,506
Location
Plymouth
It would be rather disgraceful if the GWR staff were intentionally failing the units given any opportunity and I would be disappointed if that was the case.

If GWR gave stopped the fleet to investigate then I'd give them as much time as required and also hope they're getting help from Alstom!
Well you can be sure GWR drivers are most certainly not failing these for the fun of it. They are being failed with genuine problems. Some may not realise this, but the appalling performance of the 175s has had a really negative effect on some GWR crews. I've spoken to a couple of drivers lately who say the 175s are adversely affecting their mental health due to fear of having to work them, knowing failure is likely. I'm absolutely dreading learning them this autumn.......
 

REVUpminster

Established Member
Joined
3 Jan 2021
Messages
1,223
Location
Paignton
From another site.

"RMT▸ (National Union of Rail, Maritime & Transport Workers) are moving into dispute with GWR over a breach of Health and Safety regarding 175s."

Anybody know if it's true?
 
Joined
8 Jun 2026
Messages
130
Location
Somerset
For today, KRS implementation means no trains to Okehampton so presumably more Sprinters could be deployed to cover 175 trains today if needed?
 

REVUpminster

Established Member
Joined
3 Jan 2021
Messages
1,223
Location
Paignton
For today, KRS implementation means no trains to Okehampton so presumably more Sprinters could be deployed to cover 175 trains today if needed?
I think it's to do with track. No service to Okehampton, yet all the connecting buses operating. Hourly at Falmouth. Two hourly at Newquay. IETs covering 175s. That put the capacity figures up. GWR is a disaster or demob (denationalisation) happy.
 

DelW

Established Member
Joined
15 Jan 2015
Messages
5,934
For today, KRS implementation means no trains to Okehampton so presumably more Sprinters could be deployed to cover 175 trains today if needed?
KRS? Google suggests connection with hip-hop or Polish logistics, neither of which seems relevant ...
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,731
Location
Newport
KRS? Google suggests connection with hip-hop or Polish logistics, neither of which seems relevant ...
Key Route Strategy.

Deciding which point ends to keep operational and which to leave set unused and in what position so that the operational ends can be kept operational.

Normally a deep winter/snow requirement.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,305
Location
Somerset
Key Route Strategy.

Deciding which point ends to keep operational and which to leave set unused and in what position so that the operational ends can be kept operational.

Normally a deep winter/snow requirement.
Which is possibly one reason why Okehampton draws the short straw.
 

RPI

Established Member
Joined
6 Dec 2010
Messages
3,325
I think it's to do with track. No service to Okehampton, yet all the connecting buses operating. Hourly at Falmouth. Two hourly at Newquay. IETs covering 175s. That put the capacity figures up. GWR is a disaster or demob (denationalisation) happy.
Not sure how Nationalisation comes into it, it'll still be the same staff, management and trains after 13th December as it is now.
 

DelW

Established Member
Joined
15 Jan 2015
Messages
5,934
Key Route Strategy.

Deciding which point ends to keep operational and which to leave set unused and in what position so that the operational ends can be kept operational.

Normally a deep winter/snow requirement.
Thanks, noted.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
Key Route Strategy.

Deciding which point ends to keep operational and which to leave set unused and in what position so that the operational ends can be kept operational.

Normally a deep winter/snow requirement.
Wonder what the threshold is for Oakhampton and Cornwall to trigger these

Neither is expected to get above 26c today, being a long way from the hot South East and East.

Needing a KRS at only 26c seems a bit feeble
 

Bayum

Established Member
Joined
21 Mar 2008
Messages
3,268
Location
Leeds
What is the story behind their reliability? Was it already decreasing whilst they were with TfW or is it the move to a new depot and the staff being relatively unskilled with this particular class?
 
Joined
8 Jun 2026
Messages
130
Location
Somerset
What is the story behind their reliability? Was it already decreasing whilst they were with TfW or is it the move to a new depot and the staff being relatively unskilled with this particular class?
I think the short story is, uncared for at the end of their time with TfW, then left stored to rot in the open before transfer, units taking longer than expected to be seen to at Wolverton and then goodness knows what else once they actually get to Laira!
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,608
Location
Hampshire
I think the short story is, uncared for at the end of their time with TfW, then left stored to rot in the open before transfer, units taking longer than expected to be seen to at Wolverton and then goodness knows what else once they actually get to Laira!
Coupled with their somewhat finicky nature and the loss of their home dedicated depot hasn’t helped. It took Alsthom several years to get them to settle down, before the transfer of the depot to CAF (it’s always a recipe for disaster when another manufacturer if bought in to maintain someone else’s fleet… see; Hitachi). Alstom is supposed to be assisting GWR however but it’s another fleet for Laira to get their heads around. Of course had OOC remained… they knew their bigger brothers inside out.

== Doublepost prevention - post automatically merged: ==

Much as I'd like to see the stored 150s put through Wolverton and added to the GWR fleet to create a bit of slack, it wouldn't help with the immediate problem. As far as I can see, the only short-term solution would be to short-term hire some 150 or 158 units from another TOC with spare capacity - if such an animal exists!
There is that, however what has compounded the GWR fleet is the need to cycle one or two units through Wolverton for overhaul, whilst also having to cover for everything else in the GWR fleet (except the 387s). There’s no denying the GW 150s have been worked hard since about 2007.
 