West Midlands Trains "Destination Manchester" - will it happen?

tfw756rider

On Moderation
Joined
30 Nov 2024
Messages
1,962
Location
Wales (sometimes in England), thanks for replying!
Seems like driver training paths have been added from Crewe to Manchester Airport from next week

with Class 323 timing loads!
timing load is meaningless
Well, there must be some meaning behind the Class 323 timing load (rather than 350, or even just electric multiple unit?)
My guess is that the 323s could have a slightly slower timing than a 350, so there is a template there to be used with minimal work - and if it is a slightly slower timing then that is all to the good as you would expect drivers on route-learning to accelerating and braking more cautiously and going a bit slower overall than the units are actually capable of.
That would make sense @AndrewE, thanks :)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,687
You don't generally create new running times specifically for test runs. You use something thats going to be a right side failure.
 

SCDR_WMR

Established Member
Joined
17 Dec 2017
Messages
2,622
Location
Crewe
I know - that's because West Midlands Trains is the Train Operating Company (TOC) of both of those brands (although that's not consistent with Realtime Trains splitting Govia Thameslink Railway into its 4 brands).


Well, there must be some meaning behind the Class 323 timing load (rather than 350, or even just electric multiple unit?)
Traksy often, if not always, has 323 timings for the 350 work. No idea why.

The training runs are 100% 350s as nobody at Crewe signs 323s and 350s will be working the route anyway.

Looking to train either 2 or 4 drivers up per week given there is now over 90 drivers at Crewe. Wolves drivers start learning via Stoke after May, Crewe to Airport pencilled for after December.
 

lowe1409

Member
Joined
6 Feb 2024
Messages
265
Location
Cheshire

Bevan Price

Established Member
Joined
22 Apr 2010
Messages
8,331
I know - that's because West Midlands Trains is the Train Operating Company (TOC) of both of those brands (although that's not consistent with Realtime Trains splitting Govia Thameslink Railway into its 4 brands).


Well, there must be some meaning behind the Class 323 timing load (rather than 350, or even just electric multiple unit?)
My checks with GPS show that Classes 323 & 350 have almost identical acceleration rates from a standing start; the only difference is that 323s are limited to 90 mph; but 350s can do up to 110 mph.
 

CJ

Member
Joined
18 May 2009
Messages
214
Location
Stockport
Seems like driver training paths have been added from Crewe to Manchester Airport from next week


And it looks like a test ran yesterday, only one circuit, from Crewe - Manchester Airport and back:

 

PM_ME_DnB_

New Member
Joined
30 Jul 2023
Messages
2
Location
Manchester
It was adding that erratic-ness to the not-very-resilient south WCML slows (as well as bringing Rugeley and whatever the other place was in as well) that messed it up. The Crewe service is largely separate (as it runs fast line the whole way) and Manchester Victoria isn't that much of a problem compared to Castlefield so I think it would be OK in that sense, the main concern I would have is overcrowding which would mean cranking the fares up, so I think overall it would be bad.
Going back to the Euston-Crewe-Manchester Victoria proposal, sorry but what’s the blocker for an extension from Crewe via Warrington BQ and Earlestown/Newton-Le-Willows?

As that pathing is electrified and avoids Castlefield and the WCML crossing by Crewe (although the crossing near Earlestown may be an issue)
 

Rail Ranger

Member
Joined
20 Feb 2014
Messages
1,132
I think capacity at Manchester Victoria is the main showstopper. The station is so busy these days. There is nowhere for a 10-coach train to lay over.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,612
Location
Greater Manchester
There is nowhere for a 10-coach train to lay over.
not that a double 730/2 could fit there anyway - the longest is platform 3 at 254 metres, short of the 260 needed for a 10*26m consist.

Edit: as pointed out below, 730s have 24m carriages, not 26m carriages, so would fit in Platform 3, but only platform 3.
 
Last edited:

Rail Ranger

Member
Joined
20 Feb 2014
Messages
1,132
Selective door opening?

== Doublepost prevention - post automatically merged: ==

Wikipedia says the class 730 coaches are 24 metres long making 240 metres for a 10-car train.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,612
Location
Greater Manchester
Wikipedia says the class 730 coaches are 24 metres long making 240 metres for a 10-car train.
yep, I was wrong, I was thinking about Hereford where a long train does hang over the end of a terminus so had 26 metre carriages in mind instead of the 24 metre carraiges of 730s.


I think I recall it being said anyway that they planned to split a 730/2 pair at Crewe and send only 1 set to Manchester.
 

PM_ME_DnB_

New Member
Joined
30 Jul 2023
Messages
2
Location
Manchester
Selective door opening?

== Doublepost prevention - post automatically merged: ==

Wikipedia says the class 730 coaches are 24 metres long making 240 metres for a 10-car train.

And to solve the layover problem, I wonder how feasible it would be to extend platform 3 westward (by 2-300m) to create space for a double 730/2?

I’m not sure if platform 3 also ran the length of the former Exchange station, but hopefully reinstating something to that effect wouldn’t be too difficult in the grand scheme of things
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,817
Going back to the Euston-Crewe-Manchester Victoria proposal, sorry but what’s the blocker for an extension from Crewe via Warrington BQ and Earlestown/Newton-Le-Willows?

As that pathing is electrified and avoids Castlefield and the WCML crossing by Crewe (although the crossing near Earlestown may be an issue)

Power supply notth of Crewe, and no paths. Other than that all good.
 

Rail Ranger

Member
Joined
20 Feb 2014
Messages
1,132
Well there'd be a need for lots of investment then if the Parkside intermodal depot plan ever happens. Where's the problem with pathing? Winsford station to Weaver Junction?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,687
Well there'd be a need for lots of investment then if the Parkside intermodal depot plan ever happens. Where's the problem with pathing? Winsford station to Weaver Junction?
No, what will happen is that the third party will take a risk on development for FOCs to have paths rejected. Winsford Weaver is the issue capacity wise.
 

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,685
Location
UK
It seems rather strange that Birmingham has a large airport and a railway station that recognises that, should want a rail service to Manchester Airport.
I can hardly imagine many people would be using it all the way from Birmingham to Manchester Airport. Taking the fast WMT/Avanti or XC services to Crewe or Piccadilly (respectively) and changing would be much quicker.

It'd be more attractive from Wolverhampton and beyond (after the Tame Bridge 'detour'), since the time saved by changing would be reduced - you are 'only' taking the detour via Stoke.

Manchester Airport is a much more significant airport than Birmingham though. Manchester has flights to around 200 destinations whilst Birmingham only has 130, plus the frequencies are generally much better at Manchester.
 

Rail Ranger

Member
Joined
20 Feb 2014
Messages
1,132
One option which would get round the issues of power supply and pathing north of Crewe would be for LNwR to only run one train per hour between Birmingham and Liverpool and to use the path of the other one for the Euston to Manchester Victoria service.
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,344
One option which would get round the issues of power supply and pathing north of Crewe would be for LNwR to only run one train per hour between Birmingham and Liverpool and to use the path of the other one for the Euston to Manchester Victoria service.
but the Liverpool-Brum services are well-used and even at half-hourly quite a lot of them really need strengthening now. Reducing back to once an hour (which I think was left behind pre-Covid) would be a really retrograde step.
 

SCDR_WMR

Established Member
Joined
17 Dec 2017
Messages
2,622
Location
Crewe
Could make an hourly Birmingham-Liverpool a 10-car.
Some days it could really do with an 8 car 2tph!

Sound like you have a solution and looking for a problem to use it on tbh.

The real solution is obviously to beef up the power supply and to 4 track through winsford etc. Keeping stopping services and freight off through lines could release quite a bit of capacity no?
 

Rail Ranger

Member
Joined
20 Feb 2014
Messages
1,132
Beefing up the power supply would probably be much much cheaper than any four tracking between Winsford station and Weaver Junction, which would be difficult and very expensive. Hence why it was never done in the past.

== Doublepost prevention - post automatically merged: ==

If an hourly path were to be provided to and from the Parkside container terminal it sounds like there would be a need to withdraw an existing hourly service.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,687
Of course if Cross Country were to again serve Liverpool.....
With 5 car Voyagers? Where is the benefit of that?

== Doublepost prevention - post automatically merged: ==

If an hourly path were to be provided to and from the Parkside container terminal it sounds like there would be a need to withdraw an existing hourly service.
Which isn't proven at all, and under the decision criteria, might not pass muster either.
 