• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Class 350/2s to replace 323s on Northern

scosutsut

Established Member
Joined
1 Jan 2019
Messages
1,217
Location
scosutsut
For the benefit of forum members, I have quoted the article in question:

The investment comes from Siemens, which built the trains, and Porterbrook which owns them.
Is it normal for the original builder of the train to contribute to the refurbishment of a second hand unit?

Or is is this because the Siemens Desiro Verve is likely to be on Northern's candidate list for its upcoming orders?

Or am I being overly sceptical?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
Is it normal for the original builder of the train to contribute to the refurbishment of a second hand unit?

Or is is this because the Siemens Desiro Verve is likely to be on Northern's candidate list for its upcoming orders?

Or am I being overly sceptical?
No not sceptical, more commercial common sense.

350s were built by Siemens, they have a manufacturing plant at Goole that needs orders. Per recent TfL Board minutes, looks like 36 trains for Bakerloo will follow Piccadilly line order (appears to be almost done deal). But the extra Piccadilly trains (for raise from 27 to 36 trains per hour and Bakerloo Lewisham extension could be decade away (if they ever happen). So plant needs big Desiro Verve orders to use capacity from about 2030

And of course they will want to keep Northern (and DfT etc) happy, but spending bit of money to help secure hundreds of millions of orders is reasonable, call it promotion and marketing costs if you like, is clearly deemed commercially worthwhile. And of course if Siemens contribute to refitting 350/2, parts from their group are likely to be used which opens up chance of selling lucrative spare parts
 

Ju135

Member
Joined
21 Feb 2013
Messages
19
A 323 can hit 90mph in 100s on flat track, so I wonder how that compares with a 350. I’d imagine a 323’s better acceleration, but a 350’s higher top speed, would give both equal performance on Man Airport - Blackpool / Man - Crewe/Stoke. But, as you suggest, a 323’s performance is better suited for stop, start work. Either way, the lack of available spares takes priority here.
323s are only quick up to about 60mph so are great on the Liverpool to Wigan stoppers due to the brilliant braking capabilities especially with the Double Variable Rate Sanders during leaf fall. They take a lot longer to go from 60-90mph and can never keep to time on Blackpool-Airport runs especially on the higher speed sections between Chorley and Salford Crescent. Besides the excessive wind noise from the failing vacuum door seals mean many drivers don't go above 75mph as hearing the AWS warnings and vigilance is difficult.
 

RUK

Member
Joined
5 Aug 2009
Messages
401
Location
East of England
Or is this because the Siemens Desiro Verve is likely to be on Northern's candidate list for its upcoming orders?
I suppose any new systems which they have to develop for retro-fitting to the 350/2s could also be used for the Desiro Verve, so they’d be doing design work which they’d have to do anyway, and can re-use.
 

Laurencemcd

Member
Joined
4 Mar 2018
Messages
15
323s are only quick up to about 60mph so are great on the Liverpool to Wigan stoppers due to the brilliant braking capabilities especially with the Double Variable Rate Sanders during leaf fall. They take a lot longer to go from 60-90mph and can never keep to time on Blackpool-Airport runs especially on the higher speed sections between Chorley and Salford Crescent. Besides the excessive wind noise from the failing vacuum door seals mean many drivers don't go above 75mph as hearing the AWS warnings and vigilance is difficult.
Interesting. Any unit I’ve ridden between Preston and Manchester has definitely hit 90mph where capable and kept time just fine, usually arriving at Salford with a few minutes to spare. As you say, it must be driver preference. 350s are built like tanks so getting rid of any disturbance from the cab door will be a massive bonus for drivers.
 

lowe1409

Member
Joined
6 Feb 2024
Messages
221
Location
Cheshire
More generally if going to run double 350s, really need platforms and sidings that are 164m minimum, or more practically 170m to give bit of stopping variation, for comparison:
I know theres definitely issues at Salford Cresent and deansgate with platform lengths. Which will definitely be costly fixes and Cresent will even struggle with SDO. What other stations would be problematic?
 

Liam L

Established Member
Joined
19 Jun 2020
Messages
1,415
Location
Birmingham
Interesting. Any unit I’ve ridden between Preston and Manchester has definitely hit 90mph where capable and kept time just fine, usually arriving at Salford with a few minutes to spare. As you say, it must be driver preference. 350s are built like tanks so getting rid of any disturbance from the cab door will be a massive bonus for drivers.
I think it depends on the unit and the driver. I remember when they was here in the west midlands and got up past 70mph between Longbridge & Bromsgrove the wind noises were terrible if you were sat behind a cab.
 

Laurencemcd

Member
Joined
4 Mar 2018
Messages
15
I think it depends on the unit and the driver. I remember when they was here in the west midlands and got up past 70mph between Longbridge & Bromsgrove the wind noises were terrible if you were sat behind a cab.
Drivers must’ve been thankful for the 75mph TSR at Barnt Green then. Although, I remember a few fun rides where line speed was achieved before slowing down to cross the junction haha
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,379
Location
Taunton or Kent
Is there anywhere a 350/2 might be able to reach 110mph on current 323 and 331 routes, including factoring in calling patterns?
 

Minicheddar

Member
Joined
19 Jul 2021
Messages
23
Location
Manchester
Is there anywhere a 350/2 might be able to reach 110mph on current 323 and 331 routes, including factoring in calling patterns
Should be able to do it between Macclesfield and Congleton and Alderley Edge and Holmes Chapel ( when skipping Chelford and Goostrey ).
 

physics34

Established Member
Joined
1 Dec 2013
Messages
4,080
Thats a shame, the 323s still seem quite modern to me.. guess the gubbins that power the things are life expired/expensive to run. Cant imagine corrosion being a problem.

I wanted the 350s to go to GWR to push their 387s to Southern allowing SE to keep its 377s but the DfT didnt want to listen to me ;)
 

xotGD

Established Member
Joined
4 Feb 2017
Messages
7,803
Following a recent visit to Shipley, I saw many 6 car 331 workings, and all of them had plenty of spare seats, even at peak time.

Six is generous, but when we are short formed with a three, it gets cosy.

I was happier when we had the 4-car 331s, as there was no chance of a short form.* But please don't send us 350s, we have to put up with 3+2 seating on the 333s already.

*Except when a 2-car 158 turns up instead of a 3 or 4.
 

amahy

Member
Joined
9 Dec 2024
Messages
497
Location
West Dunbartonshire
Six is generous, but when we are short formed with a three, it gets cosy.

I was happier when we had the 4-car 331s, as there was no chance of a short form.* But please don't send us 350s, we have to put up with 3+2 seating on the 333s already.

*Except when a 2-car 158 turns up instead of a 3 or 4.
I agree. The 331/1s would probably make more sense from a staff training point of view, as it would save both west and east side crews having to learn the 350/2s, as well as maintenance staff.

I do think that having a mix of 3 and 4 car EMUs on the east side is a little over complicated, just for the case of a few people at peak time not having to stand!
 

Iskra

Established Member
Joined
11 Jun 2014
Messages
10,663
Location
West Riding
I agree. The 331/1s would probably make more sense from a staff training point of view, as it would save both west and east side crews having to learn the 350/2s, as well as maintenance staff.

I do think that having a mix of 3 and 4 car EMUs on the east side is a little over complicated, just for the case of a few people at peak time not having to stand!
The 3 Carriage 331's get absolutely wedged at peak time and on weekends out of Leeds. It's not a case of a few people having to stand, but crush loading and/or people being physically unable to board. That's why replacing 3-car 331's on any diagrams they operate singly, with 350's would make a lot of sense.
 

amahy

Member
Joined
9 Dec 2024
Messages
497
Location
West Dunbartonshire
The 3 Carriage 331's get absolutely wedged at peak time and on weekends out of Leeds. It's not a case of a few people having to stand, but crush loading and/or people being physically unable to board. That's why replacing 3-car 331's on any diagrams they operate singly, with 350's would make a lot of sense.
This is exactly what I mean. Just have all Airedale and Wharfedale, as well as Leeds to Doncaster diagrams as 4 car trains and everyone is happy.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,609
Location
Hampshire
Thats a shame, the 323s still seem quite modern to me.. guess the gubbins that power the things are life expired/expensive to run. Cant imagine corrosion being a problem.

I wanted the 350s to go to GWR to push their 387s to Southern allowing SE to keep its 377s but the DfT didnt want to listen to me ;)
I wanted them to get the battery proposals sorted out and get ScotRail to grab them for the Fife Circle :lol:

Failing that, a common sense approach of working with WMT & Angel, refurbish and keep the 350/2s on the WCML, send the 350/1s to SWR and make use of them around here… but sadly neither of those are happening. But at least they’re finding a use up there.

Regarding a comment earlier - it’s good to see Siemens involved with them. They do have a rather good Manufacturer > Operator relationship and aside from the 360/1s which were repainted by Arlington at Eastleigh, have conducted all the refurbishments and modifications largely in house for the Desiro UK fleets. The next question then is, will these see maintenance at Ardwick or Longsight?
 

Northern150

Member
Joined
26 Jan 2026
Messages
9
Location
Stockport
Not seen anyone talk about this but I am pretty sure the 323s were originally meant to be replaced by Northern's new stock order in the 2030s, are the 350s still going to meet that fate or are they going to be kept long term now considering they still have alot of life in them?
 

Iskra

Established Member
Joined
11 Jun 2014
Messages
10,663
Location
West Riding
This is exactly what I mean. Just have all Airedale and Wharfedale, as well as Leeds to Doncaster diagrams as 4 car trains and everyone is happy.
I still think 6 carriages are going to be needed on peak workings. The morning commuter 333's into Leeds off the Doncaster line are pretty full now, and I imagine the same is true on the Airedale/Wharfedale corridor too. It's probably worth keeping some 331's on the East side just to keep crew competency too.
 

lowe1409

Member
Joined
6 Feb 2024
Messages
221
Location
Cheshire
Not seen anyone talk about this but I am pretty sure the 323s were originally meant to be replaced by Northern's new stock order in the 2030s, are the 350s still going to meet that fate or are they going to be kept long term now considering they still have alot of life in them?
I'd like to see them stay and for northern to look at services which could have capacity/frequency increases once the new fleet is introduced
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,015
Location
West Wiltshire
Not seen anyone talk about this but I am pretty sure the 323s were originally meant to be replaced by Northern's new stock order in the 2030s, are the 350s still going to meet that fate or are they going to be kept long term now considering they still have alot of life in them?
No one knows yet, there is a possibility they will be replaced at tail end of many massive orders for Northern.

However there are plenty of examples of older EMUs working just peak hour extras on services on selected routes in their twilight years (eg 305s working Chingford peak hour services for about decade after 315s generally took over, or 309s working Manchester - Crewe/Stoke in 1990s etc. So at this stage can't rule out them being used somewhere for few years in decades time.

My gut feel is 350s (and 450s ) are built solidly and are likely to be around until mid 2040s
 

Iskra

Established Member
Joined
11 Jun 2014
Messages
10,663
Location
West Riding
Not seen anyone talk about this but I am pretty sure the 323s were originally meant to be replaced by Northern's new stock order in the 2030s, are the 350s still going to meet that fate or are they going to be kept long term now considering they still have alot of life in them?
It's going to be interesting to see what happens now. Northern is going to need additional EMU's for newly electrified routes too.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,143
Location
Bolton
Should be able to do it between Macclesfield and Congleton and Alderley Edge and Holmes Chapel ( when skipping Chelford and Goostrey ).
That won't be a Northern service any more, so nearly all Northern trains to Crewe will serve all stations from Wilmslow.
I'd like to see them stay and for northern to look at services which could have capacity/frequency increases once the new fleet is introduced
There is no chance of any 323s staying on if all of the 350s are accepted. Even with some 331s moving to Yorkshire and all of the 323s leaving for scrap there is hardly enough stabling space for the 350s.
As an alternative for Chat Moss, could the Victoria to Liverpool stopper become hourly all day, combining with the Airport to Liverpool to make a 2tph all stops service between Manchester and Liverpool? Both routes would be operated by either 331/1s or 350/2s, giving an uplift in capacity of 2 coaches per hour.
No. Eventually that space will be used up serving Golborne.
 
Last edited:

Mamorin

Member
Joined
21 Sep 2020
Messages
469
Location
Cheshire
It's going to be interesting to see what happens now. Northern is going to need additional EMU's for newly electrified routes too.
In the Modern Railways article Northern say that the new fleet order is unaffected by the 350/2s replacing the 323s.

So in the words of former PM Theresa May "Nothing has changed" regarding the new fleet.

My guess is the 350/2s will be replaced by the 382s in the 2030s, so the 350/2s should have close to say 10 years with Northern.

The close to say 10 years is taking into account getting the order paperwork completed, units built, and any delayed entry into service for the 382s.

Only weird thing will be South Manchester going from 4 car trains back to 3 car trains in the 2030s.
 

amahy

Member
Joined
9 Dec 2024
Messages
497
Location
West Dunbartonshire
I still think 6 carriages are going to be needed on peak workings. The morning commuter 333's into Leeds off the Doncaster line are pretty full now, and I imagine the same is true on the Airedale/Wharfedale corridor too. It's probably worth keeping some 331's on the East side just to keep crew competency too.
Eventually, yes, 6 cars on these services should be the long term goal. But there is no way that 6 cars on east side EMU services should be prioritised over 6 cars on the Airport to Liverpool and Blackpool routes, which are prone to serious overcrowding as 4 cars.
 

507 001

Established Member
Joined
3 Dec 2008
Messages
2,173
Location
Huyton
As an alternative for Chat Moss, could the Victoria to Liverpool stopper become hourly all day, combining with the Airport to Liverpool to make a 2tph all stops service between Manchester and Liverpool? Both routes would be operated by either 331/1s or 350/2s, giving an uplift in capacity of 2 coaches per hour.

That’s what I’d hope for, but it entirely depends on whether the paths are available, especially if the LNR Crewe service extension to Vic is going ahead?

Thats a shame, the 323s still seem quite modern to me.. guess the gubbins that power the things are life expired/expensive to run. Cant imagine corrosion being a problem.

They’re great units, but they are feeling increasingly decrepit. The ex WMT ones in particular all smell of wet dog, but theyre all suffering from things like blown windows and knackered seats. I hear spare parts are hard to come by too.

The absolutely woeful trainFX PIS system really enhances the decrepit feeling too…
 

Liam L

Established Member
Joined
19 Jun 2020
Messages
1,415
Location
Birmingham
They’re great units, but they are feeling increasingly decrepit. The ex WMT ones in particular all smell of wet dog, but theyre all suffering from things like blown windows and knackered seats. I hear spare parts are hard to come by too.

The absolutely woeful trainFX PIS system really enhances the decrepit feeling too…
4 units currently out awaiting transformers apparently which are hard to come by, 243 was out for nearly a year awaiting one.

The Ex WMT ones didn't really get a full refurb like the Northern ones did, Just some paint on the grab bars, New Light bars, new seat covers and toilets. Everything else was left the same.
 

507 001

Established Member
Joined
3 Dec 2008
Messages
2,173
Location
Huyton
4 units currently out awaiting transformers apparently which are hard to come by, 243 was out for nearly a year awaiting one.

The Ex WMT ones didn't really get a full refurb like the Northern ones did, Just some paint on the grab bars, New Light bars, new seat covers and toilets. Everything else was left the same.

Even the northern ones feel rough though, only marginally better than the WMT ones, refurb or no.
 

lowe1409

Member
Joined
6 Feb 2024
Messages
221
Location
Cheshire
There is no chance of any 323s staying on if all of the 350s are accepted. Even with some 331s moving to Yorkshire and all of the 323s leaving for scrap there is hardly enough stabling space for the 350s.
As much as I like the 323s, their time has sadly come to go. I was referring to the 350s being kept after the future fleet replacement as the units have a potential 20 more years left in them at least. by the time any new fleet has come about, that gives 10 years or so to figure out the stabling problem.
 

317 forever

Established Member
Joined
21 Aug 2010
Messages
3,260
Location
North West
As it stands, most if not all of them do run as 6 car. It's a rarity to see 4 cars in the week on them now.
Maybe most of them. On Saturday November 15th I boarded a 3 car example at Eccles. There had admittedly been the storm the night before.
 

Top