All lines? Must be something OLE related then.It's all blocked from Bradley Jn to Dewsbury East Jn so must be something pretty major.
Edit - trackwork, as per post 10,530 above mine!
All lines? Must be something OLE related then.It's all blocked from Bradley Jn to Dewsbury East Jn so must be something pretty major.
For reasons that are pretty obvious to anyone who has seen The Pennines, trains crossing them don't follow the same route as crows. The railway route is about 15–20% longer than a straight line would be, so the actual platform-to-platform average speed between Leeds and Man Vic will be considerably higher than 60mph. Even on the current arrangements and at quiet times of day, the train is typically a comparable time to driving, and for much of the time is already quicker even before cutting 10 minutes off the journey. Without boring a new tunnel in a straight line right under the hills, you're going to struggle to get journey times down much more.Still pretty feeble in my opinion. Leeds to Manchester is 40 miles as the crow flies, so that is an average speed of less than 60mph.
There is so much that could be done to remove slow turnout speeds.For reasons that are pretty obvious to anyone who has seen The Pennines, trains crossing them don't follow the same route as crows. The railway route is about 15–20% longer than a straight line would be, so the actual platform-to-platform average speed between Leeds and Man Vic will be considerably higher than 60mph. Even on the current arrangements and at quiet times of day, the train is typically a comparable time to driving, and for much of the time is already quicker even before cutting 10 minutes off the journey. Without boring a new tunnel in a straight line right under the hills, you're going to struggle to get journey times down much more.
When the Hope Valley Capacity Scheme was being explained I recall talk of the Dore Station Junction planned turnout speeds having to be reduced because higher speed pointwork was going to add significant extra cost for modest benefit - and there may have been a suggestion that such tailor made track work couldn't be made in Britain at that time.There is so much that could be done to remove slow turnout speeds.
That is why they remodelled Stalybridge in 2023, having only done it 11 years earlier in 2012. The issue was that the 2012 scheme didn't produce higher speeds for the line towards Victoria as Piccadilly was the centre of the universe. Since then TPE services were moved to Victoria and so the 2023 scheme rectified that.There is so much that could be done to remove slow turnout speeds.
Yeah they definitely should and would not be altering the platforms to fit the old standard train height. It would be out of gauge with container freight anyway I thinkLevel access to National Rail trains the height of current trains at Dewsbury won't happen anywhere outside of the Elizabeth line core and Heathrow. So no chance of level boarding until Northern's new trains arrive for the line I the 2030s, which will have at least some level boarding (the likes of which Stadler's British trains have in full).
Thanks, interesting. I note the weaver green banded lighting columns have been erected on the station side.Track renewal started today:
View attachment 206021
View attachment 206018View attachment 206019View attachment 206020
The current (June) Saturday service at Huddersfield consists of an hourly stopping service on the Penistone line, an hourly stopping service to/from Piccadilly, and an hourly service to Brighouse, Sowerby Bridge, etc, Victoria. It's quite frustrating that almost none of them connect well with each other, not helped by having to walk right to the far end of the renumbered platform 3 to use the new footbridge.Not sure they could have made the Huddersfield to Leeds alternatives more annoying. The change at Sowerby gets you the busy 2 carriage Northern service instead of connecting with the later 5 car service. Running a Huddersfield to Leeds via Halifax surely was theoretically possible?
And the bus goes via Dewsbury, taking just over an hour. No directs lol
Edit: Even better today ! The inbound from Manchester Airport arrives at the exact same time the Victoria service for Sowerby Bridge leaves, so that would add an hour if you wanted to stick to the trains.
May be something to do with the new location for the rebuilt listed café?Incidentally, can anyone shed any light on why the stairs on platform 3 face outwards towards Deighton, extending the walking distance and time when changing platforms and trains. Was there a reason why the stairs couldn't face towards the centre of the station?
Incidentally, can anyone shed any light on why the stairs on platform 3 face outwards towards Deighton, extending the walking distance and time when changing platforms and trains. Was there a reason why the stairs couldn't face towards the centre of the station?
Once complete the rebuilt island platform and the new platforms will be much further East than current so having the footbridge that way will distribute passengers along the platforms. With the subway back in use it will provide access at the West end and the new footbridge the East end of the new build platforms.Incidentally, can anyone shed any light on why the stairs on platform 3 face outwards towards Deighton, extending the walking distance and time when changing platforms and trains. Was there a reason why the stairs couldn't face towards the centre of the station?
I think the columns holding up the main east end canopy extension on P3 will be right where you’d want a flight of stairs facing towards the middle of the station to come down. So it would need to be offset to the P3 side of the platform width to put the stairs under the new high canopy. The P4 side new canopy would not be high enough. Then the position necessary to avoid the columns might become too close to the P3 platform edge.May be something to do with the new location for the rebuilt listed café?

I always wondered why Stalybridge was remodelled twice in so short a time. I didn't realise it was as long as 11 years.That is why they remodelled Stalybridge in 2023, having only done it 11 years earlier in 2012. The issue was that the 2012 scheme didn't produce higher speeds for the line towards Victoria as Piccadilly was the centre of the universe. Since then TPE services were moved to Victoria and so the 2023 scheme rectified that.
When Huddersfield is finished, the turnout speeds will be increased there as well.
Hi,
I passed Morley recently and saw works outside the station on the platform two side. Want to say I saw a catenary maintenance vehicle when flying through but there were a lot of vans, skips, hi Vis workers.
If anyone could shed some light, that would be greatly appreciated.








That's interesting, thanks. Would I be right in saying that the site on the platform two side is for storing maintenance vehicles and equipment?

NoWill it be quad track through Morley?
That's really helpful, thanks. Wow I hadn't realised there used to be a big mound there as as well.Yes, there's a big gravelly yard behind more or less the full length of Platform 2, where various vehicles and supplies have been stored over the last few years. There is a point just past the end of the platforms (Leeds end) where the compound access is, and the level-crossing allowing the road/rail vehicles to transfer on and off the tracks.
This picture, taken during the construction of the new station in February 2023, gives a clear view of the compound before the lift shafts obscured the view.
View attachment 206126
Wow, they're certainly putting the can into cantilever...Some new structures have appeared at Garforth since last time I was here - the massive structure plonked in the middle of the platforms seems a bit unfortunately placed though
That's really helpful, thanks. Wow I hadn't realised there used to be a big mound there as as well.
Might turn into a car park by the end as a guess.