speedy1

Member
Joined
1 Sep 2023
Messages
301
Location
Mossley
Not sure they could have made the Huddersfield to Leeds alternatives more annoying. The change at Sowerby gets you the busy 2 carriage Northern service instead of connecting with the later 5 car service. Running a Huddersfield to Leeds via Halifax surely was theoretically possible?

And the bus goes via Dewsbury, taking just over an hour. No directs lol

Edit: Even better today ! The inbound from Manchester Airport arrives at the exact same time the Victoria service for Sowerby Bridge leaves, so that would add an hour if you wanted to stick to the trains.
 
Last edited:

stevieinselby

Established Member
Joined
6 Jan 2013
Messages
1,658
Location
Selby
Still pretty feeble in my opinion. Leeds to Manchester is 40 miles as the crow flies, so that is an average speed of less than 60mph.
For reasons that are pretty obvious to anyone who has seen The Pennines, trains crossing them don't follow the same route as crows. The railway route is about 15–20% longer than a straight line would be, so the actual platform-to-platform average speed between Leeds and Man Vic will be considerably higher than 60mph. Even on the current arrangements and at quiet times of day, the train is typically a comparable time to driving, and for much of the time is already quicker even before cutting 10 minutes off the journey. Without boring a new tunnel in a straight line right under the hills, you're going to struggle to get journey times down much more.
 
Joined
5 Aug 2015
Messages
869
Location
Norfolk
According to the ELR numbers it's just over 42 miles from Victoria to Leeds.
(I'm going off MDL2 which ends at Whitehall West Jnc at 42m 25c, datum is listed as Victoria via Huddersfield)
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,195
For reasons that are pretty obvious to anyone who has seen The Pennines, trains crossing them don't follow the same route as crows. The railway route is about 15–20% longer than a straight line would be, so the actual platform-to-platform average speed between Leeds and Man Vic will be considerably higher than 60mph. Even on the current arrangements and at quiet times of day, the train is typically a comparable time to driving, and for much of the time is already quicker even before cutting 10 minutes off the journey. Without boring a new tunnel in a straight line right under the hills, you're going to struggle to get journey times down much more.
There is so much that could be done to remove slow turnout speeds.
 

Killingworth

Established Member
Joined
30 May 2018
Messages
6,430
Location
Sheffield
There is so much that could be done to remove slow turnout speeds.
When the Hope Valley Capacity Scheme was being explained I recall talk of the Dore Station Junction planned turnout speeds having to be reduced because higher speed pointwork was going to add significant extra cost for modest benefit - and there may have been a suggestion that such tailor made track work couldn't be made in Britain at that time.

Nothing is as easy as it may seem on the railway.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
I noticed in some of the recent videos about Dewsbury that a couple of people have commented about the platforms there being altered to provide level access. Is this wishful thinking? Isn’t it the case that the platforms are being altered to match following the track being lowered slightly, to give electrification clearance. I haven’t seen anything official suggesting level access is being aimed for generally across the route?

Or, it might end up better than before, but not actually ‘level’. Does anyone know for sure?
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,584
Location
Greater Manchester
Level access to National Rail trains the height of current trains at Dewsbury won't happen anywhere outside of the Elizabeth line core and Heathrow. So no chance of level boarding until Northern's new trains arrive for the line I the 2030s, which will have at least some level boarding (the likes of which Stadler's British trains have in full).
 

Ian Hardy

Member
Joined
18 Nov 2009
Messages
445
There is so much that could be done to remove slow turnout speeds.
That is why they remodelled Stalybridge in 2023, having only done it 11 years earlier in 2012. The issue was that the 2012 scheme didn't produce higher speeds for the line towards Victoria as Piccadilly was the centre of the universe. Since then TPE services were moved to Victoria and so the 2023 scheme rectified that.
When Huddersfield is finished, the turnout speeds will be increased there as well.
 
Joined
5 Aug 2015
Messages
869
Location
Norfolk
Level access to National Rail trains the height of current trains at Dewsbury won't happen anywhere outside of the Elizabeth line core and Heathrow. So no chance of level boarding until Northern's new trains arrive for the line I the 2030s, which will have at least some level boarding (the likes of which Stadler's British trains have in full).
Yeah they definitely should and would not be altering the platforms to fit the old standard train height. It would be out of gauge with container freight anyway I think
 

nr758123

Member
Joined
3 Jun 2014
Messages
636
Location
West Yorkshire
Not sure they could have made the Huddersfield to Leeds alternatives more annoying. The change at Sowerby gets you the busy 2 carriage Northern service instead of connecting with the later 5 car service. Running a Huddersfield to Leeds via Halifax surely was theoretically possible?

And the bus goes via Dewsbury, taking just over an hour. No directs lol

Edit: Even better today ! The inbound from Manchester Airport arrives at the exact same time the Victoria service for Sowerby Bridge leaves, so that would add an hour if you wanted to stick to the trains.
The current (June) Saturday service at Huddersfield consists of an hourly stopping service on the Penistone line, an hourly stopping service to/from Piccadilly, and an hourly service to Brighouse, Sowerby Bridge, etc, Victoria. It's quite frustrating that almost none of them connect well with each other, not helped by having to walk right to the far end of the renumbered platform 3 to use the new footbridge.

Incidentally, can anyone shed any light on why the stairs on platform 3 face outwards towards Deighton, extending the walking distance and time when changing platforms and trains. Was there a reason why the stairs couldn't face towards the centre of the station?

It also seems a bit daft, when there are two trains per hour to Manchester, that the departure times from Huddersfield are so close together that the Victoria train departs just before the train to Piccadilly but is overtaken and arrives in Manchester later.
 

D6130

Established Member
Joined
12 Jan 2021
Messages
8,925
Location
West Yorkshire/Tuscany
Incidentally, can anyone shed any light on why the stairs on platform 3 face outwards towards Deighton, extending the walking distance and time when changing platforms and trains. Was there a reason why the stairs couldn't face towards the centre of the station?
May be something to do with the new location for the rebuilt listed café?
 

speedy1

Member
Joined
1 Sep 2023
Messages
301
Location
Mossley
Incidentally, can anyone shed any light on why the stairs on platform 3 face outwards towards Deighton, extending the walking distance and time when changing platforms and trains. Was there a reason why the stairs couldn't face towards the centre of the station?

Hasn't the platform had an extension and perhaps the bridge will look less out of place once the extension is open? And once the subway is reopened too of course, in the sense that people won't use it quite so much.

But yes still strikes me as a bit odd and I'm curious too
 

3RDGEN

Member
Joined
6 Mar 2023
Messages
584
Location
Hull
Incidentally, can anyone shed any light on why the stairs on platform 3 face outwards towards Deighton, extending the walking distance and time when changing platforms and trains. Was there a reason why the stairs couldn't face towards the centre of the station?
Once complete the rebuilt island platform and the new platforms will be much further East than current so having the footbridge that way will distribute passengers along the platforms. With the subway back in use it will provide access at the West end and the new footbridge the East end of the new build platforms.

There are a few Artist Impressions of the rebuilt Huddersfield station on the TRU website at "https://thetrupgrade.co.uk/yourstation/huddersfield/", you need to scroll down a bit.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
May be something to do with the new location for the rebuilt listed café?
I think the columns holding up the main east end canopy extension on P3 will be right where you’d want a flight of stairs facing towards the middle of the station to come down. So it would need to be offset to the P3 side of the platform width to put the stairs under the new high canopy. The P4 side new canopy would not be high enough. Then the position necessary to avoid the columns might become too close to the P3 platform edge.
.IMG_1843.jpeg
 
Last edited:

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
2,195
That is why they remodelled Stalybridge in 2023, having only done it 11 years earlier in 2012. The issue was that the 2012 scheme didn't produce higher speeds for the line towards Victoria as Piccadilly was the centre of the universe. Since then TPE services were moved to Victoria and so the 2023 scheme rectified that.
When Huddersfield is finished, the turnout speeds will be increased there as well.
I always wondered why Stalybridge was remodelled twice in so short a time. I didn't realise it was as long as 11 years.
 

MboroFC

Member
Joined
10 Dec 2025
Messages
255
Location
United Kingdom
Hi,

I passed Morley recently and saw works outside the station on the platform two side. Want to say I saw a catenary maintenance vehicle when flying through but there were a lot of vans, skips, hi Vis workers.

If anyone could shed some light, that would be greatly appreciated.
 

grdc

Member
Joined
19 Feb 2023
Messages
30
Location
Morley
Hi,

I passed Morley recently and saw works outside the station on the platform two side. Want to say I saw a catenary maintenance vehicle when flying through but there were a lot of vans, skips, hi Vis workers.

If anyone could shed some light, that would be greatly appreciated.

They have added some more masts in-between the gasworks (Natasha Elliot) footbridge and Morley station.

There had been a significant pause in his work.

This was the last mast before the station in November 2024:
PXL_20241117_143051763_exported_1781645938389.jpg

No more masts were put in between that time and the last two weeks.

Here was the view last Monday:

PXL_20260608_185336894_exported_1781645999480.jpg

There was some gear sat there waiting to be erected:

PXL_20260608_185207359_exported_1781646134371.jpg
PXL_20260608_185414020_exported_1781646006552.jpg

There has also been lots of work going on inside Morley tunnel during the numerous recent possessions.

No idea what, apart from it involving ballast, but I did enjoy seeing workmen coming and going in their people mover. Can't have them walking to work in the tunnel, its 2 miles long!

PXL_20260608_190419298_exported_1781646512747.jpg
PXL_20251023_133124418_exported_1781646546850.jpg
PXL_20260608_190326730_exported_1781646667775.jpg

Noticed this antenna on the old Leeds bound platform, presumably helps communicate with those working in the tunnel?

PXL_20260608_190300482_exported_1781646677817.jpg
 

MboroFC

Member
Joined
10 Dec 2025
Messages
255
Location
United Kingdom
That's interesting, thanks. Would I be right in saying that the site on the platform two side is for storing maintenance vehicles and equipment?
 

grdc

Member
Joined
19 Feb 2023
Messages
30
Location
Morley
That's interesting, thanks. Would I be right in saying that the site on the platform two side is for storing maintenance vehicles and equipment?

Yes, there's a big gravelly yard behind more or less the full length of Platform 2, where various vehicles and supplies have been stored over the last few years. There is a point just past the end of the platforms (Leeds end) where the compound access is, and the level-crossing allowing the road/rail vehicles to transfer on and off the tracks.

This picture, taken during the construction of the new station in February 2023, gives a clear view of the compound before the lift shafts obscured the view.
PXL_20230212_152526933_exported_1781651102654.jpg
 

Monkeyhead

Member
Joined
21 Sep 2016
Messages
90
Some new structures have appeared at Garforth since last time I was here - the massive structure plonked in the middle of the platforms seems a bit unfortunately placed though
 

Attachments

  • IMG_8377.jpeg
    4.5 MB · Views: 273
  • IMG_8378.jpeg
    IMG_8378.jpeg
    3.5 MB · Views: 220

MboroFC

Member
Joined
10 Dec 2025
Messages
255
Location
United Kingdom
Yes, there's a big gravelly yard behind more or less the full length of Platform 2, where various vehicles and supplies have been stored over the last few years. There is a point just past the end of the platforms (Leeds end) where the compound access is, and the level-crossing allowing the road/rail vehicles to transfer on and off the tracks.

This picture, taken during the construction of the new station in February 2023, gives a clear view of the compound before the lift shafts obscured the view.
View attachment 206126
That's really helpful, thanks. Wow I hadn't realised there used to be a big mound there as as well.

Might turn into a car park by the end as a guess.
 

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,830
Some new structures have appeared at Garforth since last time I was here - the massive structure plonked in the middle of the platforms seems a bit unfortunately placed though
Wow, they're certainly putting the can into cantilever...

The one on the platform is massive - from the look of it they have had to set it back behind the footbridge stairs to avoid it getting in the way any more than it already does. That means the span is huge and the column size has to be very big to support it.
 

Monkeyhead

Member
Joined
21 Sep 2016
Messages
90
I hadn’t realised until the train journey back from York that the wiring seems to be up form Church Fenton to Micklefield, and plenty of structures up to East Garforth that look ready for having wires installed.
 

grdc

Member
Joined
19 Feb 2023
Messages
30
Location
Morley
That's really helpful, thanks. Wow I hadn't realised there used to be a big mound there as as well.

Might turn into a car park by the end as a guess.

Unfortunately that land, despite previously being sidings, no longer owned by the railway. Network rail are merely borrowing it.

All of the plots down valley road, former railway and former gasworks are a little bit "skeevy," and have been subject to various rejected planning requests.

First houses, then a traveller encampment, then *drum roll* a totally unofficial railway car park complete with coffee kiosk.

<a href="https://publicaccess.leeds.gov.uk/o...s.do?activeTab=documents&keyVal=S5NAAVJBKUW00">Planning link</a> This was refused, as the council were unhappy with the amount of traffic it would generate on the narrow bridge above the tunnel portal, and the fact that they had no permission from network rail to actually access the station from the site.

So, once the TPRU people have moved on, it will presumably go back to being "open storage" land full of decommissioned semi trailers and shipping containers used for storing god-knows-what, alsacians roaming around, etc.
 

Top