Monkeyhead
Member
- Joined
- 21 Sep 2016
- Messages
- 90
Duplicate post
Yes - very ugly imho.Wow, they're certainly putting the can into cantilever...
The one on the platform is massive - from the look of it they have had to set it back behind the footbridge stairs to avoid it getting in the way any more than it already does. That means the span is huge and the column size has to be very big to support it.
There is a small gap around church Fenton awaiting the bridge renewal but yes that's correct. And Micklefield to just shy of Neville Hill is rapidly progressing now with all piles in and most masts up with progress greater towards the micklefield end.I hadn’t realised until the train journey back from York that the wiring seems to be up form Church Fenton to Micklefield, and plenty of structures up to East Garforth that look ready for having wires installed.
"We begged Network Rail in vain to make their OLE more in keeping with the village's rustic aesthetic."Yes - very ugly imho.
And if they'd gone with headspans, the forum boards would be full of complaints in a few years time about why the OLE falls off so often and that NR should have known better and built it stronger...."We begged Network Rail in vain to make their OLE more in keeping with the village's rustic aesthetic."
"And?"
"They told us to **** off."
But what was wrong with using the simpler and less intrusive Series 2 OHLE design that was installed on the Chat Moss route between Edge Hill and Manchester (line speed also 90mph) around 2012? This is also part of the Transpennine route.The OLE must remain in a narrow corridor of 3-dimensional space (especially with the bridge and curve), and must be able to resist the forces of passing trains (90mph linespeed) and environmental conditions. Uprights on a station platform must be 2.5m back from the platform edge, so any structure (STC or TTC) is going to be large and bulky to deal with the forces involved.
For all intents and purposes, that is series 2.But what was wrong with using the simpler and less intrusive Series 2 OHLE design that was installed on the Chat Moss route between Edge Hill and Manchester (line speed also 90mph) around 2012? This is also part of the Transpennine route.
Yes, because it's completely unobtrusive at all the stations...But what was wrong with using the simpler and less intrusive Series 2 OHLE design that was installed on the Chat Moss route between Edge Hill and Manchester (line speed also 90mph) around 2012? This is also part of the Transpennine route.
The designer would have been someone skilled in the job and would have considered a whole bunch of variables before coming to the conclusion that the TTC was the best available option for that location.Serial (i.e repetitive) installations are usually favoured for speed and therefore cost (its hourly expensive to have all those orange types on site), even if another foundation is needed but for a lighter mast, so one wonders why the portals further along the platforms weren't copied (or TTC's used throughout?). However ground conditions and possible obstruction of the footbridge will have affected the choice. Spacing is an issue on a curve as is contact wire distance to the platform. There is of course more choice in spacing which now seems to range from 50 - 95m as against the old 240'/73m standard.
I imagine the designer knew best.
WAO
I assume rustic aesthetic is not referring to garforth specifically!"We begged Network Rail in vain to make their OLE more in keeping with the village's rustic aesthetic."
"And?"
"They told us to **** off."
It's well worth remembering that Series 1 structures have been used between Man Vic & Stalybridge tunnel already, and that they are currently going in between Huddersfield & Leeds, so Garforth (and indeed East Garforth, Micklefield, and Cross Gates) are no different to anywbere else on the route. These were also done after the UKMS range was born, mixing the two ranges together.The designer would have been someone skilled in the job and would have considered a whole bunch of variables before coming to the conclusion that the TTC was the best available option for that location.
Unless that individual is here to enlighten us why that decision was taken then "but it doesn't look very pretty" is just meaningless noise from people who don't know enough to judge.
Obviously nobody is infallible, but without any evidence there's no reason to think that this isn't the best available solution for that situation.
Very true!And if they'd gone with headspans, the forum boards would be full of complaints in a few years time about why the OLE falls off so often and that NR should have known better and built it stronger....
They really can't win, can they.
I can understand headspans (wires) being out of favour, but the WCML gantries have performed without any failures that I know of and have the benefit of 2 (presumably) smaller foundations.The designer would have been someone skilled in the job and would have considered a whole bunch of variables before coming to the conclusion that the TTC was the best available option for that location.
Unless that individual is here to enlighten us why that decision was taken then "but it doesn't look very pretty" is just meaningless noise from people who don't know enough to judge.
Obviously nobody is infallible, but without any evidence there's no reason to think that this isn't the best available solution for that situation.
Errr... Wouldn't be too sure about that, if the standards of some of the engineers I've met on this project are any indication! The West of Leeds section in particular has some "interesting" characters doing design work there...The designer would have been someone skilled in the job and would have considered a whole bunch of variables before coming to the conclusion that the TTC was the best available option for that location.
Unless that individual is here to enlighten us why that decision was taken then "but it doesn't look very pretty" is just meaningless noise from people who don't know enough to judge.
Obviously nobody is infallible, but without any evidence there's no reason to think that this isn't the best available solution for that situation.
Iirc, Disney uses olive green paint (dubbed "Go-Away Green) on functional stuff they don't want the public to notice.
Wonder if that would work here?
Maybe a more suitable green matching whatever colour the foliage generally is around there?Iirc, Disney uses olive green paint (dubbed "Go-Away Green) on functional stuff they don't want the public to notice.
Painting masts green would be far too German - they’ve been doing it for years.Iirc, Disney uses olive green paint (dubbed "Go-Away Green) on functional stuff they don't want the public to notice.
What were the engineering works this time last month please? Assuming they were at Huddersfield.
Thank youBradley Junction east of Huddersfield was the major work area with various bridges demolished, replaced with OHLE friendly structures and the entire junction was relayed

Thank you![]()
The wiring at Newton Le W and Earlstown was installed as part of the Weaver to Glasgow electrification in the early 1970s. I think that twin track cantilever will be a more recent modification.Headspans and a gantry at Newton-le-Willows: https://commons.wikimedia.org/wiki/...illows_railway_station_(geograph_3818425).jpg
The similarly intrusive TTC at Earlestowne: https://commons.wikimedia.org/wiki/...:Platform_1,_Earlestown_railway_station_2.jpg
Precisely. The twin track cantilever there is Series 2, although, if hairs are being split (as is so common on this forum), the design of the mast and boom itself goes back as far as the Mk3 era (definitely GN Suburban, possibly Weaver-Glasgow).The
The wiring at Newton Le W and Earlstown was installed as part of the Weaver to Glasgow electrification in the early 1970s. I think that twin track cantilever will be a more recent modification.
In those photos, the Newton-le-Willows wiring dates back to the 1970s; the Earlestown wiring is from the 2015 electrification towards Edge Hill.The wiring at Newton Le W and Earlstown was installed as part of the Weaver to Glasgow electrification in the early 1970s. I think that twin track cantilever will be a more recent modification.
Side/Single-Face Platform:What are the limits of narrowness for platforms?
I believe is was something to do with the listed status of Dewsbury Station (Grade II)Does anyone know why Dewsbury is keeping the blue and white theme and not going the full weaver green/black like batley, mirfield etc?