Established Member
Joined
31 Dec 2013
Messages
3,567
Location
Lancashire
haven't we seen that pic before? I'm sure it was shown to be either a spoof or a mistaken use of devices intended for protecting hoses from road traffic.
It's very likely that a flanged wheelset running over it would fail to meet the grooved rail afterwards...
Yes seen that picture a few times on various sites
 

Krokodil

Established Member
Joined
23 Jan 2023
Messages
6,524
Location
Wales
haven't we seen that pic before? I'm sure it was shown to be either a spoof or a mistaken use of devices intended for protecting hoses from road traffic.
It's very likely that a flanged wheelset running over it would fail to meet the grooved rail afterwards...
As far as I can recall, the line was closed and the devices had been placed as a joke by the firefighters between finishing extinguishing the fire and packing up.

== Doublepost prevention - post automatically merged: ==

A patent does exist for a device which would allow streetcars to pass over hoses. I very much doubt that it would take the weight of trains though.
 

D1511

Member
Joined
29 Jul 2023
Messages
1,199
Location
WCML N
As far as I can recall, the line was closed and the devices had been placed as a joke by the firefighters between finishing extinguishing the fire and packing up.
It looked like the flanges would either slice clean through it, or it would risk derailing the train if it was much harder, so it didn't seem like a real thing to me.....
 

Dave W

Member
Joined
27 Sep 2019
Messages
874
Location
North London
It looked like the flanges would either slice clean through it, or it would risk derailing the train if it was much harder, so it didn't seem like a real thing to me.....
A classic yarn spun by several railwaymen in their various books. The hapless fire brigade laying chocks and or ramps to go over their hoses on a level crossing much to the amusement of writer and by extension reader.
 

Harpo

Established Member
Joined
21 Aug 2024
Messages
3,733
Location
Newport
A classic yarn spun by several railwaymen in their various books. The hapless fire brigade laying chocks and or ramps to go over their hoses on a level crossing much to the amusement of writer and by extension reader.
The modern flip side is police asking a MOM if the power is off and getting the answer, ‘No but unless any of you is 13 feet tall you’ll be OK’.
 

stuartl

Member
Joined
10 Aug 2014
Messages
242
When large, old buildings like this catch fire do the fire service have enough capacity in terms of both equipment and water availability to be able to extinguish the fire before it gets out of control ? If not, do they concentrate on saving the adjoing buildings?
 

b0b

Established Member
Joined
25 Jan 2010
Messages
1,371
When large, old buildings like this catch fire do the fire service have enough capacity in terms of both equipment and water availability to be able to extinguish the fire before it gets out of control ? If not, do they concentrate on saving the adjoing buildings?
Not an expert but when my home was at risk of burning down, the fire services main goal was to prevent the fire spreading to adjoining homes. They basically said if my home catches fire, theres nothing they can really do.

So if my experience is any indication, the fire service trains to prevent fire spreading and then does its best to put the fire out when they can.
 

gravitystorm

Member
Joined
25 Nov 2021
Messages
102
Location
Motspur Park
Oy, what a sorry mess this is. The absolute last thing Glasgow needed was a kick to the ecomonical groin of this size and scale.
And this is what I don't understand. With the station closed, the railway must be losing a large amount of fares. Anyone got an estimate?

Let's make up some numbers and say it's £250k+ per day, and say £2+ million per day impact to the wider economy. So you could spend up to £250k per day (every day!) on mitigation measures to get the services up and running and still break even compared to waiting another day or three for everything to be ship-shape.

You could knock temporary exits through walls, set up contraflows through the vehicle ramp, employ 200+ people for crowd control, charter a Chinook with a big claw to lift away the remains of the building, <insert daft idea here>. But I'm amazed that, with the scale of daily losses, there won't even be a single train run into the station tomorrow. Where's the urgency? Why aren't they paying someone 300k to install a crash deck above the concourse this afternoon, just in case, if that could bring forward reopening by a few hours? Why isn't the government taking a whole-society view and spending millions per day on this?

I'm sure there's dozens of people from the railway who are working hard on this, but the scale of the response doesn't seem to match the scale of the disruption.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,283
Location
Glasgow
And this is what I don't understand. With the station closed, the railway must be losing a large amount of fares. Anyone got an estimate?

Let's make up some numbers and say it's £250k+ per day, and say £2+ million per day impact to the wider economy. So you could spend up to £250k per day (every day!) on mitigation measures to get the services up and running and still break even compared to waiting another day or three for everything to be ship-shape.

You could knock temporary exits through walls, set up contraflows through the vehicle ramp, employ 200+ people for crowd control, charter a Chinook with a big claw to lift away the remains of the building, <insert daft idea here>. But I'm amazed that, with the scale of daily losses, there won't even be a single train run into the station tomorrow. Where's the urgency? Why aren't they paying someone 300k to install a crash deck above the concourse this afternoon, just in case, if that could bring forward reopening by a few hours? Why isn't the government taking a whole-society view and spending millions per day on this?

I'm sure there's dozens of people from the railway who are working hard on this, but the scale of the response doesn't seem to match the scale of the disruption.
Because Network Rail cannot do anything until Glasgow City Council has inspected the site of the collapsed building and the remains and decided the appropriate action up to and including full demolition.

And the City Council can't do that until the Fire Brigade hand over the site, which hasn't happened yet.

Even once that's done the station won't re-open until:

- the roof is throughly inspected, if safe then...
- OLE & signalling equipment is inspected and if necessary repaired. If working then...
- public address system needs checked before station can legally open to passengers

Then there's general clean-up and if necessary, segregating areas/doorways of the station to permit safe access.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
And this is what I don't understand. With the station closed, the railway must be losing a large amount of fares. Anyone got an estimate?

Let's make up some numbers and say it's £250k+ per day, and say £2+ million per day impact to the wider economy. So you could spend up to £250k per day (every day!) on mitigation measures to get the services up and running and still break even compared to waiting another day or three for everything to be ship-shape.

You could knock temporary exits through walls, set up contraflows through the vehicle ramp, employ 200+ people for crowd control, charter a Chinook with a big claw to lift away the remains of the building, <insert daft idea here>. But I'm amazed that, with the scale of daily losses, there won't even be a single train run into the station tomorrow. Where's the urgency? Why aren't they paying someone 300k to install a crash deck above the concourse this afternoon, just in case, if that could bring forward reopening by a few hours? Why isn't the government taking a whole-society view and spending millions per day on this?

I'm sure there's dozens of people from the railway who are working hard on this, but the scale of the response doesn't seem to match the scale of the disruption.

Let's be real, bringing the reopening forward by a few hours is neither here nor there when looking at the bigger picture.

Besides, nothing can be done until the fire is confirmed as out anyway.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,283
Location
Glasgow
Let's be real, bringing the reopening forward by a few hours is neither here nor there when looking at the bigger picture.

Besides, nothing can be done until the fire is confirmed as out anyway.
And that is the key first stage, before anything else can be done at all.
 

35B

Established Member
Joined
19 Dec 2011
Messages
5,362
And this is what I don't understand. With the station closed, the railway must be losing a large amount of fares. Anyone got an estimate?

Let's make up some numbers and say it's £250k+ per day, and say £2+ million per day impact to the wider economy. So you could spend up to £250k per day (every day!) on mitigation measures to get the services up and running and still break even compared to waiting another day or three for everything to be ship-shape.

You could knock temporary exits through walls, set up contraflows through the vehicle ramp, employ 200+ people for crowd control, charter a Chinook with a big claw to lift away the remains of the building, <insert daft idea here>. But I'm amazed that, with the scale of daily losses, there won't even be a single train run into the station tomorrow. Where's the urgency? Why aren't they paying someone 300k to install a crash deck above the concourse this afternoon, just in case, if that could bring forward reopening by a few hours? Why isn't the government taking a whole-society view and spending millions per day on this?

I'm sure there's dozens of people from the railway who are working hard on this, but the scale of the response doesn't seem to match the scale of the disruption.
These are listed buildings, so the option of just doing something isn't necessarily viable. Similarly, the station hasn't yet been handed back by the fire brigade - so how are builders supposed to start on that crash deck? Let alone that work like that needs a) to built using scaffolding, which itself takes time to erect, and b) be designed.

As a passenger, I'm not going to be comfortable going through a station that is either a danger zone or a construction site, let alone both - which means that my fares wouldn't be forthcoming anyway.
 

D1537

Established Member
Joined
11 Jul 2019
Messages
2,027
Location
North Yorkshire
Let's make up some numbers and say it's £250k+ per day, and say £2+ million per day impact to the wider economy. So you could spend up to £250k per day (every day!) on mitigation measures to get the services up and running and still break even compared to waiting another day or three for everything to be ship-shape.
I doubt if the hit to the wider economy is that much. People will not stop going to work, they'll find another way of doing it (I suppose a few might work from home). Most long-distance travellers will go via Edinburgh or Motherwell, or they'll fly, or they'll go on the coach, or they'll drive. Obviously the hit to the railway itself is more of an issue.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
And this is what I don't understand. With the station closed, the railway must be losing a large amount of fares. Anyone got an estimate?

Let's make up some numbers and say it's £250k+ per day, and say £2+ million per day impact to the wider economy. So you could spend up to £250k per day (every day!) on mitigation measures to get the services up and running and still break even compared to waiting another day or three for everything to be ship-shape.

You could knock temporary exits through walls, set up contraflows through the vehicle ramp, employ 200+ people for crowd control, charter a Chinook with a big claw to lift away the remains of the building, <insert daft idea here>. But I'm amazed that, with the scale of daily losses, there won't even be a single train run into the station tomorrow. Where's the urgency? Why aren't they paying someone 300k to install a crash deck above the concourse this afternoon, just in case, if that could bring forward reopening by a few hours? Why isn't the government taking a whole-society view and spending millions per day on this?

I'm sure there's dozens of people from the railway who are working hard on this, but the scale of the response doesn't seem to match the scale of the disruption.
Go too soon, and bring the station roof down on top of people, and you'll lose a hell of a lot more money.

In order to have anybody in the station, even workmen installing a crash deck (which would need to be designed first, by the way), requires approval from the Fire service that it's safe for them to be there. Waiting for the SFRS to declare the scene safe, then the structural engineers to declare the building safe, is the only course of action that can reasonably be taken.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,376
Location
Lichfield
I doubt if the hit to the wider economy is that much. People will not stop going to work, they'll find another way of doing it (I suppose a few might work from home). Most long-distance travellers will go via Edinburgh or Motherwell, or they'll fly, or they'll go on the coach, or they'll drive. Obviously the hit to the railway itself is more of an issue.

Indeed, as we saw a couple of years ago with the national strikes, people will complain but realistically, it's a few days of pain and people find workarounds the everything returns to normality.
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,658
Location
SW London
In this case they had to pump water from the Clyde. In a place without a massive river nearby, definitely not.

Very interesting and eye-opening article about the shop where it started and fire safety enforcement generally.

Bet they weren't insured either, so the neighbouring businesses will ahve to rely on their own insurance
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,658
Location
SW London
Why isn't the government taking a whole-society view and spending millions per day on this?
Who says they're not? There must be people working very hard designing and planning what to do, obtaining the necessary materials, lining up cranes and other plant. Trying to get stuck in before you've decided what to do can be a false economy - HS2 being the classic example.
 

N1

Member
Joined
10 Aug 2022
Messages
385
Not suggesting it could be used now, more just out of interest. How many trains could be turned around an hour using Exhibition Centre siding. Could you run say an hourly Shotts service and hourly Lanark service? Would also have to be enough 318s and 320s to run said services.
 

WTT Gremlin

Member
Joined
1 Apr 2025
Messages
139
Location
Northampton
Health and safety getting silly now. I doubt turning the power on is going to cause anything bad to happen.
Yes... because sure turning on the 25kV circuit with 'bare wiring' in an area where colossal amount of water has been sprayed without doing any safety checks is is the rational thing to do.
Where have I claimed to be an expert?
May not have claimed to be an expert, but did consider yourself knowledgeable enough regarding 25kV electrical systems which 'bare wiring' in an area where colossal amount of water has been sprayed without conducting any safety checks, to both pass judgement on others actions, and make a statement regarding the safety risk.

So if... you are as you say not an expert... then how about not making judgemental comments about others actions... or statements on the safety of system than even when working normally has the potential to cause fatal harm?

== Doublepost prevention - post automatically merged: ==

Not suggesting it could be used now, more just out of interest. How many trains could be turned around an hour using Exhibition Centre siding. Could you run say an hourly Shotts service and hourly Lanark service? Would also have to be enough 318s and 320s to run said services.
A quick look at the Scotland TPR on the NR website would indicate about 6 turnrounds/hour with the services terminating/starting at Anderston. That would depend on what else is using the line, and how the timings match up with the WTT parts of those routes/wider timetable.
 
Last edited:

380101

Member
Joined
18 Feb 2015
Messages
1,137
Yes... because sure turning on the 25kV circuit with 'bare wiring' in an area where colossal amount of water has been sprayed without doing any safety checks is is the rational thing to do.

Whilst the overheads were isolated during the ongoing fire, they are nowhere near where the building that was on fire was. They are about 150 - 200m away at the other end of the station.

== Doublepost prevention - post automatically merged: ==

Not suggesting it could be used now, more just out of interest. How many trains could be turned around an hour using Exhibition Centre siding. Could you run say an hourly Shotts service and hourly Lanark service? Would also have to be enough 318s and 320s to run said services.

Services via Shotts require 380s or 385s and a Conductor (158s also run over the route but this is maintenence moves and again the crews don't sign the low level). None of the crews that sign the Shotts line or 380/385s sign the low level.
 

N1

Member
Joined
10 Aug 2022
Messages
385
Services via Shotts require 380s or 385s and a Conductor (158s also run over the route but this is maintenence moves and again the crews don't sign the low level). None of the crews that sign the Shotts line or 380/385s sign the low level.
Makes sense, is the extent of 318/320 route knowledge as far as Carstairs, and do crews that sign low level Argyle line sign to Lanark?
 

Warrior2852

Member
Joined
27 Oct 2018
Messages
315
Wonder why Edinburgh via Shotts isn't being done, that's some quite long distance (relatively speaking compared to some other commuter lines in the area) journeys with more limited alternative transport options, still being cancelled entirely any closer to Glasgow than West Calder.
 
Last edited:

godfreycomplex

Established Member
Joined
23 Jun 2016
Messages
1,749
Wonder why Edinburgh via Shotts isn't being done, that's some quite long distance (relatively speaking compared to some other commuter lines in the area) journeys with more limited alternative transport options still being cancelled entirely any closer to Glasgow than West Calder.
A fair few of those passengers are also in easy reach (and have largely already transferred to) the Airdrie to Bathgate line
 

Peter0124

Established Member
Joined
20 Nov 2016
Messages
2,740
Location
Glasgow
Wonder why Edinburgh via Shotts isn't being done, that's some quite long distance (relatively speaking compared to some other commuter lines in the area) journeys with more limited alternative transport options still being cancelled entirely any closer to Glasgow than West Calder.
Imo they should have done that over Lanark, as Holytown through to West Calder still has no service. Whereas Lanarks can start from Motherwell.
 

D6130

Established Member
Joined
12 Jan 2021
Messages
8,926
Location
West Yorkshire/Tuscany
Imo they should have done that over Lanark, as Holytown through to West Calder still has no service. Whereas Lanarks can start from Motherwell.
I wonder what equally stops the Shotts line services running from Motherwell as well?
Platform capacity at Motherwell I would have thought.... especially with the hourly Avanti terminating there.
 

318266

Member
Joined
30 Sep 2017
Messages
874
Location
S&W of Alexander Dennis, N&E of Wrightbus
Platform capacity at Motherwell I would have thought.... especially with the hourly Avanti terminating there.
Could they not try to tie it in with the other Lanark service? To extend the present hourly service to Motherwell calling all stations would arrive at ~xx42, which matches well with the ~xx47 to Lanark. In the return direction, the ~xx15 arrival from Lanark would match slightly less well with a ~xx27 departure north, but it could always just wait time further down at Holytown or Carfin.
 
Last edited:

Rail Ranger

Member
Joined
20 Feb 2014
Messages
1,111
As someone mentioned on WNXX it would be good if Avanti called at Lockerbie through the day. Lockerbie is normally served by TPE.
 