More importantly are they Vac braked?Mark 2a are the older style and are more like a mark 1 than an air-con mark 2.
More importantly are they Vac braked?Mark 2a are the older style and are more like a mark 1 than an air-con mark 2.
Mk2as are air braked and helpfully dual heat, so should have a dynamo to avoid the need for ETS.More importantly are they Vac braked?
Yes I agree for the Jacobite but as discussed further up this thread, I would now say that leaves WCR dangerously short of air braked locos in England and Wales (34028 & 34067).Mk2as are air braked and helpfully dual heat, so should have a dynamo to avoid the need for ETS.
Riley's black 5s are mostly, if not all, dual braked.
Overall sounds like a practical solution that ticks the boxes.
Presumably these are the coaches usually used on the afternoon trainMark 2a are the older style and are more like a mark 1 than an air-con mark 2.
Yes I believe most of them are from the set that operated the afternoon JacobitePresumably these are the coaches usually used on the afternoon train
What loco(s) are planned for use thenMark 2a are the older style and are more like a mark 1 than an air-con mark 2.
14 photographs of 5Z10 are here: 37518 An Gearasdan / Fort William, 44871 & 45407 T… - North west trains, 2026 - andrewstransport https://share.google/fsowOyKpFeklN9Ns0
It does I believe the light is just quite smallHas that Hastings unit on the website got central door locking because there's no sign of an outside door light, and if not then what's going on there?
Hastings Diesels Limited wrote a detailed article on their CDL fit back in 2005 which includes a photo of the exterior lights. It can be found on their website and is too long to copy here.Has that Hastings unit on the website got central door locking because there's no sign of an outside door light, and if not then what's going on there?
There is a book:I would like to know about the construction of the Mk1 coaches. I assume steel frames and sheet metal sides but what about the rest.
On a timber framed coach, CDL would not be safe for passengers in case of a fire.
CDL would be a challenge on any vehicle in the event of fire . the key is what is the emergency releaseI would like to know about the construction of the Mk1 coaches. I assume steel frames and sheet metal sides but what about the rest.
On a timber framed coach, CDL would not be safe for passengers in case of a fire.
ROGS states that an ICP is required where the change introduces a new or significantly increased risk to safety. There is an argument that fitting a ‘known’ CDL system (be that BR-style air-operated or VT-style mag locks) does not increase that risk… although not one I would personally make.Presumably the design (if different to the ones used by LSL or Vintage Trains) would need approving by an "Independant Competent Person"
From those photo's it appears the rear seven coaches are already formed up for the service train which makes sense however the third vehicle from the rear is MkI buffet 99318. In the photo of 99318 it appears to have amber indicators next to the passenger door which may indicate it has CDL fitted however I can't see an external emergency release handle on the vehicle bodyside unlike the MkII's.14 photographs of 5Z10 are here: 37518 An Gearasdan / Fort William, 44871 & 45407 T… - North west trains, 2026 - andrewstransport https://share.google/fsowOyKpFeklN9Ns0
Thanks for the confirmation.It's been fitted recently.
Good idea!Spares for the coaches?
It's the tool van/mobile workshop which goes to Fort William with the locos & stock every year......What's the purpose of the GUV in the centre of the train?
Thanks. I thought that might be the case.It's the tool van/mobile workshop which goes to Fort William with the locos & stock every year......
Is it correct that the following carriages have headed North?
35517
35486
94225
9539
5487
5453
5419
99318
5229
5239
Were there any others already there?
Great thank you!List is correct.
I think former Caley Mk. 3 Sleeper 10718 is still at FW (presumably acting as a dormitory for the Jacobite crews) - it went north with the stock at the start of the 2025 season.
Penrith last Friday on the “GOSH Ness Monster” - CDL lights lit but obviously people didn’t detrain through the non-platformed doors!!!Has that Hastings unit on the website got central door locking because there's no sign of an outside door light, and if not then what's going on there?
Which loco do you knowThe Jacobite has left Fort William on time at 10.15.